Development Application - Part 1 of 2 - Covering Letter, CD Verification, IDAS Forms 1 & 6 and IDAS Checklist 1 & 4, Smart EDA Summary Document Register & Document List · OPW11/0196

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                                                                                       CE
                                                 Place Barcode here
                                                                                                            /I I I I IihI iIihI I ihI I I I I/ / / / / / /
                    THIS IS THE NEXT PART OF A
               MULTIPLE PART RECORD
       4
  3        S

e
wcC^vE
               pplication number: oP w <<^^o ^,cl
                      C\Documents and Scttings\eje\Desktop\Multi Pan Record Cover Sheet NEXT PART (3).doc




      /92b9    /0
Full text of the other 26 pages

Page 2

Page 3

                                             TATE PROFESSIONAL ENGINEERS PTY LTD
                                                                     ABN 28 086 262 035

                                                  39.45 FIRST AVENUE, MOOLOOLABA QLD 4557
                                                         P.O. BOX 1092, MOOLOOLABA QLD 4557
Our Reference:            S3000(RF -Lot 9)                                                           CIVIL ENGINEERING
                                                      PHONE (07) 5457 5300 FAX ((17) S47' f. tilt)   STRUCTURAL ENGINEERING

                                         WEB www.tate.net.au EMAIL [email protected]             PROJECT MANAGEMENT
8th June 2011



Sunshine Coast Regional Council
Locked Bag 72
SUNSHINE COAST MAIL CENTRE
NAMBOUR QLD 4560

Attention: Mr Mark Lewis




Dear Sir

RE: PROPOSED RESIDENTIAL UNIT DEVELOPMENT
     AT LOT 9,16 SERENITY CLOSE, NOOSA HEADS - LOT 9 SP 195871
     OPERATIONAL WORKS APPLICATION

Please find enclosed the following documentation to support an Operational Works
application for the above project-

       •   Three (3) sets of engineering drawings as per attached transmittal;
       •   Three (3) copies of Stormwater Management Plan by Tate Professional
           Engineers dated June 2011.
       •   Completed IDAS Forms 1 and 6 and Assessment Checklists 1 and 4;
       •   Cheque for the amount of $ 7,920.00 covering application fees in accordance
           with SCRC Fees and Charges 2010/2011 - (site area 5,001m2 to 2.Oha).

We trust this adequately addresses all issues and ask that Council confirm approval of
the application. Please contact the undersigned at our Mooloolaba office should you
require any further information.




                                                                                           7pment C               -,     r



`Steve-Harrison - Director
                                                                                              1 0 JUN M-11
 for TATE PROFESSIONAL ENGINEERS PTY LTD
                                                                                           a roochv ..:
Encl       IDAS Forms & Checklists, cheque $ 7,920.00
           3 sets of Drawings as per register
           3 x Stormwater Management Plan Report


CC:        Cape Bouvard Developments - Attention: Gary Godfrey



S3000(Council App)/11 /OPW Application tune 2011- SCRC
SH/jl                                                                                                     Page 1 of 1

Page 4

Page 5

                                                                            (date)

The Chief Executive Officer
Sunshine Coast Regional Council
PO Box 76
NAMBOUR OLD 4560

Attention:          Development Assessment Counter - Nambour / Maroochydore
OR
                                                   (relevant officer)


                                              of
                            (print name)                                             (company)

am submitting the attached

Q`' CD and/or

Cl documents

on                 (today's date) in support of application number:_ - -

I hereby certify that what I am submitting at this time is a true, genuine and complete copy of the
information previously supplied by

q email

V'C D

q hard copy

on ___ 611'1 (date - today's date if you are submitting items at the same time).

I understand that the first copy submitted of any information is the legal binding document captured
in Council's records management data and used for assessing and determining development
applications.



                            ignature)                                                      (Date)

Att,c      ants:

0    D in PDF format with each document not exceeding 40MB) plus five (5) hard copies of each
document (for Development Application)

q 1 CD (in PDF format with each document not exceeding 40MB) plus three (3) hard copies of
each document (for Building Application)

q _ additional copies of plans/information


PD-DA •FM282/2.17/12/2008                                                                   Page 1 of 1

Page 6

                                                        Smart eDA - electronic WAS

                                                                                                                  t

     FTT                     Integrated Development Assessment System form


Application Details - IDAS form 1
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)



You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.

