MCU14/0056 - Attachment G - Engineering Report & Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Cnr Myall Street & Ferrells Road Coorroy, QLD 4563
State Planning Policy December 2013 - Healthy Waters (DERM)
Performance Outcome Criteria and Acceptable Outcomes
Performance outcomes Acceptable outcomes Solution
AO6.3
The ESCP demonstrates how stormwater
quality will be managed in accordance with an
acceptable regional or local guideline so that
target contaminants are treated to a design
objective at least equivalent to Acceptable
Outcome AO6.1.
7 PO7 AO7.1 SO7.1
Operational activities for the development Development incorporates stormwater flow Not applicable as a waterway is not proposed
avoid or minimises changes to waterway control measures to achieve the design for this development.
hydrology from adverse impacts of altered objectives set out below in Table A
stormwater quality and flow. (construction phase) and Table B (post
construction phase). Both the construction and
operational phases for the development
comply with design objectives in SPP Table A
(construction phase), and SPP Table B (post
construction phase), or current best practice
environmental management, including
management of frequent flows, peak flows,
and construction phase hydrological impacts.
8 PO8 AO8.1 SO8.1
Any treatment and disposal of waste water to See AO2.1 Not applicable as a waterway is not proposed
a waterway accounts for: for this development.
the applicable water quality objectives for
the receiving waters, and
adverse impact on ecosystem health or
receiving waters, and
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.