ENGINEERING REPORT
Tincidunt ut
adipiscing elit,
quis nostrud
praeseptatum.
Proposed Mixed Use
Development
Corner Myall Street & Ferrells Road
Cooroy, QLD 4563
Engineering Report & Stormwater
Management Plan
Project No.: 14012
Revision: B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of pages 2 to 30 (of 103)
Page 2
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
Contents
1. Introduction ...................................................................................................................................... 3
a. Existing Topography ........................................................................................................................ 4
b. Proposed Land Use ......................................................................................................................... 4
2. Erosion and Sediment Control ......................................................................................................... 4
3. Earthworks ....................................................................................................................................... 6
4. Roadworks ....................................................................................................................................... 6
5. Stormwater Drainage ....................................................................................................................... 7
a. Stormwater Quality Management .................................................................................................... 8
b. Water Quality Objectives ................................................................................................................. 8
c. MUSIC Model .................................................................................................................................. 9
d. MUSIC Model Results.................................................................................................................... 14
e. Service Station and Car Wash Treatment ..................................................................................... 14
f. Stormwater Quantity Management ................................................................................................ 16
g. Maintenance .................................................................................................................................. 17
h. Flood Zoning .................................................................................................................................. 18
6. Sewer Reticulation ......................................................................................................................... 20
7. Water Reticulation ......................................................................................................................... 22
8. Electrical and Telecommunication ................................................................................................. 22
9. Acoustic Assessment..................................................................................................................... 22
10. Development Codes ...................................................................................................................... 23
11. Conclusions ................................................................................................................................... 23
Appendix A - Survey Plan ..................................................................................................................................... 24
Appendix B - Proposed Design Drawings ............................................................................................................. 25
Appendix C - Noosa Erosion and Sediment Control Assessment Form ............................................................... 26
Appendix D - IECA (Australasia) Standard Drawings ........................................................................................... 27
Appendix E - State Planning Policy December 2013 -Healthy Waters development assessment code ............... 28
Appendix F - SPEL Operations and Maintenance Manual .................................................................................... 29
Appendix G - Detention Calculations .................................................................................................................... 30
Appendix H - Development Codes ........................................................................................................................ 31
A PO Box 26, Carina Q 4152 1|P a g e
E [email protected]
W www.vtce.com.au
Page 3
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
Document Status:
REVISION PREPARED BY REVIEWED BY DATE
DRAFT A. van Tonder - 17/04/14
DRAFT A. van Tonder - 16/05/14
A A. van Tonder K. Sani 23/05/14
B A. van Tonder K. Sani 16/06/14
This document is produced by vT Consulting Engineers for the benefit and use by the client in accordance with the
terms of the agreement. vT Consulting Engineers does not and shall not assume any responsibility or liability
whatsoever to any third party arising out of any use or reliance by any third party on the content of this document.
A PO Box 26, Carina Q 4152 2|P a g e
E [email protected]
W www.vtce.com.au
Page 4
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
1. Introduction
vT Consulting Engineers has been commissioned by Verve Building Design & Concepts to
prepare this engineering services report and stormwater management plan. The development
is located at Corner Myall Street & Ferrells Road, Cooroy QLD 4563 (Lot 4 on SP248479). The
site locality is illustrated in Figure1.1. This report is being submitted to support the
Development Approval for the proposed Mixed Use Development for Noosa Regional
Council’s (NRC) consideration.
The following report will detail civil engineering requirements for the development.
Street Address Corner Myall St & Ferrells Rd, Cooroy QLD 4563
RP Description Lot 4 on SP248479
Total Site Area 67,710m2
Proposed Use Mixed Use Development
Local Authority Noosa Regional Council
Figure 1.1: Site Layout Plan (Google Maps)
A PO Box 26, Carina Q 4152 3|P a g e
E [email protected]
W www.vtce.com.au
Page 5
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
a. Existing Topography
The site is currently covered in grass with minimal vegetation except for a dense line of trees
running along the majority of the boundary to the site. A large area (approximately
10,700m2) to the East of the site is considered unusable land and will be left as is and used as
detention if required. There are also significant areas around the boundaries of the site to be
landscaped as buffer zones to the surrounding residential areas.
The levels on the site range from approximately RL121.3 in the South West corner down to
RL104.2 at the Eastern side of the site. A detailed survey has been conducted on this site by
Saunders Havill Group Pty Ltd, dated 17 March 2014. Refer to Appendix A for current survey
plan. The site is currently surrounded by undeveloped land to the South East and residential
land to the North West. The Bruce Highway lies to the South East of the site, and an existing
golf course to the North East of the site.
The existing lot is currently vacant and has not been developed in the past.
b. Proposed Land Use
The proposed development involves a new multi-use development and associated car parking
and internal roadworks. A proposed service station with a fast food drive thru outlet and a
supermarket are to be located to the North of the site, with a carwash facility to the South of
this. To the South of the site a proposed caravan tourist park is to be located, with a proposed
storage facility to the West of this.
Refer attached Appendix B for proposed layout plans and details.
2. Erosion and Sediment Control
Using the Noosa Sediment and Erosion Control Assessment form in Appendix C, it is
considered that the erosion risk proposed by the site is high as the proposed development
involves a large area of land which will only be exposed for a minimal amount of time during
the earthworks required for service trenching and constructing the building platforms and
roadworks. The trenches will only be exposed while the services are being installed and then
will be covered by the proposed building works. To further mitigate the impact of the
development construction an Erosion and Sediment Control Plan has been prepared and is
included in Appendix B. Appendix D shows the International Erosion Control Association
Australasia standard drawings and control notes applicable to this development.
The construction contractor is responsible for ensuring that soil and debris does not leave the
site as well as the confines of the construction zone and is not deposited on external roads or
existing in-use areas due to the proposed earthworks and construction activity.
A PO Box 26, Carina Q 4152 4|P a g e
E [email protected]
W www.vtce.com.au
Page 6
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
Acid Sulphate Soils
The local council is listed in Table 4: Acid sulfate soils-affected local government areas in State
Planning Policy December 2013 and therefore this development application requires
compliance with the State Planning Policy December 2013 acid sulfate soils development
objectives.
Acid sulphate soil testing is typically conducted in areas with reduced levels of less than 5.0m
Australian Height Datum (AHD) as stated in State Planning Policy December 2013. This policy
also states that developments below 20.0m AHD that involve a Material Change of Use or
operational works are required to be assessed against the State Planning Policy December
2013 acid sulfate soils development objectives. As the lowest point on this site is an
approximate level of RL140.2, we believe the probability of acid sulphate soil being present is
low and therefore testing would not be necessary.
As shown by the Cooroy & Lake Macdonald Natural Hazard: Bushfire & Acid Sulfate Soils
Overlay (Map OM3.4), the site is not expected to have acid sulphate soils.
The requirements for Acid Sulphate Testing will be confirmed by a geotechnical engineer prior
to the detailed design stage of this proposed development.
Land Disturbing Activities
Important causes/issues of erosion for this site would consist of the following:
• Precipitation and consequent run-off
• Stripping and removal of topsoil
• Removal of fill
• Other earthwork operations
• Heavy vehicle use on site
• Wind erosion
The proposed development is a short construction period which will be programmed so that
the shortest period of time elapses between ground cover removal and restoration.
Erosion and Sediment Control Measures
Sediment control filter fabric will be securely placed around the perimeter of the construction
site. This will ensure sediment is trapped before being released into the catchment. Refer
Appendix D.
An ESC measure will be provided at any vehicular access points to the site. Construction and
maintenance details are given in Appendix D. A temporary construction entrance will be
provided from Myall Street for access during construction.
A filter sock sediment trap will be utilized on all downstream stormwater inlets. Refer
Appendix D for construction and maintenance details.
A PO Box 26, Carina Q 4152 5|P a g e
E [email protected]
W www.vtce.com.au
Page 7
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
No clearing will be undertaken unless preceded or accompanied by installation of adequate
run-off and sediment control measures, as described above.
Following practical completion of the project a minimum of 70% coverage of all soil with
ground cover (i.e. topsoiling and seeding) will be provided within 30 calendar days.
During the construction phase spraying of water will be used with care to act as a dust
suppression method.
