Original source · versioned page text
2022-06-07 Planning & Environment Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 JUNE 2022
d. reference the Vegetation Management and Covenant Area Rehabilitation
Concept Plan;
e. reference the Covenant Area Management Plan (or similar);
f. reference the Bushland Rehabilitation Program (or similar);
g. reference the Firebreak Trail Specification;
h. reference the Bushfire Hazard Assessment and Management Plan;
i. detail no fence construction to occur in covenant areas and fire break trail; and
j. reference the requirement for minimum 1.2m metre high dog proof fence along
the entire common boundary of the vegetation protection covenants.
k. detail any future fencing around the external boundaries of the site to be fauna
friendly.
l. allow the developer and his representatives to maintain the rehabilitation within
the Covenant Areas on all Lots during the entire maintenance period.
11. The vegetation protection covenant areas within each Lot must result in an area of not
less than the areas detailed within the Locality and Site Plans 21598-P001 Rev D
prepared by TOD Consulting Engineers and Project Managers and as amended by
conditions of this approval.
12. If a provision included in the covenant document is requisitioned or refused registration
by the relevant titles authority, a substitute provision must be included in the document
which as nearly as practicable addresses the objective sought by the requisitioned or
refused provision. The wording of the substitute provision must be agreed by Council.
Staging
13. The development is to be staged in accordance with the Locality and Site Plans 21598-
P001 Rev D prepared by TOD Consulting Engineers and Project Managers and as
amended by conditions of this approval with proposed Lot 8 requiring rehabilitation to
be installed in accordance with an Operational Works Approval prior to the sealing of
the Survey Plan for Stage 1.
14. Stage 2 area must be maintained and managed until commencement of Stage 2 to not
cause environmental impacts including but not limited to erosion and sediment control,
weed invasion control, fire mitigation measures (e.g. mown grass).
Land Rehabilitation
15. Rehabilitation works must be undertaken in accordance with the Approved Vegetation
Management and Covenant Area Rehabilitation Concept plan and in accordance with
an Operational Works approval and the Noosa Plan 2020 and Planning Scheme Policy
- PSP 2 Landscaping with the exception of:
15.1 The inclusion of additional maintenance schedule requirements within the
Vegetation Management and Covenant Area Rehabilitation Concept plan
including:
15.1.1 Weed management to maintain a weed free zone around each
planted tubestock, mulch replenishment when required. Watering
when required.
15.1.2 Tree guarding of species susceptible to fauna damage.
15.1.3 Replacement of all dead tubestock.
15.1.4 3 Monthly (or as required) weed maintenance within the assisted
natural regeneration areas.
15.2 The inclusion of additional rehabilitation Performance Objectives including:
Page 27 of 83
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.