MCU14/0056 - Attachment G - Engineering Report & Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn3: Erosion and Sediment Control Methods Element Solution Minimise disturbance when excavating Retain as much grassed area as possible on the site. These areas not only improve the appearance of the site they also filter much of the sediment from stormwater run-off before it reaches the drainage system. Catch drains and perimeter banks Allow for diversion of up slope stormwater around the work site and other disturbed surfaces. Install a sediment barrier Install sediment barriers down slope of the building site to filter coarse sediment before it can wash into gutters, drains and watercourses. e Purpose designed geotextile sediment fabric (i.e. not shadecloth) attached to posts with the geotextile buried in an upstream trench; or e = Place turf of a minimum 600mm width along kerb line; or e Straw bales, staked in a 100mm (min) deep trench. Single gravelled entry-exit Restrict vehicle access to one entry-exit point. e Gravelling the access point will allow all weather access, will reduce the amount of soil carried off the site by vehicles, and will provide a permanent base for the driveway. Early stormwater drainage connection Connect a temporary or permanent downpipe/s to the stormwater system before laying the roof or slow and spread the flow from downpipe/s to avoid localised erosion. Downpipe/s may be temporarily removed during wall construction. All stormwater must discharge in a manner that does not cause soil erosion. Concrete waste and washing Waste concrete and household paint must not be allowed to wash into the gutters or the street. Sand and soil stockpiles Stockpiles must be placed wholly on the construction site and behind a sediment barrier. $2.3 The Noosa Plan Including amendments to 16 September 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.