MCU14/0056 - Attachment G - Engineering Report & Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Spillway crest
Maximum water level 300mm (min) Spillway crest
Maximum water level 300mm (min)
Debris screen
Settling zone 600mm
(min) 300mm 600mm
Riser pipe outlet Settling zone
(min) (min)
Sediment storage zone
Sediment storage zone
Anti-flotation weight
Anti-seep collars
(a) Type C (dry) basin with riser pipe outlet system (b) Typical profile of Type F/D (wet) basin
Inflow Outlet Outlet
Inflow
Ba
L1 L1 L2 Emergency
AS
ffle
(a) spillway
L2 Maximum water level
Baffle
(b)
AS
In case (b) it is important
Inflow
Inflow to place the baffle so that
L1 = L2 Length (L)
(c) AS Inflow
L1
Width (W)
L3
L2 AS
Energy
Outlet Inflow dissipater
L4 Bottom of settling zone Fill embankment
Cases (a), (b), (c): We = AS/(L1 + L2) (d) L1
L2
Cases (d): We = AS/(L1 + L2 + L3 + L4)
(d) Type C (dry) basin with riser pipe outlet system
Where: We = Effective width
Catchments & Creeks Pty Ltd
AS = Pond surface area (plan view)
Inflow
(after USDA, 1975)
Drawn: Date:
(c) Typical arrangement of internal flow control baffles GMW Feb-10 Sediment Basins SB-01
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.