Original source · versioned page text
MCU14/0056 - Attachment G - Engineering Report & Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Cnr Myall Street & Ferrells Road Coorroy, QLD 4563
State Planning Policy December 2013 - Healthy Waters (DERM)
Performance Outcome Criteria and Acceptable Outcomes
Performance outcomes Acceptable outcomes Solution
tidal artificial waterway to achieve relevant
water-quality objectives downstream of the
waterway, and
A10.3
Aquatic weeds are managed in any non-tidal
artificial waterway to achieve a low percentage
of coverage of the water surface area (less
than 10%). Pests and vectors (such as
mosquitoes) are managed through avoiding
stagnant water areas, providing for native fish
predators, and any other best practices for
monitoring and treating pests, and
A10.4
Any non-tidal artificial waterway is managed
and operated by a responsible entity under
agreement for the life of the waterway. The
responsible entity is to implement a deed of
agreement for the management and operation
of the waterway that:
a. identifies the waterway, and
b. states a period of responsibility for the
entity, and
c. states a process for any transfer of
responsibility for the waterway, and
d. states required actions under the
agreement for monitoring the water quality of
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.