Original source · versioned page text
2022-06-07 Planning & Environment Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 JUNE 2022
a. may be drawn upon by Council in its entirety if any one tree identified for retention
is damaged to the point where the tree cannot be saved (as confirmed by the
project arborist and agreed in writing by Council).
b. will be returned upon practical completion of all the operational works relating to
this development.
27. The tree/s identified for retention in the conditions of this approval listed within this
Decision Notice must be maintained in good health for the life of the tree.
Vegetation Management
28. An arborist’s report prepared by a suitably qualified person* is to be submitted for
approval as part of the operational works application/s. The purpose of the arborist’s
report is to identify the vegetation proposed to be removed on site. The vegetation to
be retained in the vicinity of vegetation to be removed must be identified and tree
protection measures detailed within the report.
The works must be undertaken in accordance with an Operational Works approval.
(*Refer Advisory Note)
Works within Protected Land
29. The following works must be undertaken for each stage within the land to be covered
by the vegetation protection covenants prior to the submission of the sealing of the
survey plan:
a. Treatment and control of declared plants under the Biosecurity Act 2014 and all
undesirable species as listed in Planning Scheme Policy 3 Landscaping Plants
and Guidelines to prevent regrowth.
b. Plantings in accordance with the Approved Vegetation Management and
Covenant Area Rehabilitation Concept plan and a Covenant Area Management
Plan (or similar) and a Bushland Rehabilitation Program (or similar) prepared by
a qualified person* and endorsed through an Operational Works approval.
c. Removal of any structures, debris or materials foreign to a natural environment
The works must be undertaken in accordance with an Operational Works approval.
*(Refer to Advisory Note)
Fauna Management
30. Vegetation must only be removed or disturbed in accordance with a Fauna
Management Plan (or part thereof) prepared by a qualified person* and endorsed
through an Operational Works approval.
*(Refer to Advisory Note)
31. Any domestic cats kept at all Lots must be permanently confined within buildings and/or
cat enclosures for the purpose of protecting proximate wildlife. A clause must be
included in the contract of sale which alerts purchasers to the requirement of this
condition.
Fencing to Protected Land
32. A permanent fence must be constructed around the entire perimeter of the vegetation
protection covenant area. The fence must be constructed in accordance with an
Operational Works approval and must be to the following specification:
a. Fauna friendly fencing on all covenant boundaries (1.2 metres high, 3 strand plain
wire (no barb), Bottom strand no less than 300mm off the ground;
b. 1.2 metre high dog proof fence along the entire common boundary to the
vegetation protection covenants.
Page 30 of 83
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.