PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 JUNE 2022
Services
56. Underground reticulated electricity and telecommunication services must be provided
to Lots 1 - 7 in accordance with the standards and requirements of the relevant service
provider.
57. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
58. Certification must be submitted to Council from all relevant service providers (Energex
and NBN) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
59. Easements for drainage purposes must be registered in favour of Council against the
title of all lots. The easements must fully contain those parts of the subject site below
the 1%AEP flood level.
60. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
61. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard
easement terms. Draft easement documentation must be submitted to Council for
endorsement.
62. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
63. All fill and associated batters must be undertaken in accordance with an Operational
Works approval, and be generally in accordance with drawing No. 21598-P003,
Revision E prepared by TOD engineering dated 2305.2022 and the approved flood
investigation or as amended by conditions herein. The earthworks must be completed
prior to the sealing of the survey plan for Stage 2.
Damage to Services and Assets
64. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
B. Include the following property notes against the subject property in Council’s property record
system:
RAL21/0033 - Property Access Driveway
1. The following notation applies to the approved lots:
Private Certifiers, owners and prospective purchasers are notified that special access
requirements apply to this parcel of land. Contact Council's Planning Department for
details.
RAL21/0033- Property Access
2. The following notation applies to approved lots 3 and 4:
Page 35 of 83
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.