For all development applications, you must:

•      complete this form (Application details - IDAS form 1)
•      complete any other forms relevant to your application
•      provide any mandatory supporting information identified on the forms as being required to accompany your
       application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.


Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)


Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.


Name/s (individual or company name in full)                   TATE PROFESSIONAL ENGINEERS


For companies, contact name                                   STEVE HARRISON

                                                              PO Box 1092
Postal address
                                                              Mooloolaba Qld 4557

Contact phone number                                          5457 5300


Mobile number (non-mandatory)


Fax number (non-mandatory)


e-mail address (non-mandatory)




1. What is the nature of development proposed? (tick all applicable boxes)


q     material change of use of premises

q     building work

® operational work
q     reconfiguring a lot




    Department of Infrastructure and Planning                            QPlan                       Queensland
                                                                                                     Government

Page 7

2. What type of approval is being sought?


® development permit
q    preliminary approval
q    both - provide details below



3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?


® No

q     Yes - complete table A and then go to question 5




4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)

Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises

                                                                               Lot on plan
               Street Address
                                                                               description
                                                                                                      Local government area
               Unit Street         Street name and official         Post              Plan type          (e.g. Logan,Cairns)
                                                                           Lot No
                                                                               No.
               No.    No.           suburb/locality name            code             and plan no.

                             SERENITY CL NOOSA                                                      SUNSHINE COAST
           1         16                                         4567       9         SP1 95871
                             HEADS                                                                  REGIONAL

    Street address / lot on plan
  Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
q water e.g. jetty, pontoon)
                             SERENITY CL NOOSA                                                      SUNSHINE COAST
           2         14                                         4567       8         SP195871
                             HEADS                                                                  REGIONAL

    Street address / lot on plan
  Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
q water e.g. jetty, pontoon)
Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)

               Coordinates (note: place each set of
               coordinates in a separate row)                           Zone                               Local government
                                                                                         Datum
                                                                      reference                            area (If applicable)
                 Easting     Northing        Latitude   Longitude
                                         -26.39503      153.08451                       GDA94            SUNSHINE COAST
                                                                                                         REGIONAL
                                         9              1                            q WGS84
           1
                                                                                     q other



                                         -26.39479      153.08389                       GDA94            SUNSHINE COAST
                                         1              7                                                REGIONAL
                                                                                     q WGS84
           2
                                                                                     q other




5. Total area of the premises on which the development is proposed (indicate hectares or m2)

12,454 m2

                                                                                                  Application Details - IDAS form 1
                                                                                                    Version 1.0 18 December 2009

Page 8

16. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)


          1   VACANT LAND


7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)


PROPOSED 22APARTMENTS


8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)


® No

q    Yes - complete either table D, table E or table F as applicable



Table D (note: do not complete this table if lodging the application on-line using Smart eDA)


Name of owner/s of the land        I


I/We, the above-mentioned owner/s of the land, consent to the making of this application.


Signature of owner/s of the land


Date


Table E


Name of owner/s of the land

 q The owner's written consent is attached or will be provided separately to the assessment manager


Table F


Name of owner/s of the land

   By making this application, I, the applicant, declare that the owner has given written consent to the making of
 q the application.


9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)


® No                            [] Yes - complete table G



10. Identify if any of the following apply to the premises (tick applicable box/es)


q      adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H

q      on strategic port land under the Transport Infrastructure Act 1994 - complete table I

q      in a tidal water area - complete table J




                                                                                         Application Details - IDAS form I
                                                                                           Version 1.0 18 December 2009

Page 9

11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
    water, etc.)

® No        Yes - ensure the type, location and dimension of each easement is included in the plans submitted

12. Does the proposal include new building work or operational work on the premises? (including any
    services)

q No ® Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted

13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
    end of this form for more information)


® No - Go to question 15                    q Yes


15. Has the local government agreed to apply a superseded planning scheme to this application under
    section 96 of the Sustainable Planning Act 2009?


® No

q    Yes - provide details below



16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)

                                                                                                   Method of lodgement to
                             Description of attachment or title of attachment
                    •   IDAS Form 6                                                                 assessment manager
                    •   IDAS Checklist 1
            1       •   IDAS Checklist 2
                    •   3 x copies Stormwater Management Plan by Tate Professional Engineers

17. Applicant's d •     Engineering Drawings in accordance with attached drawing register
                  •     Cheque $ 7,920.00

® By making this application, I declare that all information in this application is true and correct (note: it is
    unlawful to provide false or misleading information).




