MCU14/0056 - Attachment G - Engineering Report & Stormwater Management Plan

of 103

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                              MATERIALS                                  NECESSARY TO ALLOW ACCESS FOR               18. COVER PIPE/S WITH SUFFICIENT ROCK       MAINTENANCE
                                                                         CONSTRUCTION. CLEAR THE REMAINDER OF        (MINIMUM 300mm LAYER) TO SATISFY
                              CULVERTS: ANY COMMERCIAL CONDUIT THAT
                                                                         THE APPROACH RAMPS ONLY WHEN                MANUFACTURER’S LOADING REQUIREMENTS         1. TEMPORARY WATERCOURSE CROSSINGS
                              IS SUITABLE FOR THE REQUIRED TRAFFIC
                                                                         ADEQUATE DRAINAGE AND SEDIMENT              TO AVOID DAMAGE TO THE PIPE/S RESULTING     SHOULD BE INSPECTED WEEKLY AND AFTER
                              LOADING.
                                                                         CONTROLS ARE IN PLACE.                      FROM THE EXPECTED TRAFFIC LOAD. SLOPE       ANY SIGNIFICANT CHANGE IN STREAM FLOW.
                              ROCK: MINIMUM 150mm NOMINAL ROCK SIZE.                                                 OF ROCK FACE UPSTREAM AND DOWNSTREAM
                                                                         7. IF FLOW DIVERSION SYSTEMS CANNOT BE      OF THE CULVERT NO STEEPER THAN 3:1 (H:V).   2. DEBRIS TRAPPED ON OR UPSTREAM OF THE
                              AGGREGATE: 50–75mm CLEAN AGGREGATE.
                                                                         INSTALLED, THEN CONDUCT BANK                                                            CROSSING SHOULD BE REMOVED.
                              GEOTEXTILE FABRIC: HEAVY-DUTY,             EXCAVATIONS BY PULLING THE SOIL AWAY        19. FORM THE SHAPE OF THE ROAD SURFACE
                              NEEDLE-PUNCHED, NON-WOVEN FILTER           FROM THE CHANNEL.                           IN ACCORDANCE WITH THE PLANS AND/OR         3. REPAIR ANY DAMAGE CAUSED BY
                              CLOTH (MINIMUM BIDIM A34 OR EQUIVALENT).                                               STANDARD DRAWINGS.                          CONSTRUCTION TRAFFIC. IF TRAFFIC HAS
                                                                         8. WHERE PRACTICABLE, CONSTRUCT THE                                                     EXPOSED BARE SOIL, STABILISED AS
                              INSTALLATION                               WATERCOURSE CROSSING PERPENDICULAR          20. APPLY A SUITABLE COVER OF AGGREGATE     APPROPRIATE. MAINTAIN A MINIMUM 200mm
                                                                         TO THE CHANNEL.                             OVER THE ROCK FILL TO FORM THE              COVER OVER THE CULVERTS.
                              1. PRIOR TO COMMENCING ANY WORKS,                                                      TRAFFICABLE ROAD SURFACE.
                              OBTAIN ALL NECESSARY APPROVALS AND         9. WHERE PRACTICABLE, THE APPROACH                                                      4. CHECK FOR EROSION OF THE FORMED
                              PERMITS REQUIRED TO CONSTRUCT THE          RAMPS SHOULD BE STRAIGHT FOR AT LEAST       21. FINISH CONSTRUCTION AND STABILISATION   EMBANKMENT, CHANNEL SCOUR, OR ROCK
                              TEMPORARY WATERCOURSE CROSSING,            10m AND SHOULD BE ALIGNED WITH THE          OF THE APPROACH ROADS INCLUDING THE         DISPLACEMENT. MAKE ALL NECESSARY
                              INCLUDING PERMITS FOR THE DISTURBANCE      CROSSING.                                   APPROACH RAMPS EACH SIDE OF THE BRIDGE      REPAIRS IMMEDIATELY.
                              OF BANK VEGETATION, AQUATIC VEGETATION                                                 CROSSING.
                              (e.g. MANGROVES) AND ANY TEMPORARY         10. WHERE PRACTICABLE, DIRECT                                                           5. CHECK THE BYPASS FLOODWAY MAKING
                              INSTREAM FLOW DIVERSION BARRIERS OR        STORMWATER RUNOFF FROM THE APPROACH         22. TAKE ALL REASONABLE MEASURES TO         SURE THE BANKS ARE STABLE.
                              SEDIMENT CONTROL MEASURES.                 RAMPS INTO STABLE DRAINS, ADJACENT          PREVENT EXCESS ROCK, DEBRIS AND
                                                                         VEGETATION, OR APPROPRIATE SEDIMENT         CONSTRUCTION MATERIAL FROM ENTERING         6. CHECK FOR EXCESSIVE EROSION ON THE
                              2. REFER TO APPROVED PLANS FOR LOCATION    TRAPS TO MINIMISE THE RELEASE OF            THE WATERCOURSE, ESPECIALLY ANY STILL       APPROACH ROADS.