Monitoring and Maintenance Programs
Water discharge from the site will adhere to a total suspended solid content of less than 50
milligrams per litre and a pH range of between 6.5 and 8.5 at all times. If the pH of the
flocculated water is not achieved than pH adjustments will be required. This could possibly be
done by a dosing of lime.
Site personnel will inspect all erosion and control measures at least at the following
frequencies:
• Daily during construction works,
• Weekly when construction works are not happening,
• Within 24 hours of expected rain, and
• Within 18 hours of an impacting rainfall event.
All erosion and sediment control measures that have an order of efficiency below 75% will be
corrected by the end of that working day.
3. Earthworks
For the purpose of this proposed development earthworks will be conducted for constructing
the new proposed building platforms and roads. Excavation on site will be required for the
building platforms and service trenches. Any excess cut will need to be removed from the site
by the contractor. A geotechnical report will be prepared for the site during the detailed
design stage.
4. Roadworks
The proposed development fronts onto both Myall Street and Ferrells Road. External
roadworks are proposed for this development in accordance with the traffic impact
assessment report by Pekol Traffic and Transport, project number 13-081.
A new left turn auxiliary deceleration lane (AUL) into the new development is proposed for
traffic travelling from South to North along Myall Street. Dimensions are outlined in the traffic
impact assessment report and to be detailed as per Austroad’s: Guide to Road Design
A PO Box 26, Carina Q 4152 6|P a g e
E [email protected]
W www.vtce.com.au
Page 8
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
Manuals. A channelised right turn treatment (CHR) is proposed for Myall Street at the
entrance to the new development. This is for traffic travelling from North to South along
Myall Street. Dimensions are outlined in the traffic impact assessment report and to be
detailed as per Austroad’s: Guide to Road Design Manuals.
No external roadworks are proposed for Ferrells Road, however a new crossover will be
provided on Ferrells Road to service the new proposed multi-use development. The crossover
is to be concrete crossovers constructed to IPWEAQ standard drawing R-0051 Commercial
Driveway Slab Type A.
Internal roadworks are required for the new proposed multi-use development. Refer
attached Appendix B for proposed layout plans and details. Line marking and signage will be
used through the new proposed development to emphasise the intended direction of
vehicular flow in accordance with the Manual for Uniform Traffic Control Devices (MUTCD).
5. Stormwater Drainage
It is proposed that the stormwater drainage for the proposed multi-use development will be
piped to individual bio-retention basins for each area. Refer attached Appendix B for
proposed layout plans and details. The stormwater from the service station, fast food outlet,
food store and car wash areas and the associated car parking will be treated in a number of
basins to the South of the car wash area, as well as landscaping around the car parking. The
stormwater from the self-storage unit will be treated in a basin to the East of this unit. The
stormwater from the internal roadway will be treated in a basin in the verge of the internal
road. And the stormwater from the tourist park will be treated in a basin to the East of the
tourist park along the edge of the existing overland flow path. All these individual bio-
retention basins will flow into a large single detention basin located to the South of the site.
It is proposed that this detention basin will then drain to the existing overland flow path at the
South of the site via a new concrete headwall channelling the stormwater towards the two
existing box culverts under Myall Street. For more details refer to the engineering plans in
Appendix B.
As indicated by Cooroy & Lake Macdonald Natural Resources Overlay (Map OM3.5), the site is
located within the Lake Macdonald water supply catchment.
A PO Box 26, Carina Q 4152 7|P a g e
E [email protected]
W www.vtce.com.au
Page 9
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
a. Stormwater Quality Management
State Planning Policy
The State Planning Policy December 2013 applies for stormwater quality management and
management of new or expanded non-tidal artificial waterways applies to development that is
outlined below in Table 5.1.
HEALTHY WATERWAYS POLICY CHECKLIST YES / NO
Material change of use for urban purposes that involves a land area
greater than 2500m2 that:
will result in an impervious area greater than 25% of the net
developable area
YES
Will result in 6 or more dwellings NO
Reconfiguring a lot for urban purposes that involves a land area
greater than 2500m2 and will result in six or more lots:
YES
Operational works for urban purposes that involve disturbing more
than 2500m2 of land YES
Table 5.1: Water Quality Objectives
As the proposed development triggers one or more applicable items in the above Table 5.1,
the State Planning Policy December 2013 is applicable and compliance will be expected by the
local government authority.
To achieve the above State Planning Policy outcomes the development is to:
• avoid or minimise development impacts arising from altered stormwater
quality and flow by providing for development and construction activities in
accordance with acceptable design objectives
• avoid or minimise development impacts of waste water (other than
contaminated stormwater) on water quality objectives
• avoid or minimise development impacts arising from the creation or expansion
of non-tidal artificial waterways such as urban lakes
The proposed development will comply with the State Planning Policy December 2013 -
Healthy Waters policies.
A copy of the completed State Planning Policy December 2013 —Healthy Waters development
assessment code is attached in Appendix E.
b. Water Quality Objectives
Water quality parameters and the proposed limits applicable to this site have been selected in
accordance with South East Queensland Healthy Waterways Partnership’s Water by Design
A PO Box 26, Carina Q 4152 8|P a g e
E [email protected]
W www.vtce.com.au
Page 10
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
WSUD Technical Design Guidelines for South East Queensland Version 1 (2006) and MUSIC
Modelling Guidelines for South East Queensland Version (2010).
It is proposed that best practise stormwater treatment be used and therefore it is required to
be demonstrated that achieve the following load reduction targets:
POLLUTANT TYPES WATER QUALITY OBJECTIVE (WQO)
Total Suspended Solids (TSS) 80% reduction of average annual load
Total Phosphorus (TP) 60% reduction of average annual load
Total Nitrogen(TN) 45% reduction of average annual load
Litter/gross pollutants 90% reduction of average annual load
Table 5.2: Water Quality Objectives
c. MUSIC Model
The software program Model for Urban Stormwater Improvement Conceptualisation (MUSIC)
Version 6, was used was used to assess pollutant generation and the performance of the
stormwater treatment measures for the proposed development. Selection and testing of
stormwater management options was undertaken in accordance with MUSIC Modelling
Guidelines prepared by Water by Design (2010).
The MUSIC model was set up using four catchment areas:
1. Service The proposed service station, car wash and main entry roads
2. Storage The proposed self-storage units
3. Tourist The proposed tourist park
4. Future The possible future development
The catchments where further split to include roof areas, road areas and ground areas in
accordance with the MUSIC Modelling Guidelines prepared by Water by Design (2010).
A PO Box 26, Carina Q 4152 9|P a g e
E [email protected]
W www.vtce.com.au
Page 11
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
The catchments are shown in the figure below.
Figure 5.1: Music Model Treatment Parameters
The stormwater quality treatment train used in the MUSIC model is shown in the figure below.
Figure 5.2: Music Model Treatment Parameters
A PO Box 26, Carina Q 4152 10 | P a g e
E [email protected]
W www.vtce.com.au
Page 12
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
Music Model Parameters
The split catchment parameters used as the MUSIC Pollutant Export Parameters are shown
below in Table 5.3, and where derived from Table 3.8 of the MUSIC Modelling Guidelines
prepared by Water by Design (2010).
FLOW SURFACE
TSS log10 VALUES TSS log10 VALUES TSS log10 VALUES
TYPE TYPE
Commercial Mean Std. Dev. Mean Std. Dev. Mean Std. Dev.
Roof N/A N/A N/A N/A N/A N/A
Baseflow
Road 0.78 0.39 -0.60 0.50 0.32 0.3
Parameters
Ground 0.78 0.39 -0.60 0.50 0.32 0.3
Roof 1.30 0.38 -0.89 0.34 0.37 0.34
Stormflow
Road 2.43 0.38 -0.30 0.34 0.37 0.34
Parameters
Ground 2.16 0.38 -0.39 0.34 0.37 0.34
Table 5.3: Source Node MUSIC Pollutant Export Parameters
The parameters used as the MUSIC Rainfall-Runoff Parameters are shown below in Table 5.4, and
where derived from Table 3.7 of the MUSIC Modelling Guidelines prepared by Water by Design
(2010).
