Skip to the record
The gold standard in government transparency.

Original source · versioned page text

MCU14/0056 - Attachment G - Engineering Report & Stormwater Management Plan

of 103

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                               Corner Myall Street & Ferrells Road Cooroy, QLD 4563
                                                          Water Supply & Sewerage Reticulation Code



Water Supply & Sewerage Reticulation Code
Specific Outcomes                                     Acceptable Solutions/Probable Solutions                         Compliance
                                                      S12.4 The easement is centred over the centreline of the        Not applicable, as no buildings are
                                                      infrastructure.                                                 proposed adjacent to existing
                                                                                                                      infrastructure.
O13 Alignment of sewerage reticulation                S13.1 Infrastructure is constructed on the preferred            The proposed development works will
infrastructure is to allow for easy access for the    alignments in accordance with PSP6 –Engineering Design          comply with this requirement.
ongoing maintenance by Council.                       Standards — Water and Sewerage.
O14 Any alterations or repairs to infrastructure as   S14.1 Any alterations or repair to infrastructure as a result   The proposed development works will
a result of the development are made at no cost       of the development are completed at the developer’s             comply with this requirement.
to Council.                                           expense.
Log in to download the original file

MCU14_0056 - Attachment G - Engineering Report & Stormwater Management Plan.pdf · 9.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.