Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

MCU14/0056 - Attachment G - Engineering Report & Stormwater Management Plan

of 103

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                            Cnr Myall Street & Ferrells Road Coorroy, QLD 4563
                                            State Planning Policy December 2013 - Healthy Waters (DERM)
                                               Performance Outcome Criteria and Acceptable Outcomes


    SPP code: Water quality

                Performance outcomes                               Acceptable outcomes                                        Solution

1   PO1                                                AO1.1                                              SO1.1
    The development is planned and designed            A site stormwater quality management plan          Water quality parameters and the proposed
    considering the land use constraints of the site   (SQMP) is prepared, and:                           limits applicable to this site have been selected
    for achieving stormwater design objectives.        a. is consistent with any local area stormwater    in accordance with South East Queensland
                                                       management planning, and                           Healthy Waterways Partnership’s Water by
                                                       b. provides for achievable stormwater quality      Design Guidelines. The proposed water quality
                                                       treatment measures meeting design objectives       treatment for this development is consistent
                                                       listed below in Table A (construction phase)       with any local area stormwater management
                                                       and Table B (post construction phase), or          planning and provides for achievable
                                                       current best practice environmental                stormwater quality treatment measures.
                                                       management, reflecting land use constraints,
                                                                                                          The proposed development will comply with
                                                       such as:
                                                                                                          the requirements of the SPP (2013) Table B:
                                                       • erosive, dispersive and/or saline soil types
                                                                                                          Post construction phase—stormwater
                                                       • landscape features (including landform)
                                                                                                          management design objectives.
                                                       • acid sulfate soil and management of
                                                       nutrients of            concern
                                                       • rainfall erosivity.
2   PO2                                                AO2.1                                              SO2.1
    Development does not discharge wastewater          A wastewater management plan (WWMP) is             Not applicable as a wastewater is not
    to a waterway or off site unless demonstrated      prepared by a suitably qualified person and        proposed for this development.
    to be best-practice environmental                  addresses:
    management for that site.
                                                       a. wastewater type, and
                                                       b. climatic conditions, and
                                                       c. water quality objectives (WQOs), and
                                                       d. best-practice environmental management,
Log in to download the original file

MCU14_0056 - Attachment G - Engineering Report & Stormwater Management Plan.pdf · 9.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.