PARAMETER COMMERCIAL
Rainfall Threshold (mm) 1
Soil Storage Capacity (mm) 18
Initial Storage (% Capacity) 10
Field Capacity (mm) 80
Infiltration Capacity Coefficient - a 243
Infiltration Capacity Exponent – b 0.6
Initial Depth (mm) 50
Daily Recharge Rate (%) 0
Daily Baseflow Rate (%) 31
Daily Deep Seepage Rate (%) 0
Table 5.4: MUSIC Rainfall-Runoff Parameters
A PO Box 26, Carina Q 4152 11 | P a g e
E [email protected]
W www.vtce.com.au
Page 13
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
Music Model Treatment Parameters
The bioretention system is designed to treat the stormwater runoff by filtering the runoff
through densely planted vegetation and percolating the runoff through the filter media. The
proposed design is in accordance with the Water Sensitive Urban Design Technical Design
Guidelines (by Water by Design) and a typical system is shown in the figure below.
Figure 5.3: Water By Design Bioretention System
The bioretention treatment node parameters used in the MUSIC model are shown in the table
below.
Bioretention Bioretention Bioretention Bioretention
PARAMETER Basin Basin Basin Basin
Service Storage Tourist Future
Low Flow By-Pass (m3/s) 0.00 0.00 0.00 0.00
Low Flow By-Pass (m3/s) 100.00 100.00 100.00 100.00
Extended Detention (m) 0.30 0.20 0.20 0.20
Surface Area (m2) 180.0 35.0 65.0 45.0
Filter Media Area (m2) 180.0 35.0 65.0 45.0
Unlined Filter Media
1.00 1.00 1.00 1.00
Perimeter (m)
Sat. Hydraulic
180.00 180.00 180.00 180.00
Conductivity (mm/hr)
Filter Depth (m) 0.60 0.60 0.60 0.60
TN Content of Filter
800 800 800 800
Media (mg/kg)
Orthophosphate Content
55.0 55.0 55.0 55.0
of Filter Media (mg/kg)
Exfiltration Rate (mm/hr) 0.00 0.00 0.00 0.00
A PO Box 26, Carina Q 4152 12 | P a g e
E [email protected]
W www.vtce.com.au
Page 14
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
Is Base Lined? No No No No
Vegetated with Effective
Yes Yes Yes Yes
Nutrient Removal plants
Overflow Weir Width (m) 2.00 2.00 2.00 2.00
Underdrain Present? Yes Yes Yes Yes
Submerged Zone With
No No No No
Carbon Present?
Table 5.7: Water Quality Treatment Bioretention Node
To assist with the removal of the gross pollutants, it is proposed that Enviropod baskets be
installed in all stormwater gullies and inlets. The treatment node for these baskets has been
provided by SPEL.
Refer to Appendix F for the SPEL Enviropod Operations and Maintenance Manual.
The rainwater tank treatment node parameters used in the MUSIC model are shown in the
table below.
Rainwater Rainwater Rainwater Rainwater
PARAMETER Tank Tank Tank Tank
Service Storage Tourist Future
Low Flow By-Pass (m3/s) 0.00 0.00 0.00 0.00
3
Low Flow By-Pass (m /s) 100.00 100.00 100.00 100.00
Number of Tanks 1 1 1 1
Volume Below Overflow Pipe (kL) 3.00 2.00 5.00 4.00
Depth Above Overflow (m) 0.20 0.20 0.20 0.20
Surface Area (m2) 2.0 2.0 2.0 2.0
Initial Volume (kL) 3.00 2.00 5.00 4.00
Overflow Pipe Diameter (mm) 150 150 150 150
Re-use Daily Demand (kL/day) 2.0 0.08 3.6 3.2
Assumed Number of People per day 50 2 20 18
Volume Per Person (L) 40 40 180 180
Total Volume Per Day (L) 2000 80 3600 3240
Table 5.8: Rainwater Tank Input Data
A PO Box 26, Carina Q 4152 13 | P a g e
E [email protected]
W www.vtce.com.au
Page 15
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
d. MUSIC Model Results
Using the MUSIC software. The individual treatment trains for each of the four catchment
areas were designed to comply with the water quality objectives (WQO). It was determined
that the water quality objectives for the whole proposed development where met as shown in
the table below:
Pre- Post- Reduction Complying
POLLUTANT TYPES
Development Development (%) With WQO
Total Suspended Solids (kg/yr) 18300 3250 82.2
Total Phosphorus (kg/yr) 35.8 14.1 60.7
Total Nitrogen (kg/yr) 194 101 47.9
Litter/gross pollutants (kg/yr) 989 0 100.0
Table 5.9: Water Quality Treatment Results
As shown by the above results, the proposed stormwater treatment train adopts best practise
stormwater treatment and will achieve the required Water Quality Objectives.
e. Service Station and Car Wash Treatment
The treatment of the water runoff from the service station and car wash areas has been
excluded from the MUSIC model as these areas will be treated separately.
Service Station and Car Wash Assessment
While the site is not within Brisbane City Council, the acceptable solutions from the BCC
Guidelines for Stormwater from Service Stations & Fuel Dispensing Areas (FDA) will be used as
a reference for stormwater treatment for the service station and car wash areas under the
building canopy and areas outside of the canopy.
Under Canopy Areas:
• All ground surfaces within the FDA shall be constructed of concrete with all gaps
and/or cracks filled so that the impervious barrier and integrity is maintained.
• The FDA shall be delineated by painted line-work on the ground. Other methods of
delineating the FDA may be used e.g. Roll-over bunds, different colour concretes, etc.
• Signs indicating fate of flow such as “flows to containment vessel” shall be provided in
locations around the under-canopy area
• The area shall be graded to a suitable underground containment vessel (i.e.
sump/tank) compatible with petroleum products and other likely chemicals. The tank
shall have no connections to stormwater or sewer. The containment vessel shall be
constructed of precast concrete with a minimum certified design life of 50 years and
be designed in accordance with AS 3600 - “Concrete Structures”. All internal concrete
surfaces that may be exposed to contact with petroleum hydrocarbons shall be coated
with an epoxy resin, to a minimum dry film thickness of 200 microns, applied in
accordance with the supplier’s recommendations. Joints shall be made with epoxy or
rubber ring seals. Epoxy joints shall be Megapoxy P1 or approved equivalent and used
in accordance with supplier’s recommendations. For joints using a rubber ring seal,
A PO Box 26, Carina Q 4152 14 | P a g e
E [email protected]
W www.vtce.com.au
Page 16
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
the rubber type shall be NBR (nitrile) complying with AS 1646.3 (Elastomeric seals for
waterworks purposes – Material requirements for pipe joints seals used in water and
wastewater applications with the exception of natural rubber and polyisoprene
compounds). The ring shall be water tight to 90kPa internal pressure and comply with
the general requirements of AS 1646.1 (Elastomeric seals for waterworks purposes –
General requirements).
• The underground containment vessel shall maintain adequate capacity to contain
both a volume equivalent to at least the volume of the largest tanker compartment
likely to be delivering fuel to the site plus a nominal allowance for windblown rain.
• The roof or canopy shall overhang by a horizontal distance of ¼ of the roof height out
from the vertical above the boundary of the demarcated FDA.
• Preference is for stormwater from roofed areas to be collected in tanks for non-
potable use (e.g. toilet flushing or garden watering). Alternatively, it may be diverted
directly to on-site stormwater infrastructure.
• Bulk fuel transfers may be carried out under the canopy area within a defined Tanker
Delivery Standing Area graded and drained to the underground containment
vessel.
Areas Outside of Canopy:
• All ground surfaces not under canopy shall be constructed of concrete or equivalent
with all gaps and/or cracks filled so that the impervious barrier and integrity is
maintained.
• Drainage separation options may include grading, bunding, kerbing and/or
channelling.
• Bulk fuel transfers shall be carried out in a defined Tanker Delivery Standing Area. This
area shall normally be drained to the uncovered area stormwater treatment system.
However, during fuel delivery operations, automatic diversion valves shall be used to
divert such drainage to the under-canopy containment vessel. The Tanker Delivery
Standing Area in uncovered locations shall be sized so that the drainage area has a
radius of at least 3 meters and a storage volume equivalent to that of the largest
tanker storage compartment that is expected on site at any given time
• Signs indicating fate of flow such as “flows to creek” shall be provided in
locations around the uncovered area.