                                                                                               Application Details - IDAS form 1
                                                                                                Version 1.0 18 December 2009

Page 10

Notes for completing this form

Question 8:
•  Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
   for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
   required under section 263, then an application must contain, or be accompanied by, the written consent of the
  owner, or include a declaration by the applicant that the owner has given written consent to the making of the
   application.
•  Owner's consent is not required for a mobile and temporary ERA.

Question 9:
•     Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
      regulation may require the application to be supported by certain evidence prescribed under the regulation.
      Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
      required to be given, and the evidence required, to support the application.

Question 13:
•  The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
   long service leave levy is payable.
•  The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
   are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:
•  The portable long service leave levy need not be paid when the application is made, but the Building and
   Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
   permit is issued.
•  Building and Construction Industry Notification and Payment Forms are available from any Queensland post
   office or agency, on request from QLeave, or can be completed on the QLeave website at
   www.qleave.qld.gov. au. For further information contact QLeave on 1800 803 481 or www.gleave.gld.gov.au.

Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.

                                  CVl_"
OFFICE USE ONLY

                        e41JNsett
Date received                                 Reference numbers


NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER


                                                       Council. I have been engaged as the private certifier for the
To:
                                                       building work referred to in this application.


Date of                                                                    BSA Certification      Building
                      Name
engagement                                                                 license number         classification/s




                                                                                         Application Details-- IDAS form I
                                                                                           Version 1.0 18 December 2009

Page 11

ni
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)


                                                                              Date receipted
                                      QLeave Project   Amount                 form sighted by Name of officer who
              Description of the work                             Date paid
                                      Number           paid ($)               assessment      sighted the form
                                                                              manager




The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.




                                                                                     Application Details - IDAS form 1
                                                                                       Version 1.0 18 December 2009

Page 12

                                                           Smart eDA - electronic IDAS



     FI-1 I                    Integrated Development Assessment System form


Building or operational work assessable
against a planning scheme - IDAS form 6
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

This form must be completed for development applications for building works or operational work assessable against
a planning scheme.

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.

For all development applications, you must:

•      complete Applicant details - IDAS form 1

•      complete any other forms relevant to your application
•      provide any mandatory supporting information identified on the forms as being required to accompany your
       application.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

This form can also be used for development on strategic port land under the Transport Infrastructure Act 1994.


1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)


q building work - complete table A                    ® operational work - complete table B



Table B


          What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)


          q road works                    ® stormwater                   ® water infrastructure

          ® drainage Works                ® earthworks                   ® sewerage infrastructure

          q landscaping                   q signage                      q clearing vegetation under the planning scheme

          q other - please specify below


          What type of approval is being sought? (if you have indicated multiple works in the above question, please
          use an attachment to this form to detail each approval request)


          ® development permit                 q preliminary approval                q both - specify below


          Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)


          ® No          q Yes - specify the number of lots being created


          Are there any current approvals associated with this application? (e.g. material change of use)


          [] No         ® Yes - provide details below


                   List of approval reference/s                             Date approved             Date approval lapses




    Department of Infrastructure and Planning                             QPIan

Page 13

   qq
               MCU    .   200x/ 1 -715                        • !3 Put      u. 1 og              2013
2. What is the dollar value of the proposed building work? (inc GST, materials and labour) $ 76000




                                        Building and operational work assessable against a planning scheme - IDAS form 6
                                                                                            Version 1.0 18 December 2009

Page 14

3. Confirm the following mandatory supporting information accompanies this application
                                                                                 Confirmation
                                                                                                   Method of lodgement
                                                                                 of lodgement
All applications for operational works

site plans drawn to scale which show the following:
•   the location and site area of the land to which the application relates
    (relevant land)
•   the north point
•   the boundaries of the relevant land
•   the allotment layout showing existing lots, any proposed lots (including
    the dimensions of those lots), existing or proposed road reserves,           ®confirmed        mail
    building envelopes and existing or proposed open space (note:
    numbering is required for all lots)
•   any existing or proposed easements on the relevant land and their
    function
•   any access limitation strips
•   all existing and proposed roads and access points on the relevant land

a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents                   q confirmed
relevant to the application