                              AND CONSTRUCTION DETAILS. IF THERE ARE     SEDIMENT INTO THE WATERCOURSE.              OR FLOWING WATER.
                              QUESTIONS OR PROBLEMS WITH THE                                                                                                     7. CHECK THE CONDITIONS OF ANY FLOW
                              LOCATION OR METHOD OF INSTALLATION,        11. SHAPE THE CHANNEL, IF NECESSARY, TO     23. IF IT IS NOT PRACTICABLE TO STABILISE   DIVERSION CHANNELS/BANKS AND THE
                              CONTACT THE ENGINEER OR RESPONSIBLE        RECEIVE THE PIPE/S.                         THE ACCESS RAMPS AGAINST EROSION, THEN      OPERATING CONDITIONS OF ASSOCIATED
                              ON-SITE OFFICER FOR ASSISTANCE.                                                        INSTALL FLOW DIVERSION BANKS ACROSS         SEDIMENT TRAPS.
                                                                         12. IF HIGHLY EROSIVE SOILS ARE DETECTED,   THE WIDTH OF EACH ACCESS RAMP
                              3. ENSURE THAT THE LOCATION OF THE         THEN APPROPRIATELY STABILISE SUCH SOILS     ADJACENT THE TOP OF THE CHANNEL BANK,       REMOVAL
                              CROSSING WILL NOT INTERFERE WITH           AS SOON AS PRACTICABLE.                     AND AT REGULAR INTERVALS DOWN THE
                              FUTURE CONSTRUCTION WORKS.                                                             RAMPS (AS REQUIRED) TO PREVENT OR           1. TEMPORARY WATERCOURSE CROSSINGS
                                                                         13. COVER THE CROSSING FOOTING WITH         MINIMISE SEDIMENT-LADEN RUNOFF FLOWING      SHOULD BE REMOVED AS SOON AS POSSIBLE
                              4. PRIOR TO SIGNIFICANT LAND CLEARING OR   HEAVY-DUTY FILTER CLOTH.                    DIRECTLY INTO THE WATERCOURSE.              AFTER ALTERNATIVE ACCESS IS ACHIEVED OR
                              CONSTRUCTION OF THE APPROACH RAMPS,                                                                                                THE CULVERT IS NO LONGER NEEDED.
                              ESTABLISH ALL NECESSARY SEDIMENT           14. COVER THE FILTER CLOTH WITH A           24. APPROPRIATELY STABILISE ANY
                              CONTROL MEASURES AND FLOW DIVERSION        MINIMUM 150mm OF CLEAN, 50 TO 75mm          DISTURBED WATERCOURSE BANKS.                2. REMOVE ALL SPECIFIED MATERIALS AND
                              WORKS (INSTREAM AND OFF-STREAM AS          AGGREGATE.                                                                              DISPOSE OF IN A SUITABLE MANNER THAT WILL
                              REQUIRED), CLEARING ONLY THOSE AREAS                                                   25. STABILISE ALL DISTURBED AREAS THAT      NOT CAUSE AN EROSION OR POLLUTION
                              NECESSARY FOR INSTALLATION OF THESE        15. PLACE THE SPECIFIED SIZE AND NUMBER     ARE LIKELY TO BE SUBJECTED TO FLOWING       HAZARD.
                              MEASURES.                                  OF CULVERT CELLS AND ALIGN THEM WITH        WATER, INCLUDING BYPASS AND OVERFLOW
                                                                         THE DIRECTION OF THE DOWNSTREAM             AREAS, WITH ROCK OR OTHER SUITABLE          3. RESTORE THE WATERCOURSE CHANNEL TO
                              5. TO THE MAXIMUM DEGREE PRACTICABLE,      CHANNEL.                                    MATERIALS.                                  ITS ORIGINAL CROSS-SECTION, AND SMOOTH
                              CONSTRUCTION ACTIVITIES AND EQUIPMENT                                                                                              AND APPROPRIATELY STABILISE AND
Catchments & Creeks Pty Ltd




                              MUST NOT OPERATE WITHIN OPEN FLOWING       16. ENSURE THE PIPES EXTEND AT LEAST                                                    REVEGETATE ALL DISTURBED AREAS.
                              WATERS.                                    300mm BEYOND THE PROPOSED EXTEND OF
                                                                         ROCK FILL.
                              6. MAINTAIN CLEARING AND EXCAVATION OF
                              THE WATERCOURSE BED AND BANKS TO A         17. FILL BETWEEN THE PIPE/S WITH 75 TO                Drawn:       Date:
                              MINIMUM. INITIALLY CLEAR ONLY THE AREA     100mm AGGREGATE.
                                                                                                                                 GMW         Dec-09 Temporary Culvert Crossing TCC-02
Log in to download the original file

MCU14_0056 - Attachment G - Engineering Report & Stormwater Management Plan.pdf · 9.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.