Service Station Treatment
The fuel dispensing areas shall be graded to a suitable underground containment and
treatment vessel (i.e. sump/tank) compatible with petroleum products and other likely
chemicals. It is proposed that a SPEL Puraceptor containment system be installed to capture
and retain flows from the fuel dispensing areas.
The SPEL Puraceptor (model P.040.C1.2C) is a 6 minute full retention tank that will hold and
treat all the stormwater runoff from the associated forecourt area catchment area of 538m2.
Based on a rainfall duration of 5 minutes and a rainfall intensity of 245 mm/hr for 20 ARI the
associated runoff is approximately 37l/s. The proposed SPEL Puraceptor P.040.C1.2C can treat
up to 40l/s, therefore it is considered to be suitable for this application.
A PO Box 26, Carina Q 4152 15 | P a g e
E [email protected]
W www.vtce.com.au
Page 17
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
The SPEL Puraceptor P.040.C1.2C has a spill containment capacity of 9000l which is sufficient
to hold the contents of a fuel tanker in case of an emergency spill.
Refer to Appendix F for the SPEL Puraceptor Operations and Maintenance Manual.
Car Wash Treatment
It is anticipated that the water supply for the proposed car wash will be obtained from a
combination of council water, captured roofwater and water reuse. The car wash treatment
and water reuse for this proposed development will be by others during the detailed design
phase of the project and will be subject to plumbing approval.
f. Stormwater Quantity Management
Noosa Regional Council Policy requires that a development ensure Non Worsening of
stormwater flows up to and including Q100 stormwater events. The proposed development
includes detention basin storage in the South East corner of the site. With this detention
basin, it is considered that the proposed development will not cause any worsening of flows
from the site.
The new proposed multi-use development will have a larger impervious area than the existing
undeveloped site and will require a stormwater detention system to mitigate the effects of
the additional runoff. Detailed calculations of the detention required are included in Appendix
G of this report and are summarised in the table below:
Runoff Coefficient (C10) - Undeveloped: 0.65 tc = 6 min.
Runoff Coefficient (C10) - Developed: 0.85 tc = 6 min.
PARAMETERS
ARI 2yr 5yr 10yr 20yr 50yr 100yr
Rainfall Intensity mm/hr 150.0 184.0 204.0 232.0 268.0 296.0
Frequency Factor fy= 0.85 0.95 1.00 1.05 1.15 1.20
Undeveloped C Cu= 0.60 0.67 0.70 0.74 0.81 0.84
Developed C Cd= 0.70 0.78 0.82 0.86 0.94 0.98
FLOWS
Undeveloped Flow Qu= C*I*A l/s 1248 1711 1997 2385 3018 3478
Developed Flow Qd=Qi= C*I*A l/s 1462 2005 2340 2794 3535 4074
Difference l/s 214 293 342 409 517 596
Outlet Flow Qo = l/s 1248 1711 1997 2385 3018 3478
Table 5.10: Quantity Summary
A PO Box 26, Carina Q 4152 16 | P a g e
E [email protected]
W www.vtce.com.au
Page 18
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
Based on the calculated peak flows, the detention volume required for proposed multi-use
development is shown in the table below.
INITIAL VOLUME
Reduction
r= (Qi-Qo)/Qi
ratio 0.146 0.146 0.146 0.146 0.146 0.146
Inflow
Vi= 4tc*Qi/3 l/s
Volume 702 962 1123 1341 1697 1956
3
Culp Vs=(r(1+2r)/3)*Vi m 44 61 71 85 107 123
3
Volume to Boyd Vs=r*V= m 103 141 164 196 248 286
Retain Carroll Vs=(r(3+5r)/8)*Vi m 3
48 66 77 92 116 133
3
Basha Vs=(r(2+r)/3)*Vi m 73 101 118 140 178 205
3
Average Volume to Retain = m 67 92 107 128 162 187
Table 5.11: Detention Summary
Based on these calculations it was determined that a detention storage volume of 187m3 is
required to ensure that the developed flow is equal to or less than the undeveloped flow.
It is proposed that all runoff from the impervious areas are to be drained to the detention
basin. The detention basin will be owned and maintained by the property owner.
g. Maintenance
Construction Phase Management Plan
Potential construction phase impacts include the following:
• Sedimentation and erosion
• Management of contaminated soils and materials on the site Construction Material (such
as cement)
General
The objective of the Construction Phase Management Plan is to comply with the requirements
of the Queensland Environmental Protection Act 1994 and Environmental Protection (Water)
Policy 2009 so that the environmental values of effected receiving waters are maintained or
enhanced. In essence the purpose of the Plan is to prevent polluted stormwater being
discharged to the local waterways.
Performance Indicators
The management is not being effective when any of the following occur during the
construction phase of the project.
• The required water quality objectives are not achieved,
• Contaminated water is released off site.
A PO Box 26, Carina Q 4152 17 | P a g e
E [email protected]
W www.vtce.com.au
Page 19
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
Construction Phase Management of Sedimentation and Erosion
Existing vegetation from site will be removed in stages as required to reduce the likelihood of
surface erosion. A sediment and siltation fence will be erected around the property boundary
to ensure that sediment is not washed off site and onto adjacent properties or roads. Entry
and exit from the site will be restricted to a single stabilised location to minimise the rise of
onsite transport of silt sediment or mud. It is anticipated that a layer of crushed rock will
provide the necessary stabilisation of the access route. If required a specific bunded wash
down area will be provided for the cleaning of plant before leaving the site and all wash down
waste water will be collected. In the event that debris or sediment leaves the site it will be
cleaned.
Management of Contaminated Soils Materials
There are no contaminated soils materials fill on the site. The site is not listed on the public
contaminated site’s register.
Management of Imported Materials
Any material imported to the site including construction materials will be stockpiled in a
location where it cannot contaminate the stormwater system or stormwater runoff.
Complaint Response
The contractor will erect signage at the entrance to the works with contact information,
including afterhours contact numbers. The contractor will properly deal with all complaints.
Monitoring and Reporting
All sediment and erosion control devices will be checked daily and after rainfall events by the
construction site supervisor. Defective or full devices will be cleaned and repaired as
required. Regular inspections and maintenance of the storm water system will be carried out
by the property owner. The civil components (structural and erosion) are to be assessed by a
suitably qualified engineer as required.
Lifecycle cost assessment
There will be no abnormal capital or recurrent costs for the proposed stormwater strategy.
h. Flood Zoning
The proposed site is not in a recognised flood zone according to the Noosa Regional Council
River Flood Information Map 10-B50 dated September 2012. See Figure 5.4 below for Flood
map. The map shows that there is no flood zone in close proximity to the proposed site,
therefore flooding issues do not apply to this site.
A PO Box 26, Carina Q 4152 18 | P a g e
E [email protected]
W www.vtce.com.au
Page 20
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
Figure 5.4: Noosa Regional Council River Flood Information Map 10-B50 - September 2012
The proposed site is also shown not to flood on the Cooroy & Lake Macdonald Natural Hazard:
Landslide & Flooding Overlay (Map OM3.3).
A PO Box 26, Carina Q 4152 19 | P a g e
E [email protected]
W www.vtce.com.au
Page 21
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
6. Sewer Reticulation
The proposed site is located within the urban footprint of the Cooroy Sewer treatment Plant.
Figure 6.1: Noosa Regional Council Sewer Trunk Infrastructure Maps 4.2 - PFTI - Sewerage
The proposed site is currently not services by a council sewer property connection as the
closest sewer is located in Ferrells Road with an invert level of IL116.96, which is higher than
the majority of the site.
A new private sewer pump station will be required to service the proposed new multi-use
development. This sewer pump station will be located to the East of the site and just to the
South of the new proposed road entrance from Myall Street. A new internal sewer
reticulation main will run along the verge of the proposed internal road through the centre of
the site. All the internal house drainage from the proposed buildings will connect into this
sewer main and run to the proposed pump station. This will then be pumped to the existing
council sewer infrastructure via an existing man hole in Ferrells Road.
The following table indicates the preliminary sewer pump station design and predicted flows.