Applications for operational works involving earthworks (filling and excavating)


drawings showing:
•   existing and proposed contours
•   areas to be cut and filled
•   the location and level of any permanent survey marks or reference
    stations used as datum for the works                                            confirmed      mail
•   the location of any proposed retaining walls on the relevant land and
    their height
•   the defined flood level (if applicable)
•   the defined fill level (if applicable)

Applications for operational works involving roadworks

drawings showing:
•   existing and proposed contours
•   the centreline or construction line showing chainages, bearings, offsets
    if the construction line is not the centreline of the road and all
    intersection points
• information for each curve including tangent point chainages and
    offsets, curve radii, arc length, tangent length, superelevation (if
    applicable) and curve widening (if applicable)
•   kerb lines including kerb radii (where not parallel to centreline) and
    tangent point changes (where not parallel to centreline)
•   edge of pavement where kerb is not constructed                               q confirmed
•   position and extent of channelisation
• location and details of all traffic signs, guideposts, guardrail and other
    street furniture
•   pavement markings including details on raised pavement markers
•   catchpit, manhole and pipeline locations
•   drainage details (if applicable)
•   cross road drainage culverts (if applicable)
•   concrete footpaths and cycle paths
•   location and details for access points, ramps and invert crossings
•   changes in surfacing material

                                              Building and operational work assessable against a planning scheme - IDAS form 6
                                                                                                  Version 1.0 18 December 2009

Page 15

        IF
                                                                                 Confirmation
                                                                                                   Method of lodgement
                                                                                 of lodgement
Applications for operational works involving stormwater drainage

drawings showing:
• existing and proposed contours
•   drainage locations, diameters and class of pipe, open drains and
    easements
                                                                                    confirmed      mail
•   manhole location, chainage and offset or co-ordinates and inlet and
    outlet invert levels
•   inlet pit locations, chainage and offset or co-ordinates and invert and
    kerb levels
Applications for operational works involving water reticulation


drawings showing:
•   kerb lines or edge of pavement where kerb is not constructed
• location and levels of other utility services where affected by water
    reticulation works
•   pipe diameter, type of pipe and pipe alignment
•   water main alignments
                                                                                 Z confirmed       mail
•   water supply pump station details (if applicable)
•   minor reservoir details (if applicable)
•   conduits
• location of valves and fire hydrants
• location of house connections (if applicable)
• location of bench marks and reference pegs
Applications for operational works involving sewerage reticulation

drawings showing:
•   location of all existing and proposed services
•   location of all existing and proposed sewer lines and manhole locations
•   location of all house connection branches
•   kerb lines or edge of pavement where kerb is not constructed
•   chainages
                                                                                    confirmed      mail
•   design sewer invert levels
•   design top of manhole levels
•   type of manhole and manhole cover
•   pipe diameter, type of pipe and pipe alignment
•   location of house connections (if applicable)
•   sewer pump station details (if applicable)

Applications for operational works involving street lighting

drawings showing:
• location of all light poles and service conduits
• location of all other cross road conduits
• type of wattage and lighting
•   any traffic calming devices
                                                                                    confirmed
•   additional plans for roundabouts and major roads (if applicable)
•   details of any variations to normal alignment
•   details of lighting levels




                                              Building and operational work assessable against a planning scheme - IDAS form 6
                                                                                                  Version 1.0 18 December 2009

Page 16

     X01
                                                                                       Confirmation
                                                                                                         Method of lodgement
                                                                                       of lodgement
 Applications for operational works involving public utility services

 drawings showing:
 •   any existing light poles and power poles
 •   any existing underground services
                                                                                       q confirmed
 •   details of proposed services
 •   alternation to existing services
 Applications for operational works involving landscaping works

 drawings showing:
 •   the location of proposed plant species
 •   a plant schedule indicating common and botanical names, pot sizes
     and numbers of plants
 •   planting bed preparation details including topsoil depth, subgrade
     preparation, mulch type and depth, type of turf, pebble, paving and               Liconfirmed
     garden edge
 •   the location and type of any existing trees to be retained
 •   construction details of planter boxes, retaining walls and fences
 •   the proposed maintenance period
 • irrigation system details

 Notes for completing this form:
 •   This form can also be used for development applications for building works or operational works assessable
     against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
     mentioned, take it to mean the land use plan for the airport land.



