51987.3790.03 - Applicant's Response
Refer to the below assessment of the proposed renovation against the Flood Hazard Overlay Code.
Flood Hazard Overlay Code - Table 8.2.6.3
Performance Outcomes Acceptable Outcomes Applicant’s Response
PO1 AO1
Complies
Development provides that for all The finished flood level is not less
flood events up to and including than the minimum design levels The proposed renovation will
the DFE : specified in Table 8.2.6.4 maintain the existing floor
a) the safety of people on the levels of the unit. No change
site is protected; and to the existing floor level of
b) the risk of damage to the unit is occurring.
property on the site is
As demonstrated by the
avoided or minimised as far
photographs taken during the
as practicable.
recent flood events of
February/March 2022
(Attachment 2), Unit 17 is sited
above the flood level.
PO2 AO2
Not applicable
All lots have sufficient area that is The minimum area above flood
above the DFE flood level or level (flood free area) for each lot, The proposed minor change is
where modelling is not available, is in accordance with Table 8.2.6.5. in relation to a renovation of
the highest recorded flood level, an existing unit.
to safely and adequately
accommodate the intended use.
PO3 AO3
Not applicable
For reconfiguring a lot or Development areas are not filled
operational works, development to reduce flood risk. No filling or earthworks are
is undertaken in a manner that proposed. The proposed
ensures: minor change is in relation to a
a) natural hydrological systems renovation of an existing unit.
are protected from erosion,
scour or flood damage on the
premises or other premises;
b) natural landforms and
drainage lines are
maintained to protect the
hydraulic performance of
waterways and flood plain;
and
c) development integrates with
the natural landform rather
than modifying the landform
to suit the development as
far as practicable.
PO4 AO4.1
Not applicable
For reconfiguring a lot, Development provides an
development does not effective evacuation route that The proposed minor change is
compromise the safety of people remains passable, with sufficient in relation to a renovation of
resulting from the flood risk flood warning time, to enable an existing unit.
associated with events people to progressively evacuate
exceeding the DFE. to safe areas above the PMF in
the face of advancing flood or
waters for events that exceed the
DFE.
OR
PO Box 1818 07 5474 3873
Noosa Heads [email protected]
QLD 4567 rgstrategic.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
51987.3790.03 - Applicant's Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 767 KB (small file)
- File type
No other editions are linked here.