These flows and the pump station design are to be confirmed during detailed design.
A PO Box 26, Carina Q 4152 20 | P a g e
E [email protected]
W www.vtce.com.au
Page 22
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
DESCRIPTION Design Parameter Notes
Developable Area 5.064ha
Service Station = 1460m2 = 15EP 1.00 EP/100m2 GFA
Self-Storage = 100m2 = 1EP 1.00 EP/100m2 GFA (Office Only)
Tourist Park = 37du = 89EP 2.40 EP/du (Units)
EP
Tourist Park = 320m2 = 4EP 1.00 EP/100m2 GFA (Office)
Future = 5800m2 = 58EP 100 EP/ha
TOTAL = 167EP
= 200L/EP/day
ADWF = 200 x 167 Noosa PIP DSS Table 3.2
= 33400L/day
= 5 x ADWF SEQ WS & S D&C Code - Design
PWWF = 5 x 33400
Criteria - Table 10
= 167000L/day
C2 x ADWF
= (4.7 x (EP)-0.105) x ADWF SEQ WS & S D&C Code - Design
PDWF
= (4.7 x (167)-0.105) x 33400 Criteria - Table 10
= 91720L/day
Table 6.1: Preliminary Sewer Pump Station Design
Abbreviations:
ADWF Average Dry Weather Flow OPS Operating Storage
DSS Desired Standard of Service PIP Priority Infrastructure Plan
du Dwelling Unit PS Pump Station
ET Equivalent Tenements PWWF Peak Wet Weather Flow
EP Equivalent Populations PDWF Peak Dry Weather Flow
GFA Gross Floor Area Q Pump Rate
N Number of Starts per Hour
After discussions with Noosa Council Engineers, vT Consulting Engineers were advised that as
the sewer and water supply are to be taken over by Unitywater as of 1st July 2014, the
proposed sewer design should meet Unitywater standards and requirements. Unitywater
advised that the water supply and sewer demand factors used in the table above are to be
taken from the Maroochy Plan (2000) Table 2 (a) which Unitywater has advised is suitable for
the design of the pump station.
For more details of the sewer reticulation refer to the engineering plans in Appendix B.
Internal house drainage design for this proposed development will be by others.
A PO Box 26, Carina Q 4152 21 | P a g e
E [email protected]
W www.vtce.com.au
Page 23
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
7. Water Reticulation
A new domestic water supply is proposed to service the new proposed multi-use
development. A new property connection will be provided to the site from Myall Street.
Associated water connections will be installed on Myall Street. Proposed fire hydrants are
located along the central internal road to service the new proposed buildings and Tourist Park.
For more details refer to the engineering plans in Appendix B.
Roof water harvesting tanks are proposed for this development as part of the stormwater
quality treatment train and to reduce the water demand on the reticulated town water supply
system.
The collected water is intended to be used for non-potable uses such as toilet flushing and
landscape irrigation. In the event that the roof water harvesting tank is empty after long
periods of drought, the reticulated town water supply system will be used. The reticulated
town water supply system will be protected from potential backflow with the use of a
backflow prevention device that complies with AS/NZS3500.
To reduce the water demand on the roof water harvesting tank and the reticulated town
water supply system it is intended that all fixtures will be water efficient appliances.
The Internal water supply design for this proposed development will be by others.
8. Electrical and Telecommunication
The electrical supply and communications supply for this proposed development will be by
others.
9. Acoustic Assessment
The acoustic requirements and design for this proposed development will be by others.
A PO Box 26, Carina Q 4152 22 | P a g e
E [email protected]
W www.vtce.com.au
Page 24
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
10.Development Codes
Based on all the findings outlined in this report, vT Consulting Engineers believes that there
are no significant engineering issues in relation to this development.
The following applicable Local and State Codes have been completed to address the proposed
development and are included in Appendix H:
• Earthworks Code
• Water Supply and Sewerage Reticulation
• SDAP Code - Stormwater and Drainage Impacts
• Transport Roads and Drainage Code (in conjunction with Traffic Engineer)
• Driveway and Parking Code (in conjunction with Traffic Engineer)
11. Conclusions
vT Consulting Engineers has undertaken a review of civil engineering services required for the
proposed development located at Corner Myall Street & Ferrells Road, Cooroy QLD 4563.
Based on all the findings outlined in this report, vT Consulting Engineers believes that there are
no significant engineering issues in relation to this development.
A PO Box 26, Carina Q 4152 23 | P a g e
E [email protected]
W www.vtce.com.au
Page 25
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
Appendix A - Survey Plan
A PO Box 26, Carina Q 4152 24 | P a g e
E [email protected]
W www.vtce.com.au
Page 26
APPROVED APPROVED
COMPANY COMPANY LEGEND
ISO9001 ISO14001
Quality Environmental
Management Systems Management Systems
by Survey by Records
Certification
Services
Certification
Services O/H ELECTRICITY
U/G ELECTRICITY
O/H TELSTRA
U/G TELSTRA
U/G DRAINAGE
SEWERAGE
WATER
GAS
FENCE
SYMBOLS ABBREVIATIONS
Sewer Manhole MH Manhole
Gully Trap SL Surface Level
Stormwater Manhole IL Invert Level
Fire Hydrant BM Bench Mark
Valve Diameter
Water Meter RCP Reinforced Concrete Pipe
Electricity Box / Pillar GI Galvanised Iron
Electric Light Pole
Power Pole Trunk diameter,
Electricity Manhole Height,
Electricity Pit Spread (canopy diameter)
Traffic Signal Pit
Traffic Light
Telstra Manhole
Telstra Pit
Tree / Shrub
NOTES
This Plan has been prepared from a combination of field survey
and existing records for the purpose of showing the physical
features of the land to assist in designing future development, and
should not be used for any other purpose.
The title boundaries shown hereon were not verified or marked at
the time of survey, but were determined by existing title
dimensions and occupation (where available), not by field
measurement. As such, these dimensions could be out of date
and incorrect by modern standards. This plan should not be used
for building to boundary, or to prescribed set-backs, without further
boundary survey.
Services shown hereon were located where possible by field
survey. If not able to be so located, known services have been
shown from the records of the relevant authorities or service
providers where available and have been noted accordingly on
this plan. All services shown from records only will need
verification prior to, or during work on site.
Prior to any demolition, excavation or construction on site, the
relevant authority should be contacted for:
* Verification of all services plotted from records only, and
* Possible location of any services altered since this survey was
completed or any new services installed either on or adjacent to
the site.
Before starting any demolition, excavation or construction on
the site, the relevant person should make an independent and
updated enquiry of "dial before you dig" and any relevant
service providers to ascertain the existence of further
services (if any) and the accurate location of those not able to
have been surveyed at the time of preparing this plan.
* No responsibility can be accepted by Saunders Havill Group Pty
Ltd, for any damage caused to any underground service or any
loss or injury so suffered if enquiry and verification have not been
completed in accordance with this note.
** This note is an integral part of this plan/data. Reproduction of
this plan or any part of it without this note being included in full will
render the information shown on such reproduction invalid and not
suitable for use.
Scale 1:500 - Lengths are in Metres.
5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
No. by Date Description Surveyed: NC
A AJB 25/03/14 Original Issue
Plan of Level Datum: AHD der. Lot Description surveying
Date: 17/03/14 DETAIL PLAN Origin of Levels: PM171964 Lot 4 on SP248479 Scale @A0 1: 500
Drawn: AJB RL of Origin: 117.348
@A2 1: 1000
Issues
Project
Date: 19/03/14 125 MYALL STREET, COOROY Contour Interval: 0.5m
Locality of Cooroy
Parish of Teewantin
Checked: Client VERVE BUILDING DESIGN & CONCEPTS County of March Dwg No. 6520 S 01 DT A
Page 27
ENG
Engineering Report & Stormwater Management Plan
Date: 16/06/2014 Document No.: 14012-ENG-01.Docx
By: AvT Revision No.: B
Appendix B - Proposed Design Drawings
A PO Box 26, Carina Q 4152 25 | P a g e
E [email protected]
W www.vtce.com.au
Page 28
PROJECT:
GENERAL NOTES PROPERTY DESCRIPTION:
1.
2.
