Original source · versioned page text
15-001261-111
From the archive OpWks.submission.ES&C.25.06.15.zip, inside OPW15/0099 Erosion & Sediment Control plans. File date in the archive: 2015-06-25 14:25.
RL OF SPILLWAY - 101.5
RL WATER PONDING LEVEL - 101.5
RL SEDIMENT DEPTH - 100.5
WIDTH OF SPILLWAY WEIR - 13.0m
MINIMUM PONDING VOLUME = 1320m?
NOTE:
BASIN LEVELS ARE A GUIDE ONLY
AND ARE TO BE CONFIRMED ON SITE
TO SUIT BEST WITH NATURAL
TERRAIN. CONTRACTOR TO ENSURE
MINIMUM VOLUMES ARE ACHIEVED.
TEMPORARY SEDIMENT BASIN 2 - x ms
BASE AREA - TO SUIT ULTIMATE NU 4
RL INVERT OF BASIN - 100.0 N TEMPORARY
RL TOP OF BATTER - 102.0 (MIN) \ SEDIMENT
BASIN 2
Sinai
vif
oP
STORMWATER BASIN TO BE UTILISED AS
A TEMPORARY SEDIMENT BASIN DURING
THE CONSTRUCTION PHASE.
__. MINIMUM VOLUMES ARE ACHIEVED.
HYDROMULCH BATTER.
7
/
| ¢
SEDIMENT FENCE ALONG EXISTING DOWNSTREAM
- BOUNDARIES PRIOR TO ANY CONSTRUCTION.
ENSURE
-
Lae <x —
es. eee
/ & _ALUBHOUSE PAD <<.”
a STORMWATER BASIN TO BE UTILISED AS
/; / A TEMPORARY SEDIMENT BASIN DURING
f Pe THE CONSTRUCTION PHASE. ENSURE
gah
MINIMUM VOLUMES ARE ACHIEVED. =<
/ aS
{Wt 7° NOTE:
ltl /_JCLUB HOUSE AND POOL AREA PADS
|| \o / |TO BE TOPSOILED AND DIRECT
SEEDED AS SOON AS PRACTICAL.
Ce eee cg iss . BASE AREA - TO SUIT ULTIMATE
TEMPORARY
‘ HYDROMULCH BATTER RL INVERT OF BASIN - 101.0
; / ‘SEDIMENT BASIN 3. RL TOP OF BATTER - 103.0 (MIN)
JOINS SHEET 1
a
TEMPORARY SEDIMENT BASIN 3 -
RL OF SPILLWAY - 102.5
RL WATER PONDING LEVEL - 102.5
RL SEDIMENT DEPTH - 101.5
WIDTH OF SPILLWAY WEIR - 9.0m
MINIMUM PONDING VOLUME = 930m?
NOTE:
BASIN LEVELS ARE A GUIDE ONLY
AND ARE TO BE CONFIRMED ON SITE
TO SUIT BEST WITH NATURAL
a yy y TERRAIN. CONTRACTOR TO ENSURE
wf ws MINIMUM VOLUMES ARE ACHIEVED.
Kay scaler /
| 682 eae.
u aa 4
A é 1 .
A 2 7 é ~
| a es ee hs i m
7 7 fs Ee Yr
| Le 81 af a” iit I to
1 11 2 7 Ee Z4yx! IN § to
= al > 5 = Z IK N a Re Jz
7TTi Smeal at eye / / Viet Ral [a Fee wn
UGS i | 7 / 4 re IN Ds
z Ee iy Ov ks 7 A Z ba 1 es 2 \ 4 4 : g
j Pp 2 80 Ieee of ~ ee y23 |e
92 | 93 4 I lal as aia : ein Fe /8
9 ~ eg ey p = a iS a 1 =
LEE os J
ye y I oe © Ry ; . va
Bz d Vi i j S ‘ Ns
oe: oy; s “
4 vacate! ss Y dt Sa
5 i ( K
4 eae ee ae
gr) 96 | 95 Wx | ; q.
p Mi Is
e
+ ap
oye =
Nee
< ELM STREET
rer X S-OOUET MILE HO OOLESC KB-ANZSBASE X_1S-A0126CUTRLLHATCH X_15-0161 CONTS USR: mark hastings REF NO. 132007.2398.02
fe [ar fr fais == ait sp Laypotene Stract: Chelmer QLD 4068 PALM LAKE WORKS PTY LTD Cc con Ponun SEDIMENT AND EROSION CONTROL
e : (i 0 6S 0 10 20 “\ Mob: 0412 744 223 E: [email protected] — al p Zw y EARTHWORKS PHASE LAYOUT
i Peaway ieee Prowse Be “emmowss 1d 19 TRADING POST ROAD H Calibre Consuting (QLD) Pty Ltd ‘Quai PLAN SHEET 2 OF 3
D
: 15-001261 _. COOROY callore Sree Stent in QD a ty 2 Para =
i ti rons on seuir dle touts cworeTY ED PALM LAKE RESORT CONSULTING Tepe O05 44 Fao 7375340 SS 15-001261-111
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.