PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     7 JUNE 2022


    Landscaping
    9.    The development site must be landscaped in accordance with the approved site plan
          and be provided to a minimum of 15% of the site. The works must be undertaken in
          accordance with an Operational Works approval and PSP2 Landscaping in Noosa
          Plan, for that specific area and must include in particular:
          a.    the works shown on the Approved Plans;
          b.    A 2 metre wide landscaping strip along the Rene St road frontage of the subject
                site, exclusive of the access driveway;
          c.    All landscape works must be established and maintained in accordance with the
                approved design for the life of the development, and in a manner that ensures
                healthy, sustained and vigorous plant growth. All plant material must be allowed
                to grow to full form and be refurbished when its life expectancy is reached.
          d.    All landscape works must be maintained generally in accordance with the
                approved design for the life of the development.
    Stormwater Drainage
    10.   The site must be provided with a stormwater drainage system connecting to a lawful
          point of discharge. The works must be undertaken in accordance with an Operational
          Works approval and generally in accordance with report titled “Preliminary Stormwater
          Management Plan”, rev 0, dated 7 October 2021 and prepared by RECOR Pty Ltd.
    Easements
    11.   Unless otherwise agreed in writing by the relevant service provider, any public or third
          party infrastructure located on the subject site must be placed within an easement
          registered against the title of the property.
    12.   All easements must be designed in accordance with the planning scheme and granted
          at no cost to the Grantee. Where the Grantee is Council or a service authority, the
          easement documentation must be in accordance with the Grantee’s standard
          easement terms. Draft easement documentation must be submitted to Council for
          endorsement.
    13.   All works must be kept clear of any existing or proposed easements on the subject
          land, unless agreed otherwise in writing by the Grantee.
    Earthworks and Retaining Walls
    14.   All fill and associated batters must be contained entirely within the subject site unless
          written permission from the respective landowner(s) is provided to Council. All
          earthworks must be undertaken in accordance with the provisions of Australian
          Standard AS3798: Guidelines on Earthworks for Commercial and Residential
          Developments.
    15.   Where the development involves excavation or filling over, or adjacent to, drainage,
          water supply or sewerage infrastructure, all access chamber surface levels must be
          adjusted to provide a freeboard of 100mm above the finished ground surface level.
    16.   All retaining walls must be designed and constructed in accordance with the planning
          scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
          retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
          with a commercial grade safety fence.
    Damage to Services and Assets
    17.   Any damage caused to existing services and assets as a result of the development
          works must be repaired at no cost to the asset owner at the following times:



                                                                                   Page 47 of 83
Log in to download the original file

2022-06-07 Planning & Environment Meeting Agenda(PDF, 8MB).pdf · 8.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.