PRIOR TO COMMENCEMENT OF WORKS THE CONTRACTOR IS TO IDENTIFY AND BE
SATISFIED OF THE CORRECT LOCATION OF ALL EXISTING SERVICES WHETHER INDICATED
OR NOT ON THE PLANS. ANY DAMAGE TO EXISTING SERVICES IS TO BE RECTIFIED AT THE
CONTRACTOR'S EXPENSE.
ANY WORK ON EXISTING SERVICES THAT REQUIRE RELOCATION BY AUTHORITIES SHALL
PROPOSED MIXED USE DEVELOPMENT SITE ADDRESS: 125 MYALL STREET
COOROY QLD 4563
BE CARRIED OUT BY THE RELEVANT AUTHORITY BUT WITHIN TERMS OF THE CONTRACT PROPERTY DESCRIPTION: LOT 4 on SP248479
AND SHALL BE CO-ORDINATED BY THE CONTRACTOR.
3. PRIOR TO COMMENCEMENT OF WORKS THE CONTRACTOR WILL PROVIDE SCOUR AND
EROSION PROTECTION INCLUDING PROVISION OF SEDIMENT TRAPS AND FENCES TO
MINIMISE DEPOSITION OF MATERIAL ONTO DOWNSTREAM OF THE PROPERTY AS
INDICATED ON THE DRAWINGS.
CORNER MYALL STREET & FERRELLS ROAD COOROY QLD 4563 LOCALITY OF COOROY
PARISH OF TEEWANTIN
COUNTY OF MARCH
4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL OTHER WORKING DRAWINGS PROPERTY DETAILS: SINGLE TITLE
AND SPECIFICATION AND WITH SUCH OTHER WRITTEN INSTRUCTIONS AS MAY BE ISSUED
DURING THE COURSE OF CONSTRUCTION. ALL DISCREPANCIES AND VARIATIONS SHALL TENANT/S: UNKNOWN
BE REFERRED TO THE ENGINEER BEFORE PROCEEDING WITH THE WORK.
5. ALL LEVELS ARE TO BE TO A.H.D LEVEL DATUM P.S.M. SURVEY ORIGIN IS PERMANENT
BENCHMARK NO. PM171964 RL117.348
6. ALL WORK TO CONFORM TO SUNSHINE COAST COUNCIL (SCC) STANDARDS AND
W
LEGEND
T
SPECIFICATIONS UNLESS OTHER WISE SHOWN ON PLANS OR DIRECTED BY THE
SUPERINTENDENT.
7. SETOUT TO ARCHITECTS DETAILS UNLESS NOTED OTHERWISE (UNO). EXISTING PROPERTY BOUNDARY
8. ALL 'WORKS AS CONSTRUCTED' INFORMATION SHALL BE SUPPLIED IN BOTH HARD COPY
EXISTING CONTOUR - MAJOR
T
AND ELECTRONIC DATA FORMAT TO THE REQUIRED AUTHORITIES.
9. DIMENSIONS SHALL NOT BE OBTAINED BY SCALING THE DRAWINGS. EXISTING CONTOUR - MINOR
10. 'U.N.O.' STANDS FOR UNLESS NOTED OTHERWISE.
EXISTING BUILDING
N
W
T
IN CASE OF DOUBT, ASK! ABANDON EXISTING SERVICE
W
W EXISTING ROAD CROWN
WARNING T
T
EXISTING EDGE OF BITUMEN
THE ALIGNMENT & LEVEL OF EXISTING SERVICES SHOWN ON THIS DRAWING HAS BEEN COMPILED W
EXISTING KERB AND CHANNEL
FROM SURVEY DATA & COUNCIL RECORDS & IS INDICATIVE ONLY. PRIOR TO COMMENCING N
EXISTING STORMWATER DRAINAGE
W
N
W
CONSTRUCTION THE CONTRACTOR IS TO CONFIRM THE ALIGNMENT & LEVEL OF ALL SERVICES
T
EXISTING STORMWATER TABLE DRAIN
AFFECTED BY THE PROPOSED WORKS.
EXISTING SEWER
T
EXISTING WATER
EXISTING RETAINING WALL
T W
FH EXISTING FENCE - TYPE 1
N
EXISTING ELECTRICAL
W
T
SW
T
EXISTING ELECTRICAL UNDERGROUND
EXISTING ELECTRICAL OVERHEAD
EXISTING COMMUNICATIONS
T W
PROPERTY BOUNDARY
T
EASEMENT BOUNDARY
W
T
1.00 CONTOUR - MAJOR
W
BUILDING
T W
ROAD CONTROL LINE
N
ROAD CROWN
T
W
T EDGE OF BITUMEN
FH KERB
KERB AND CHANNEL
W
W
FH
CONCRETE FOOTPATH
N
STORMWATER DRAINAGE
SERVICE STATION
T
T
ROOFWATER DRAINAGE
STORMWATER TABLE DRAIN
T
SEWER
W
SEWER RISING MAIN
N
W
WATER
T
T
FH
RETAINING WALL
EARTHWORKS TOP OF BATTER
W
W
FH
EARTHWORKS BOTTOM OF BATTER
SEDIMENT FENCE
N
SEDIMENT CATCH DRAIN - DIRTY
1
SEDIMENT CATCH DRAIN - CLEAN
AD
W
PR
RO
T
W
I VA
E
T
AT
TE FH
EU
S
FH
IV
RO FUTURE
W
PR
AD
2
SW
T
W
FH
SELF STORAGE
W
FH
FH
W
S
FH
TOURIST PARK
S
EU
W
EU
S
EU
EU
SW
EU
OVERALL LAYOUT PLAN
SCALE 1:1000
CLIENT: SCALE: AS SHOWN DRAWN: AvT PROJECT: JOB No.:
PROPOSED MIXED USE DEVELOPMENT
SHEET SIZE: A1 DESIGN: AvT
CNR. MYALL ST & FERRELLS RD COOROY QLD
14012
DATUM: AHD CHECKED: AvT
COPYRIGHT: THIS DOCUMENT IS AND SHALL REMAIN APPROVED: DRAWING TITLE: DRAWING No.: REV.:
0 10 20 30 40 50 THE PROPERTY OF vT CONSULTING ENGINEERS. THIS
PRELIMINARY COVER SHEET
A: PO Box 26, Carina QLD 4152
A
DOCUMENT MAY ONLY BE USED FOR THE PURPOSE
A 23.05.14 ORIGINAL ISSUE AvT AvT E: [email protected]
FOR WHICH IT WAS COMMISSIONED AND IN
ACCORDANCE WITH THE TERMS OF ENGAGEMENT. KHUZAINI SANI P000
SCALE 1:1000
REV. DATE: AMENDMENT: BY: APP: W: vtce.com.au UNAUTHORISED USE OF THIS DOCUMENT IN ANY
RPEQ: 10697 DATE: 23.05.14 AND OVERALL LAYOUT PLAN NOT FOR CONSTRUCTION
Page 29
EROSION AND SEDIMENT CONTROL NOTES SEDIMENT BASIN MAINTENANCE PROGRAM SEDIMENT CONTROL BASIN CALCULATIONS
1. THE EROSION AND SEDIMENT CONTROL WILL COMPLY WITH: 1. WITHIN 24 HOURS OF THE CONCLUSION OF EACH STORM EVENT GYPSUM CALCULATIONS TO I.E.C.A. BEST PRACTICE EROSION & SEDIMENT CONTROL
LEGEND
WILL BE USED FOR SEDIMENT FLOCCULATION. GYPSUM IS TO BE MIXED AS A BOOK 2 APPENDIX B EXISTING PROPERTY BOUNDARY
SLURRY AND APPLIED AT THE FOLLOWING RATE:
- THE INSTITUTE OF ENGINEERS AUSTRALIA'S EROSION AND SEDIMENT CONTROL (A) GYPSUM - 32kg PER 100m3 OF STORED WATER. BASIN TYPE F (WET) EXISTING CONTOUR - MAJOR
ENGINEERING GUIDELINES FOR QUEENSLAND CONSTRUCTION SITES - JUNE 1996. DESIGN VOLUME STORAGE = REFER TO SEDIMENT BASIN DESIGN TABLE EXISTING CONTOUR - MINOR