 Privacy -please refer to your assessment manager for further details on the use of information recorded in
^ this_farm.
                                i
                                    nay; il.    r
OFFICE USE ONLY


 Date Received                                 Reference Numbers

           Maroach^dore
The Sustainable Planning Ac          is a mini tered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.




                                                    Building and operational work assessable against a planning scheme - IDAS form 6
                                                                                                        Version 1.0 18 December 2009

Page 17

                                                           Smart eDA - efectmnk IDAS



    I



Development assessment checklist - IDAS
checklist 1
(Sustainable Planning Act 2009, version 1.0 18 December 2009)


This checklist applies to the carrying out of development generally.

You are not required to complete this checklist as part of your development application, however you may submit the
checklist with your application if you wish. The purpose of the checklist is to assist you in identifying:

•   whether you need to make a development application for the proposed development

•   if a development application is required, the relevant IDAS forms you need to complete as part of your application
•   whether you need to give a copy of your application to any referral agencies.
If your development involves a material change of use, reconfiguring a lot or operational works, it is recommended
that you complete Material change of use - IDAS checklist 2, Reconfiguring a lot - IDAS checklist 3 or Operational
works - IDAS checklist 4, as applicable.

If you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the
Department of Infrastructure and Planning's website at www.dip.qld.gov.au.

All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.


Part 1 - General questions


1.1 Have you received a referral agency response in relation to this proposed development prior to making
an application?


®No
                     To assist you in preparing your application, completing Referral agency responses - IDAS checklist
q Yes
                     6 is recommended


1.2 Do you wish the proposed development to be assessed against a superseded planning scheme?


® No

                     You must complete Request to apply a superseded planning scheme - Sustainable Planning Act
q Yes                form 2 and give this notice to the relevant local government. If the local government agrees to
                     your request, details must be provided in Application details - IDAS form 1



11.3 Does the proposal involve removing quarry material from a watercourse or lake for which an allocation
notice is required under the Water Act 2000?


    No

q Yes                 It is recommended that you complete part 2 of this checklist


1.4 Is any part of the proposed development intended to be carried out on a Queensland heritage place under
the Queensland Heritage Act 1992?


® No

0 Yes I.              It is recommended that you complete part 3 of this checklist

Page 18

1.5 Does the proposal involve development on a local heritage place?


Z No

q Yes              It is recommended that you complete part 4 of this checklist



1.6 Does the proposal involve an environmentally relevant activity, other than an agricultural ERA, a mining
activity or a chapter 5A activity?


® No

q Yes              It is recommended that you complete part 5 of this checklist


1.7 Is any part of the development on strategic port land or airport land (other than development for a
material change of use that is inconsistent with the land use plan for the strategic port land or airport land)


®No

q Yes              It is recommended that you complete part 6 of this checklist


1.8 Is any part of the development on land below a high water mark within the limits of a port under the
Transport Infrastructure Act 1994?


® No

q Yes              It is recommended that you complete part 7 of this checklist


1.9 Is any part of the premises designated for community infrastructure?


® No

q Yes              It is recommended that you complete part 8 of this checklist


1.10 Does the proposal involve the establishment or expansion of a waste water disposal system?


   No

   Yes I•          It is recommended that you complete part 9 of this checklist


1 1.11 Is the development on land that adjoins a declared fish habitat area under the Fisheries Act 1994?


ZNo

q Yes              It is recommended that you complete part 10 of this checklist


Privacy - please refer to your assessment manager for further details on the use of information recorded in
this checklist.

Disclaimer:
   While the Department of Infrastructure and Planning (DIP) believes that this information contained on this
   checklist and provided as part of this process will be of assistance to you, it is provided on the basis that you will
   not rely on the information without first making your own enquiries regarding the interpretation and application of
   the applicable legislation to your circumstances.

   To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
   negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or
   other consequence which may arise from your reliance on this process and the information contained on this
   checklist.



                                                              Development application assessment checklist - IDAS checklist I
                                                                                              Version 1.0 18 December 2009

Page 19

o     t'dsE:ow        n

Date received    10 JUN 2011            Reference numbers
                                                                ooPvvk`\
The SuA,,#a>¢I      r rFiycy^4 h^ is administered by the Department of Infrastructure and Planning.




