RFI - SWMP.pdf
Figure 5.2 – Music Modelling Results The modelling results show the pollutant reduction objectives are met for all contaminants listed in Table 5.1. Details of the proposed bio-retention basin are provided in the Stormwater Management Plan drawing no: SCG 31131- SW1.1 thru SW1.5 (Appendix D). 6.0 STORMWATER QUANTITY Noosa Shire Council’s Planning Scheme – Noosa Plan 2020, require post development peak flows leaving the development site will not exceed the pre-development peak flow rates for the required design storms. Peak flow increases will be minimised by the provision of an On-site Detention (OSD) basin fitted with a low flow orifice plate to detain a portion of the runoff from the site and limit the peak flow rates of pre-development levels. SCG Consulting Engineers Page 15 SCG Ref: 31131(SWMP)
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (RFI - SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.