Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

MCU14/0056 - Attachment G - Engineering Report & Stormwater Management Plan

of 103

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                             ENG
                                                 Engineering Report & Stormwater Management Plan
                                         Date:          16/06/2014     Document No.:     14012-ENG-01.Docx

                                          By:              AvT          Revision No.:              B


 6. Sewer Reticulation

The proposed site is located within the urban footprint of the Cooroy Sewer treatment Plant.




      Figure 6.1: Noosa Regional Council Sewer Trunk Infrastructure Maps 4.2 - PFTI - Sewerage

The proposed site is currently not services by a council sewer property connection as the
closest sewer is located in Ferrells Road with an invert level of IL116.96, which is higher than
the majority of the site.

A new private sewer pump station will be required to service the proposed new multi-use
development. This sewer pump station will be located to the East of the site and just to the
South of the new proposed road entrance from Myall Street. A new internal sewer
reticulation main will run along the verge of the proposed internal road through the centre of
the site. All the internal house drainage from the proposed buildings will connect into this
sewer main and run to the proposed pump station. This will then be pumped to the existing
council sewer infrastructure via an existing man hole in Ferrells Road.

The following table indicates the preliminary sewer pump station design and predicted flows.
These flows and the pump station design are to be confirmed during detailed design.




A PO Box 26, Carina Q 4152                                                                  20 | P a g e
E [email protected]
W www.vtce.com.au
Log in to download the original file

MCU14_0056 - Attachment G - Engineering Report & Stormwater Management Plan.pdf · 9.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.