                                                         Development application assessment checklist - IDAS checklist I
                                                                                         Version 1.0 18 December 2009

Page 20

                                                        Smart eDA- elecfrontc IDAS
                                                                                             o Q v :. (     O C( kD
      _ IT
Operational Works - IDAS Checklist 4 10 JUN 2011
(Sustainable Planning Act 2009, version 1.0, 18 December 2009)                        i vl a r o o c h y d o re
                                                                                L
This checklist only applies when the development application seeks approval for operational works.
You should complete all questions unless the checklist indicates otherwise.

All planning and development applications require applicants to complete the following:
•         Applicant details --IDAS form 1
•         any forms or mandatory supporting information identified as forming part of your application.
If you are unsure of any answers to questions, phone or visit your local government, or go to the Department of
Infrastructure and Planning's website, www.dip.gldd gov.au.
The checklist and relevant sections do not need to be completed for applications relating only to building work
requiring assessment against the Building Act 1975.


Part 1 - General questions

1.1         Is the proposed operational work assessable under the planning scheme?


q No
                •        You must complete Building and operational work assessable against a planning scheme - IDAS
® Yes                    form 6
                •        Continue on to question 1.3

1.3         Is any part of the premises located in part of a future state-controlled road or within 100 metres of a
            state-controlled road?


® No            •        It is recommended that you complete part 2 (starting from question 2.1) of this checklist.

q Yes           •        It is recommended that you complete part 2 (starting from question 2.2) of this checklist.

1.4         Does State Planning Policy 2/02: Planning and Managing Development Involving Acid Sulfate Soils
            apply to the development?

      N

q Yes                    It is recommended that you complete part 3 of this checklist.


1.5        Is there any proposed operational work for filling or excavation?


® No                     It is recommended that you complete part 4 (starting from question 4.5) of this checklist.

q Yes                    It is recommended that you complete part 4 (starting from question 4.1) of this checklist.




    Department of Infrastructure and Planning                         QP1an

Page 21

1.6         Is any of the proposed operational work listed in schedule 12 of the Sustainable Planning Regulation
            2009 and does it exceed the specified threshold?


Z No
                •      This application requires assessment by the Department of Transport and Main Roads as a
q Yes
                       concurrence agency

Section reference:
•           Sustainable Planning Regulation 2009, schedule 7, table 3, item 14

1.7         Is any of the proposed operational work listed in schedule 13 of the Sustainable Planning Regulation
            2009 and does it exceed the specified threshold?


      No
                       This application requires assessment by the Department of Transport and Main Roads as a
q Yes
                       concurrence agency

Section reference:
•           Sustainable Planning Regulation 2009, schedule 7, table 3, item 15


1.8         Is any part of the premises in an interim koala habitat protection area identified under the South East
            Queensland Koala state planning regulatory provisions (SEQ Koala SPRP)?


® No

q Yes           •       It is recommended that you complete part 5 of this checklist.


1.9         Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is
            also assessable?


® No

      Yes               It is recommended that you complete part 6 of this checklist.


1.10        Does the Vegetation Management Act 1999 apply to any of the proposed operational work for the
            clearing of native vegetation?

® No

q Yes           •       It is recommended that you complete part 7 of this checklist.


1.11        Is any of the proposed operational work for any thing constructed or installed that allows, under the
            Water Act 2000, for taking or interfering with water from a watercourse, lake or spring (other than
            using a water truck to pump water; and other than under the Water Act 2000, section 20(2), (3) or (5),
            or from a dam constructed on a watercourse or lake?


® No                    It is recommended that you complete part 8 (starting from question 8.8) of this checklist.

q Yes                   It is recommended that you complete part 8 (starting from question 8.1) of this checklist.


1.12        Is any of the proposed operational work tidal work, other than excluded work defined under the
            Sustainable Planning Regulation 2009?

® No
q Yes                   It is recommended that you complete part 9 of this checklist.




                                                                                          operational works - IDAS checklist 4
                                                                                                  Version 1.0 December 2009

Page 22

1.13        Is any of the operational work proposed to be carried out within a coastal management district?


® No

      Yes                It is recommended that you complete part 10 of this checklist.


1.14        Is any of the proposed operational work for constructing or raising waterway barrier works under the
            Fisheries Act 1994?


