MCU14/0056 - Attachment G - Engineering Report & Stormwater Management Plan

of 103

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                           Cnr Myall Street & Ferrells Road Coorroy, QLD 4563
                                           State Planning Policy December 2013 - Healthy Waters (DERM)
                                              Performance Outcome Criteria and Acceptable Outcomes


               Performance outcomes                               Acceptable outcomes                                      Solution
                                                     AO6.3
                                                     The ESCP demonstrates how stormwater
                                                     quality will be managed in accordance with an
                                                     acceptable regional or local guideline so that
                                                     target contaminants are treated to a design
                                                     objective at least equivalent to Acceptable
                                                     Outcome AO6.1.

7   PO7                                              AO7.1                                               SO7.1
    Operational activities for the development       Development incorporates stormwater flow       Not applicable as a waterway is not proposed
    avoid or minimises changes to waterway           control measures to achieve the design         for this development.
    hydrology from adverse impacts of altered        objectives set out below in Table A
    stormwater quality and flow.                     (construction phase) and Table B (post
                                                     construction phase). Both the construction and
                                                     operational phases for the development
                                                     comply with design objectives in SPP Table A
                                                     (construction phase), and SPP Table B (post
                                                     construction phase), or current best practice
                                                     environmental management, including
                                                     management of frequent flows, peak flows,
                                                     and construction phase hydrological impacts.

8   PO8                                              AO8.1                                               SO8.1
    Any treatment and disposal of waste water to     See AO2.1                                           Not applicable as a waterway is not proposed
    a waterway accounts for:                                                                             for this development.
     the applicable water quality objectives for
      the receiving waters, and
     adverse impact on ecosystem health or
      receiving waters, and
Log in to download the original file

MCU14_0056 - Attachment G - Engineering Report & Stormwater Management Plan.pdf · 9.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.