Attachment 6B - Response to State Code 25 · MCU22/0118
PO5 Development is designed and sited 1. The revised plan submitted for assessment has been modified to avoid impacts on MSES, and the
to: evidence for this is submitted in the form of successive plans that improved ecological outcomes over time.
1. avoid impacts on matters of state Review of the plans back to the original (accepted) proposal clearly demonstrate: a) a reduced number of
environmental significance; or
proposed cabins across the site, b) a reduced impact footprint as a result, c) movement of structures in
2. minimise and mitigate impacts on
matters of state environmental response to ecological considerations over time, and d) changes to the location of parking and access to
significance after demonstrating decrease ecological impacts.
avoidance is not reasonably 2. Where avoidance is not possible, mitigation is proposed. For example. vehicular access to cabins (earlier
possible; and plans) was removed, but access is still required, so raised walkways are now included which will allow for
3. provide an offset if, after the safe and free movement of koalas (and other wildlife) through the site. In addition, access pathways
demonstrating all reasonable respond to the presence of trees and curve around, rather than removing the trees.
avoidance, minimisation and
3. Although it is considered that the residual impact will be negligible, and “offset” by improvements to tree
mitigation measures are
undertaken, the development results health, landscape stability, weed management, pest control and, significantly, by treatment of the road
in an acceptable significant network to improve koala safety, a detailed assessment of the final impact will require more detailed design
residual impact on a matter of to precisely capture tree loss and gains. As indicated above, the offset proposed is based on a residual
state environmental significance. impact of approximately 1 Ha.
Statutory note: For Brisbane core port land, an
offset may only be applied to development on land
identified as E1 Conservation/Buffer, E2 Open
Space or Buffer/Investigation in the Brisbane Port
LUP precinct plan.
Reconfiguring a lot
Performance outcomes Response
PO6 Development supports connectivity between highly connected Complies with PO#
patches of mapped koala habitat areas. Use this column to indicate whether compliance is achieved with the relevant PO (or if
they do not apply), and explain why
PO7 Interfering with koala habitat as a result of the development does
not compromise safe koala movement by preventing fragmentation of
patches of mapped koala habitat areas.
PO8 Interfering with koala habitat as a result of the development
supports connectivity between highly connected patches of mapped
koala habitat areas.
PO9 Development supports safe koala movement by preventing
fragmentation of patches of mapped koala habitat areas.
PO10 Development within a mapped koala habitat area is undertaken in a
way that prevents the risk of injury or death of koalas.
PO11 Development is designed and sited to:
1. avoid impacts on matters of state environmental significance; or
Attachment 3 - State Code 25: Development in South-East Queensland koala habitat areas: Response Template
Page 6 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6B - Response to State Code 25.pdfRelated documentApplication case desk ↗
About this file
- File size
- 249 KB (small file)
- File type
No other editions are linked here.