Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Rfi - Swmp · MCU21/0156

of 34

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

5.2        Construction Phase


Sediment generated during the construction phase shall be controlled in accordance with a site specific
Erosion and Sediment Control (ESC) Plan and kept on site throughout construction.



5.2.1      Silt and Sediment Erosion



A potential for sediment mobilisation/transportation exists during and beyond the construction of the
proposed development. This can elevate turbidity levels of stormwater runoff.



A RUSLE assessment of the site confirms proposed development is a Low Risk for soil loss (< 150
Tonnes).



Potential Causes



           •    Stormwater scour and erosion of excavated or stripped surfaces and stockpiled soils.
           •    Wind borne transportation of sediments.
           •    Disturbance/breakup of soil profile via vehicular traffic followed by stormwater scour
                and erosion.
           •    Transportation of sediments from site via excavation vehicles.



Mitigating Measures



           •    Construction of silt fences around the development site located to cut off all runoff.
           •    Construction of a sediment basin throughout construction at a low point of the
                development site.
           •    Provide 80-100mm crushed rock (no fines) hardstand under all vehicle paths expected
                during construction. Generally, this would be provided from the existing crossover and
                extended to a distance within the site that would accommodate the maximum delivery
                vehicle length expected.

SCG Consulting Engineers                    Page 9                                  SCG Ref: 31131(SWMP)

Used in these records

About this file

File size
2.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI - SWMP.pdf · 2.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.