Original source · versioned page text
Representations
extensive rehabilitation measures already, which will be outlined as part of a future Operational
Works application.
Figures 1 and 2 below show the extent of a 20m wide buffer versus an outcome that is
considerate of the approved infrastructure, whilst providing a superior outcome.
Figure 1: Rehabilitation of riparian buffer area - as per Condition 9
Figure 2: Rehabilitation of riparian buffer area - as per setbacks in approved plans
2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.