External Works
20. Grant Street must be upgraded for the length of its frontage to the subject site. The works
must be undertaken in accordance with an Operational Works approval and must include in
particular:
a. construction of a pedestrian footpath in accordance with the conditions of this Decision
Notice
b. removal of the existing property access and reinstatement of the kerb, footpath and
verge area to match the balance of the site frontage, including the provision of topsoil
and turf where the existing verge is grassed
Site Access and Driveways
21. A sealed access driveway must be provided from Grant Street to all parking and manoeuvring
areas of the development. The works must be undertaken in accordance with an Operational
Works approval and must include in particular a driveway crossover in accordance with
Council’s Standard Drawings RS-049 and RS-050 and any applicable addendum.
22. The driveway must be located clear of any existing services or drainage pits in the road
reserve.
Car Parking
23. A minimum of 4 car parking spaces must be provided and marked on the site. The works
must be undertaken in accordance with an Operational Works approval and must include in
particular dimensions, crossfalls and gradients in accordance with Australian Standard
AS2890: Parking Facilities.
24. All vehicles must enter and exit the site in a forward gear. The manoeuvring area within the
site must be kept clear of obstructions.
Pedestrian and Bicycle Facilities
25. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in particular
a 1.5 metre wide footpath within the road verge for the entire length of the site’s frontage to
Grant Street
Stormwater Drainage
26. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works
approval and must include in particular collection and discharge of stormwater to Council’s
existing drainage system in Grant Street.
Electricity and Telecommunication Services
27. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
28. Certification must be submitted to Council from all relevant service providers which certifies
that the development has met the requirements of this Decision Notice and all applicable
legislation at the time of construction.
Earthworks and Retaining Walls
29. All earthworks and associated batters/anchors must be contained entirely within the subject
site unless written permission from the respective landowner(s) is provided to Council. All
earthworks must be undertaken in accordance with the provisions of Australian Standard
AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
Page 4 of 8
Document Set ID: 21080952
Version: 4, Version Date: 04/02/2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.