® No

q Yes                    It is recommended that you complete part 11 of this checklist.


1.15        Is any of the proposed operational work to be carried out completely or partly within a declared fish
            habitat area under the Fisheries Act 1994?


® No
q Yes
      No                 It is recommended that you complete part 12 of this checklist.


1.16        Is any of the proposed operational work removing, destroying or damaging marine plants under the
            Fisheries Act 1994?

® No

F-1 Yes                  It is recommended that you complete part 13 of this checklist.


1.17        Is any of the operational work proposed to be carried out in a wild river area declared under the Wild
            Rivers Act 2005?

® No

q Yes                    It is recommended that you complete part 14 of this checklist.


1.18        Is any part of the premises located in part of a future state-controlled road or within 100 metres of a
            state-controlled road?

® No

q Yes                    It is recommended that you complete part 15 of this checklist.

2.1         Is the proposed operational work for filling or excavating listed in the Sustainable Planning
            Regulation 2009 schedule 11 and does it exceed the threshold or combined threshold?


® No            •        End of part 2 of this checklist.
                •        This application requires assessment by the Department of Transport and Main Roads as a
q Yes
                         concurrence agency.

            End of part 2 of this checklist.


Section reference:
•           Sustainable Planning Regulation 2009, schedule 7, table 3, items 1(b) and 2


4.5         Is any part of the premises subject to an e asement in favour of the holder of Pipeline Licence Number
            1 issued under the Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane
            strategic pipeline?

® No                     End of part 4 of this checklist.

q Yes           •        This application requries assessment by the pipeline licence holder as an advice agency.




                                                                                             ational works - IDAS checklist 4
                                                                                                 Version 1.0 December 2009

Page 23

            ][
8.8              Is any of the proposed operational work for any thing constructed or installed that allows, under the
                 Water Act 2000, for taking or interfering with artesian water (other than using a water truck to pump
                 water)?


      No

                     •       You must complete Taking artesian or sub-artesian water - IDAS form 12.
      Yes            •       This application requires assessment by the Department of Environment and Resource
                             Management as a concurrence agency.



8.9              Is any of the proposed operational work for any thing constructed or installed that allows, under the
                 Water Act 2000, for taking overland flow water (other than using a water truck to pump water)?


® No                 •       Go to question 8.12.

      Yes


18.12            Is any of the proposed operational work for any thing constructed or installed that allows, under the
                 Water Act 2000, for taking or interfering with subartesian water (other than using a water truck to
                 pump water)?


® No                 •       Go to question 8.14
[] Yes


8.14             Does any of the proposed operational work for any thing constructed or installed that allows, under
                 the Water Act 2000, for interfering with overland flow water (other than using a water truck to pump
                 water)?


Z No                         Go to question 8.19

q Yes


8.19             Is the proposed operational work for the following?


for the construction of a referable dam as defined under the Water Supply (Safety
                                                                                              q Yes             ® No
and Reliability) Act 2008
to increase the storage capacity of a referable dam by more than 10 per cent                 I q Yes            Z No



                 If yes to any of the above you must complete Referable dam - IDAS form 16.
                 This application requires assessment by the Department of Environment and Resource Management
                 (DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
                 concurrence agency and you must give DERM a copy of the application




                                                                                             Dperational works - IDA S checklist 4
                                                                                                     Version 1.0 December 2009

Page 24

   lqq
Notes for completing this form:
•      Applicant details - IDAS form I and Development application assessment - IDAS checklist I must be
       completed for all development applications to be considered.
•      The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.

Privacy - please refer to the assessment manager for further details on the use of information recorded in
this form.

Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that the information contained on this form and
provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the
information without first making your own enquiries regarding the interpretation and application of the applicable
legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
consequence which may arise from your reliance on this process and the information contained on this form.




