Skip to the record
Every meeting, every word.

Original source · versioned page text

2022-06-07 Planning & Environment Meeting Agenda

of 83

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      7 JUNE 2022


     Services
     56.   Underground reticulated electricity and telecommunication services must be provided
           to Lots 1 - 7 in accordance with the standards and requirements of the relevant service
           provider.
     57.   Unless otherwise stipulated by telecommunications legislation at the time of
           construction, the development must be provided with all necessary conduits, pits and
           pipes to accommodate the future connection of optic fibre technology
           telecommunications.
     58.   Certification must be submitted to Council from all relevant service providers (Energex
           and NBN) which certifies that the development has met the requirements of this
           Decision Notice and all applicable legislation at the time of construction.
     Easements
     59.   Easements for drainage purposes must be registered in favour of Council against the
           title of all lots. The easements must fully contain those parts of the subject site below
           the 1%AEP flood level.
     60.   Unless otherwise agreed in writing by the relevant service provider, any public or third
           party infrastructure located on the subject site must be placed within an easement
           registered against the title of the property.
     61.   All easements must be designed in accordance with the planning scheme and granted
           at no cost to the Grantee. Where the Grantee is Council or a service authority, the
           easement documentation must be in accordance with the Grantee’s standard
           easement terms. Draft easement documentation must be submitted to Council for
           endorsement.
     62.   All works must be kept clear of any existing or proposed easements on the subject
           land, unless agreed otherwise in writing by the Grantee.
     Earthworks and Retaining Walls
     63.   All fill and associated batters must be undertaken in accordance with an Operational
           Works approval, and be generally in accordance with drawing No. 21598-P003,
           Revision E prepared by TOD engineering dated 2305.2022 and the approved flood
           investigation or as amended by conditions herein. The earthworks must be completed
           prior to the sealing of the survey plan for Stage 2.
     Damage to Services and Assets
     64.   Any damage caused to existing services and assets as a result of the development
           works must be repaired at no cost to the asset owner at the following times:
           a.    where the damage would cause a hazard to pedestrian or vehicle safety,
                 immediately; or
           b.    where otherwise, upon completion of the works associated with the development.
           Any repair work which proposes to alter the alignment or level of existing services and
           assets must first be referred to the relevant service authority for approval.
B.   Include the following property notes against the subject property in Council’s property record
     system:
     RAL21/0033 - Property Access Driveway
     1.    The following notation applies to the approved lots:
           Private Certifiers, owners and prospective purchasers are notified that special access
           requirements apply to this parcel of land. Contact Council's Planning Department for
           details.
     RAL21/0033- Property Access
     2.    The following notation applies to approved lots 3 and 4:

                                                                                     Page 35 of 83
Log in to download the original file

2022-06-07 Planning & Environment Meeting Agenda(PDF, 8MB).pdf · 8.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.