2. EXISTING GRASSED AREAS CLEAR OF EARTHWORKS TO BE MAINTAINED DURING DESIGN STORM
2. DECANT AFTER FLOCCULATION ONCE WATER QUALITY OBJECTIVE OF NOT
CONSTRUCTION. LESS THAN 50 MILLIGRAMS PER LITRE OF TOTAL SUSPENDED SOLID
AVERAGE RAINFALL INTENSITY FOR EXISTING BUILDING
3. PROVIDE EROSION CONTROL DEVICE 3M (MAXIMUM) DOWNSTREAM OF ALL STORMWATER CONTENT, TURBIDITY < 70NTU AND A PH RANGE OF 6.5 - 8.5 HAVE BEEN 1 in 1 YEAR ARI , 120hr STORM (mm/hr) ABANDON EXISTING SERVICE
DRAINAGE OUTLETS. ACHIEVED. IF A PUMP IS USED, THEN DECANTING MUST CEASE PRIOR TO RUNOFF COEFFICIENT
4. ADDITIONAL CONTROL DEVICES SHALL BE PLACED, WHERE DIRECTED BY THE
EXISTING ROAD CROWN
SETTLED SEDIMENT BEING DRAWN INTO THE INTAKE PIPE. WQO'S TO BE CV = 0.30 (GROUP C - 22.5mm/hr)
SUPERINTENDENT. ALTERNATIVE DESIGNS TO BE APPROVED BY THE SUPERINTENDENT ACHIEVED AND BASIN DEWATERED WITHIN 5 DAYS. EXISTING EDGE OF BITUMEN
PRIOR TO CONSTRUCTION. 3. SEDIMENT EXTRACTED FROM BASIN TO BE REMOVED WITH BOBCAT, SETTLING VOLUME EXISTING KERB AND CHANNEL
5. WOVEN WIRE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES OR STAPLES. BACKHOE (OR SIMILAR) AND SUITABLY DISPOSED OF IN SEDIMENT DUMPS, R = K1 x I(1y.120hr) + K2
6. FILTER CLOTH TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH TIES SPACED EXISTING STORMWATER DRAINAGE
OR DRIED AND REMOVED FROM SITE. R = 12.9 x 1.34 + 9.9
EVERY 600MM AT TOP OF MID SECTION. 4. INSTALL 2 STD. FLOOD INDICATOR POST, ONE AT EACH END OF BASIN. R = 27.186 (y%, 5 DAY) EXISTING STORMWATER TABLE DRAIN
7. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE SEDIMENT TO BE CLEANED OUT ONCE IT HAS REACHED A HEIGHT OF 0.4m EXISTING SEWER
OVERLAPPED BY 150MM AND FOLDED. ON EITHER INDICATOR POST. Vs = 10 x R x Cv x A
POSTS: STAR PICKETS OR 50MM X 50MM HARDWOOD 5. RECORDS OF SEDIMENT BASIN WATER QUALITY RESULTS TO BE Vs = 10 x 27.186 x 0.42 x 5.04 EXISTING WATER
FENCE: WOVEN WIRE 14 GAUGE. 150MM MAXIMUM MESH OPENING. EXISTING RETAINING WALL
W
MAINTAINED AND COPY KEPT ONSITE. RECORDS TO BE MADE AVAILABLE TO Vs = 576m3
T
FILTER CLOTH: FILTER AS SPECIFIED (TERRAM 1000, POLYFELT TS 500 BIDIM U24 OR COUNCIL OFFICERS UPON REQUEST.
EQUIVALENT). SETTLING DEPTH EXISTING FENCE - TYPE 1
PREFABRICATED UNIT: GEOFAB, ENVIROFENCE, OR APPROVED EQUIVALENT. = 1.0m EXISTING ELECTRICAL
EXISTING ELECTRICAL UNDERGROUND
T
8. CONTRACTOR TO PROVIDE FAUNA SPOTTER TO LOCATE AND REMOVE WILDLIFE PRIOR TO BASIN DIAMENSIONS
START OF CONSTRUCTION. MIDDLE AREA (SETTLING ZONE) EXISTING ELECTRICAL OVERHEAD
576/1.0 = 576m2 EXISTING COMMUNICATIONS
EROSION AND SEDIMENT CONTROL STAGING NOTES
N
W
T
LENGTH = 42.0m PROPERTY BOUNDARY
W
1. CLEARING/EARTHWORKS W WIDTH = 14.0m
INSTALL DEVICES DOWNSTREAM OF ALL DISTURBED AREAS PRIOR TO START OF WORKS. EASEMENT BOUNDARY
T SIDE SLOPES = 1 in 3
T
2. TRENCHING/SERVICES 1.00 CONTOUR - MAJOR
MAINTAIN DEVICES DOWNSTREAM OF ALL TRENCHES. TRENCH MATERIAL TO BE REMOVED SURFACE AREA (BASE SETTLING ZONE)
W MIDDLE ZONE LESS 1.8m FOR SLOPE BUILDING
OR REPLACED IN TRENCH AS SOON AS POSSIBLE. N
DEPTH 0.6m ROAD CONTROL LINE
W
3. ROADWORKS CD
N
W
T
USE HAYBALES AND SAND BAGS ON GULLY GRATES PRIOR TO SURFACING. CONTRACTOR TO ENSURE ALL LENGTH = 40.2m ROAD CROWN
4. FINAL ROADS ARE KEEP CLEAN AT WIDTH = 12.2m EDGE OF BITUMEN
T
LEAVE ALL DEVICES IN PLACE UNTIL GRASS COVER IS SUFFICIENT TO PREVENT SIDE SLOPES = 1 in 3
ALL TIMES. TYPICAL KERB
SCOURING.
SEDIMENT STORAGE KERB AND CHANNEL
50% OF Vs
T W
FH CONCRETE FOOTPATH
VOLUME (MIN. REQUIRED) = 288m3
N
STORMWATER DRAINAGE
W
CLEAN WATER
T
VOLUME (ACTUAL)= 294m3
SW
T
SEDIMENT CATCH DRAIN CD DEPTH = 0.60m ROOFWATER DRAINAGE
STORMWATER TABLE DRAIN
SEDIMENT FENCE SEWER
T W
SEWER RISING MAIN
CHECK DAM (CD)
T
WATER
W
T
RETAINING WALL
W
EARTHWORKS TOP OF BATTER
T W
N
CATCH DRAIN - TEMPORARY CULVERT EARTHWORKS BOTTOM OF BATTER
SEDIMENT FENCE
T
CROSSING WITH 150mm THICK LAYER OF
50-75mm AGGREGATE TO FORM TEMPORARY SEDIMENT CATCH DRAIN - DIRTY
ACCESS SURFACE
W
T
FH SEDIMENT CATCH DRAIN - CLEAN
EXISTING OPEN CHANNEL - TEMPORARY
W
CD
CULVERT CROSSING WITH 150mm THICK
W
FH
N
LAYER OF 50-75mm AGGREGATE TO FORM
TEMPORARY ACCESS SURFACE
SERVICE STATION
T
T
GATE 1
T
CONSTRUCTION ENTRY/ EXIT
W
SEDIMENT FENCE INLET PROTECT AROUND
N
W
HEADWALL WITH 1m WIDE SEDIMENT WEIR
T
T
FH
POSSIBLE STOCKPILE LOCATION
W
W
FH
CD SEDIMENT FENCE
N
1m WIDE SEDIMENT WEIR
1
DIRTY WATER SEDIMENT
AD
CATCH DRAIN
W
PR
RO
T
W
I VA
E
T
AT
CD
TE FH
EU
S
FH
IV
RO FUTURE
W
PR
AD
2
SW
CONTRACTOR TO ENSURE ALL
T
ROADS ARE KEEP CLEAN AT
W
ALL TIMES. TYPICAL
FH
SELF STORAGE
W
FH
SEDIMENT BASIN
WEIR
SEDIMENT BASIN
FH
W
S
ROCK SCOUR PROTECTION AT
FH CATCH DRAIN OUTLET.
