Request for Further Information - 010.2008.00001704.001 [As Published] · 142008.1704
-2-
1.3.3. A reduction in the level of the jetty platform to the minimum required
above HAT and the provision of only a single stair access at the jetty
head / pontoon.
1.4. Materials and colours of all structures.
1.5. Elevations of the proposed structures indicating the various HAT, LAT, MHWS
and MLWS levels,
1.6. Please indicate on the plans that all sections of the existing structure located in
the river frontage of the subject property, both above and below water level,
have been removed or will be removed as part of these works.
2. Please provide an assessment of the proposed structures with regard to the relevant
specific outcomes of Schedule 4a - IDAS Code for development applications for
prescribed tidal work of the Coastal Protection and Management Regulation 2003.
3. Please provide certification from the design engineer that states that the design is in
accordance with the relevant engineering requirements of Schedule 4a - IDAS Code
for development applications for prescribed tidal work of the Coastal Protection and
Management Regulation 2003.
4. It is noted that the seaward piles appear to be located beyond the quayline indicated
on drawing WD.202 and drawing WD.710. Please provide comment on how this
configuration could be considered to be within the approved Water Allocation Area.
Under the provisions of the Integrated Planning Act 1997, you have three options available
in response to this Information Request. You may give the assessment manager (in this
instance Council) and each referral agency (if any):
1. all of the information requested; or
2. part of the information requested together with a letter asking the assessment
manager and each referral agency to proceed with the assessment of the application;
or
3. a letter:
(i) stating that you do not intend to supply any of the information requested; and
(ii) asking the assessment manager and each referral agency to proceed with the
assessment of the application.
Please be aware that under Section 3.2.12 of the Integrated Planning Act 1997, the
applicant is to respond to any information request within 12 months of the request or
otherwise, the application lapses.
A response to the above is required to be submitted, prior to further assessment of the
application. If any further matters arise as part of assessment of this application, you will be
advised accordingly.
Council prefers that all the information requested be submitted as one package. A
preliminary assessment only of the application has been undertaken and during the formal
decision stage, or as a result of public exhibition, other matters may arise.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request for Further Information - 010.2008.00001704.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 13 KB (small file)
- File type
No other editions are linked here.