Skip to the record
Accept no substitutions.

Original source · versioned page text

Annex 1 - Noosa River Habitat Survey Report - ESP

Attached to the e-mail DA Application - Noosa Oyster Project (1 of 3).

of 25

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                   Ecological Service Professionals
                                                                                    Sustainable Science Solutions




5.       Recommendations
We would recommend that a suitable monitoring program is implemented in accordance with
the monitoring program outlined in the implementation plan (TNC 2021), including the
following:
     •   Implementation of a suitable Construction Environmental Management Plan to
         support works including marine biosecurity measures for construction vessels;
     •   Have a suitably qualified person monitor the success of the restoration effort in
         accordance with the parameters identified in the implementation plan, including
         stability of the reef and successful recruitment of oysters to the substrate;
     •   Have a suitably qualified person monitor the distribution, composition and condition of
         marine plant assemblages within 50 m of the reef patches before construction, and
         post deployment until it is demonstrated that restoration of oyster reefs is complete
         (i.e. approximately 3 years post deployment); and,
     •   Have a suitably qualified person monitor water quality at each site, upstream and
         downstream of the sites, pre-, during and post-construction. A suitable suite of
         parameters should be measured including turbidity, salinity, dissolved oxygen and pH
         in accordance with Noosa River environmental values and water quality objectives
         (DERM 2010) and Plan WQ1401.
Craig, if you have any questions or require any modifications to the above scope, please let
me know.


Regards,


Dr Simon Walker | Principal Ecologist
Ecological Service Professionals Pty Ltd




6.       References
ESP 2021. Noosa Estuary Trial Oyster Reef Restoration: Final Monitoring Report. Report prepared on
     behalf of Noosa Biosphere Reserve Foundation for Noosa Council.
DERM 2010. Environmental Protection (Water) Policy 2009, Noosa River Environmental Values and
    Water Quality Objectives.
The Nature Conservancy (TNC) 2021. Noosa River Oyster Ecosystem Restoration Project:
     Implementation Plan.



Noosa Oyster Reef Restoration: Marine Benthic Habitat Assessment                                             25
Log in to download the original file

Annex 1 - Noosa River Habitat Survey Report - ESP.pdf · 2.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.