TYPICAL
TOURIST PARK
S
EU
W
SEDIMENT
SEDIMENT EU FENCE
FENCE DIRTY WATER SEDIMENT
S
CLEAN WATER CATCH DRAIN
SEDIMENT CATCH DRAIN
EU
EU
SW
EU
PRELIMINARY EROSION & SEDIMENT CONTROL AND EARTHWORKS LAYOUT PLAN
SCALE 1:1000
CLIENT: SCALE: AS SHOWN DRAWN: AvT PROJECT: JOB No.:
PROPOSED MIXED USE DEVELOPMENT
SHEET SIZE: A1 DESIGN: AvT
CNR. MYALL ST & FERRELLS RD COOROY QLD
14012
DATUM: AHD CHECKED: AvT
COPYRIGHT: THIS DOCUMENT IS AND SHALL REMAIN APPROVED: DRAWING TITLE: DRAWING No.: REV.:
0 10 20 30 40 50 THE PROPERTY OF vT CONSULTING ENGINEERS. THIS
PRELIMINARY EROSION & SEDIMENT
A: PO Box 26, Carina QLD 4152
A
DOCUMENT MAY ONLY BE USED FOR THE PURPOSE
SCALE 1:1000
A 23.05.14 ORIGINAL ISSUE AvT AvT E: [email protected]
W: vtce.com.au
FOR WHICH IT WAS COMMISSIONED AND IN
ACCORDANCE WITH THE TERMS OF ENGAGEMENT.
UNAUTHORISED USE OF THIS DOCUMENT IN ANY
KHUZAINI SANI
CONTROL AND EARTHWORKS LAYOUT PLAN
P001
REV. DATE: AMENDMENT: BY: APP: RPEQ: 10697 DATE: 23.05.14 NOT FOR CONSTRUCTION
Page 30
5.0
CONSTRUCTION SITE mM
IN.
IN.
CATTLE GRID 3.0m
mM
NOMINAL
100mm
3.0 NOMINAL WIDTH, SET
300mm ABOVE GROUND
SANDBAGS OVERLAP ONTO
FIX TO TOP OF STAKE WITH
KERB
SHADECLOTH FASTENER 10.
0 mM 4.0m MIN.
OR TIE TO STEEL PICKET IN.
ORANGE SAFETY GEOTEXTILE FABRIC BIDUM
0.60 MAX.
GEOTEXTILE FABRIC AND
300mm
MESH AROUND TRAP U34 OR SIMILAR
1.5m
SL42 MESH
L
MIN
OVERLAND FLOW NE RUNOFF
AN
CH
.
R B&
ED KE Y
CT WA
IRE P AD
E D T TRA RO
0.50 MAX.
B EW
TO EN RN
SEDIMENT TRAP. MONITOR FF EDIM 75mm CRUSHED O
NO G, 600mm NOMINAL GAP BETWEEN
RU O A S ROCK IN BYPASS FLOW TO
DAILY OR AFTER HEAVY 50 x 50 HWD STAKE T NT IST BAGS ACTS AS SPILLWAY
RAINFALL AND CLEAN AS OR STEEL PICKET ME EX INLET
L IGN
REQUIRED 1200 MIN LONG YA THREE LAYERS OF
E RT
0.60 SQUARE OP SANDBAGS WITH ENDS
PR
OVERLAPPED
TYPICAL SEDIMENT TRAP SECTION TYPICAL CONSTRUCTION ENTRY/ EXIT TYPICAL ON GRADE KERB INLET SEDIMENT TRAP
NOT TO SCALE NOT TO SCALE NOT TO SCALE
SH H
ME ES
TH M
. WI HOUT
AX IT
mM .W
3.0 MAX
UNDISTURBED AREA m
2.0
SPILL THROUGH
SL42 MESH TO AS1304
WEIR
CUT OFF DRAIN
2.00 FORMED TOP WIDTH
0.15 MIN.
OV
E RL
OVERLAND FLOW AN 50 x 50 HWD STAKE OR STEEL
DF SPLASH PAD IF
LO PICKET 1200 MIN LONG
W REQUIRED
0.20
0.20
DRIVEN 600mm INTO GROUND FLOW
0.5
GEOTEXTILE FABRIC AND SL42 0T
YP.
0.20
MESH. LAB FABRIC 100mm 50 x 50 HWD STAKE OR STEEL
0.15
DISTURBED AREA PICKET 1200 MIN LONG
CUT FILL
DRIVEN 600mm INTO
GROUND. TYPICAL 50 x 50 HWD STAKE BACKFILL 50 x 50 HWD STAKE
BACKFILL SPILL THROUGH OR STEEL PICKET OR STEEL PICKET
WEIR SEDIMENT FENCE TO DETAIL
1200 MIN LONG 1200 MIN LONG
TYPICAL SEDIMENT CATCH DRAIN TYPICAL SEDIMENT FENCE ELEVATION TYPICAL SEDIMENT TRAP PLAN TYPICAL SEDIMENT WEIR ELEVATION TYPICAL SEDIMENT TRAP WEIR SECTION
NOT TO SCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE
5.00
2.00
GROUND LEVEL
TOP OF SETTLING ZONE
GRAVEL FILTER, REFER GRADING B, GEOTEXTILE, BIDUM
TABLE 9 OF TMR SPECIFICATION A34 OR SIMILAR 1 IN 3 BATTER 1 IN 3 BATTER
MRS11.05, EXCULDE MATERIAL FINER
THEN AS SIEVE 2.36MM. FLOW FLOW
TYPICAL SEDIMENT BASIN SPILLWAY SECTION
NOT TO SCALE
0.15m FREEBOARD IN VIRGIN CUT
0.30m FREEBOARD IN FILL
'U' SHAPED CHECK DAM
A PLAN
LEVEL
REMOVE ACCUMULATED SEDIMENT SETTLING ZONE
1:2 'A' TO BE HIGHER THAN 'B' TO
1:2
200mm
SEDIMENT BEFORE DEPTH IS H/2. 1.20m HIGH POOL SAFETY FLOOR LEVEL 1.20m HIGH POOL SAFETY
NOM.
PREVENT SEDIMENT BYPASS FENCE TYPE FENCE TYPE
LEVEL A A
GRAVEL FILTER, REFER GRADING B,
A 1:2 B
1:2
TABLE 9 OF TMR SPECIFICATION
MRS11.05, EXCULDE MATERIAL FINER
1.0m
THEN AS SIEVE 2.36MM. 1 1
1000mm MAX.
500mm NOM.
3 3
ROCK APRON IF GEOTEXTILE, BIDUM GEOTEXTILE, BIDUM
ORDERED BY THE A34 OR SIMILAR A34 OR SIMILAR
0.6m
SUPERINTENDENT SEDIMENT STORAGE ZONE
ELEVATION SECTION A-A
CHECK DAMS FLOW CONTROL TYPICAL SEDIMENT BASIN CROSS SECTION
NOT TO SCALE NOT TO SCALE
CLIENT: SCALE: AS SHOWN DRAWN: AvT PROJECT: JOB No.:
PROPOSED MIXED USE DEVELOPMENT
SHEET SIZE: A1 DESIGN: AvT
CNR. MYALL ST & FERRELLS RD COOROY QLD
14012
DATUM: AHD CHECKED: AvT
COPYRIGHT: THIS DOCUMENT IS AND SHALL REMAIN APPROVED: DRAWING TITLE: DRAWING No.: REV.:
0 0.2 0.4 0.6 0.8 1.0 THE PROPERTY OF vT CONSULTING ENGINEERS. THIS
PRELIMINARY EROSION & SEDIMENT
A: PO Box 26, Carina QLD 4152
A
DOCUMENT MAY ONLY BE USED FOR THE PURPOSE
SCALE 1:20
A 23.05.14 ORIGINAL ISSUE AvT AvT E: [email protected]
W: vtce.com.au
FOR WHICH IT WAS COMMISSIONED AND IN
ACCORDANCE WITH THE TERMS OF ENGAGEMENT.
UNAUTHORISED USE OF THIS DOCUMENT IN ANY
KHUZAINI SANI
CONTROL AND EARTHWORKS DETAILS
P002
REV. DATE: AMENDMENT: BY: APP: RPEQ: 10697 DATE: 23.05.14 NOT FOR CONSTRUCTION
The text continues on page 31.