                                                                                         Operation'il works - IDAS checklist 4
                                                                                                 Version 1 0 December 2009

Page 25

                                                                                                     Queensland
Smart eDA                                                                                            Government

 Smart eDA ID 1307051502054



 Application Summary


 Details

 Created:                     June 03, 2011

 Applicant:

 Type of application:




 Locations

9SP195871
16 SERENITY CL, NOOSA HEADS 4567
SUNSHINE COAST REGIONAL
8SP195871
14 SERENITY CL, NOOSA HEADS 4567
SUNSHINE COAST REGIONAL
Total 2 locations / 1.2454 hectares




Interested parties

Party / Role                                              Lodged / Referred at                 Reference #
Tate Professional Engineers
Applicant
                                 Your proposal does not contain any Assessing Authorities




IDAS forms

Name                                                                                        Status   Last Modified

IDAS Form 1 - Application Details                                                           Updated 03/06/2011


IDAS Form 6 - Building or operational work assessable against a planning scheme             Updated 03/06/2011


IDAS Checklist 1- Development assessment checklist                                          Updated 03/06/2011


IDAS Checklist 4 - Operational Works                                                        Updated 03/06/2011




Other information

Description/From                                                                                     Date

State Assessments                                                                                            3 Jun 2011
                                                                                                                08:59:49

Page 26

                                        TITEPROFESSIONAL ENGINEERS


                     DOCUMENT DISTRIBUTION REGISTER
No 1 The Esplanade. Maroodrydora                                                                        Ph. (07) 5443 2300 Fax (07) 5443 7126
PO Box 204. Maroodrydora. Old. 4558                                                                                Email    ineera ate nel au



PROJECT:              SETTLERS COVE DEVELOPMENT                                                  JOB No:                 S3000
CLIENT:               CAPE BOUVARD DEVELOPMENTS PTY LTD                                          PAGE No:                1 OF 1

No.       DOCUMENT TITLE             DOC. No.                                                     REVISION
 1. Tate Professional Engineers S3000/L7&8/08/SMP
    Stormwater Management Plan Dated October 2008
    dated October 2008
 2. Tate Professional Engineers S3000/L5&6/11/SMP
    Stormwater Management Plan      APRIL 2011
    LOTS 5 & 6 dated APRIL 2011
 3. Tate Professional Engineers  S3000/L9/11/SMP
    Stormwater Management Plan      JUNE 2011
    LOT 9 dated JUNE 2011




                                                                                             DATE O F ISS UE
                                                 Issue                  1     2       3     4   5      6    7             8        9      10
                                                 Day                   03    05      26    08
                                                 Month                 10    04      05    06
                                                 Year                  08    11      11    11

                        DISTRIBUTION REGISTER                                        COP IES / REASON F OR ISSUE
1.     Sunshine Coast Regional Council                                 4/a
1.     Cape Bouvard Developments                                       1/x
2.     Sunshine Coast Regional Council                                       2/a     3/a
2.     Cape Bouvard Developments                                             1/X
3.     Sunshine Coast Regional Council                                                     3/a
3.      ape Bouvard Developments



A - Approval                          B - Building Approval       C - Construction                  P - Preliminary
R - Revision                          T - For Tender              X - Information



Practice Manual                                               Page 1 of I                                           Form No. F08(b)/0

Page 27

                                                                         TATS PROFFESIONAL ENGINEERS PTY LTD
                                                                         A.B.N. 28 086 262 035
                                                                         39-45 First Avenue,
                                                                         P.O. Box 1092, MOOLOOLABA, 4557
                                                                         Ph. (07) 5457 5300 Fax (07) 5477 6100
           PROFESSIONAL ENGINEERS
                                                                         Web: http://www.tate.net.au
                                                                         Email: [email protected]


 PROJECT: PROPOSED DEVELOPMENT                                       JOB No. S300o/L9

 CLIENT: CAPE BOUVARD DEVELOPMENTS PTY LTD                       PAGE No. i

                                          DATE OF      DD 10
                                          ISSUE       MM 06
                                                       YY 11
 DOCUMENT TITLE                                 DOC No.   REVISION




 DISTRIBUTION REGISTER                                                   COPIES / REASON FOR ISSUE
SUNSHINE COAST REGIONAL COUNCIL (N   A)
CAPE BOUVARD (GARY GODFREY)




                     A - Approval            B - Building Approval          C - For Construction   P - Preliminary   e - Electronic Copy

                      R - Revision              T - For Tender                X - Information      # - Denotes A3


lersotce Manual                                         Page 1       1                                                 Form No F08i01

Used in these records

About this file

File size
4.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application - Part 1 of 2 - Covering Letter, CD Verification, IDAS Forms 1 & 6 and IDAS Checklist 1 & 4, Smart EDA Summary Document Register & D.pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