Original source · versioned page text
NSC Development Permit - MCU17-0559.02
Original PDF page 9, section 4. The text section number identifies this passage in the reader.
22 .5
PO OL
OL
6. RETAINING WALLS EM
26.
All retaining walls and embankements are to comply with TA
5
10
20 29 20
10
28
KL .50 3 KI 02.50 4
10
20 73
BB .93 5
11
23 30
12
25 72
Ga
11
0.0 85
PL 00
RP
BCA, relevant Australian Standards and Council
01 02
EG
02
11
0.0 03
00
ST .55 0
01
BA
ST .39 7
03
DE
CK rd en
M 2.
00 0
139
10 10 Ga LC
ON
Y
77
20 30 20 31
.51 .50 rd en 4
legislation. Retaining walls shall have 65 Ø ag. pipe (to
KL 7 KI 10
01 02 326
20 11 11
.52
KI 02 0
KI 04
10
71
10
20
72 10
0.0 18
TR
00
0.3
00
34|782 11
11
24 9897
23 92
BR
.72
W02
7 12
25 11
FE .24 4
12
25 12 12 12
20 20 74 3 15 24 .74 TIM
FE .91 8 26 13
14
discharge to stormwater line) and granular backfill behind. EP .78 8 EP .81 1 BB .88 4
TR .76
FE W0 25 BE R 04 11
26
02 EUC 04 04 .18 FE .81 6
02 02 ALYP 2 TIM 0.0 83 11 FE 0 04
10 EG BE 00 0.0 84 04
241°48'10"
10 70 02 11 T R PL 00
0.0 01
241°48'10" 34.782m
20 69 20 M 2. PL
M 2.
EP
.74
7 EP .79 2 11 PL
00 00 0
00 0
02 02 M 2.
Concrete path
All retaining walls over one metre high must be designed
02
25.
0.0 00 0
PL 00
21.
10
22.
26.
M 2.
26.
20 35
10 10
KI 02.60 1 10
00 0
Stormwater U/G - Shown from Records
22.
37 20 36
23.
23.
20 .56
KL .59 3KI 04 5 20 68
.74
by a registered engineer.
10 01 EP 6
20 38
SW
5
02
10
KI 03.72 2
5
20 75
5
5
0
BB .88 6
0
02
0
5
EG
21.
02
7. LANDSCAPING EM
0
Site works indicated on this plan are for construction TB
Shown from Records
Dr RP
2
Stormwater U/G -
ive 139
purposes only. It is the client's responsibility to carry out RL way GT
21 | Leve 77 P1
all landscaping. 40 l 4 03
16
4
The finished ground immediately surrounding the
residence shall fall away from the residence at a slope of
not less than 50mm over the first 1m. SITE PLAN
Landscaping must not cover any weep holes within the
brickwork and must not allow termites to bridge any
1 1 : 200
visual, physical or chemical termite barrier.
NOTE : FINAL POSITIONS OF DOWNPIPES,
METERBOX, TAPS, AC ODU, WATERTANK, GAS
BOTTLES AND HOT WATER SYSTEM, MAY
DIFFER TO PLAN DUE TO SITE CONDITIONS.
Lot Number 87 PLANNING REQUIREMENTS PROVIDED DIFFERENCE
RP Number RP 92518
- SITE COVER: 40% = 238m² 233m² = 39% -5m²
NOOSA COUNCIL Local Authority NOOSA SHIRE R.C PLOT RATIO: 0.45:1 = 267m² 0.45:1 = 270m² 0.00:1 = 3m²
APPROVED PLAN Area 595m²
MCU17/0559.02 3 FEB 2020
PRELIMINARY DRAWING - NOT FOR CONSTRUCTION
Disclaimer: Revision Notes: Drawn By: MG Checked by: TG Dwg size: 1:100 @ A3 Proposed new residence for: Job No: Drawing Status:
H4 - PLAN DESIGN BUILD © COPYRIGHT Revision: 18
The information in these drawings pertaining to Rev. Date Amendment See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.