Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

MCU14/0056 - Attachment G - Engineering Report & Stormwater Management Plan

of 103

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                            Cnr Myall Street & Ferrells Road Coorroy, QLD 4563
                                             State Planning Policy December 2013 - Healthy Waters (DERM)
                                                Performance Outcome Criteria and Acceptable Outcomes

                          measures                      • potential soil loss rate, or
                                                        • monthly erosivity, or
                                                        • average monthly rainfall
                                                        2. Collect and drain stormwater from disturbed soils to sediment basin for design storm event:
                                                        • design storm for sediment basin sizing is 80th% five-day event or similar
                          Design storm for              3. Site discharge during sediment basin dewatering:
                          sediment                      • TSS < 50 mg/L TSS, and
                          control basins                • Turbidity not >10% receiving waters turbidity, and
                                                        • pH 6.5–8.5
                          Sediment basin
                          dewatering

                          Litter and other waste,       1. Avoid wind-blown litter; remove gross pollutants
Water quality
                          hydrocarbons and other        2. Ensure there is no visible oil or grease sheen on released waters
                          contaminants                  3. Dispose of waste containing contaminants at authorised facilities
                          Changes to the natural        1. For peak flow for the 1-year and 100-year ARI event, use constructed sediment basins to
Waterway stability and
                          waterway hydraulics           attenuate the discharge rate of stormwater from the site
flood flow
                          and hydrology
management



    Table B: Post construction phase—stormwater management design objectives
    Application
    (a) Applies to western Queensland and Cape York/ Far North Queensland, for population centres greater than 25,000 persons, and
    (b) For all other climatic regions with population centres greater than 3000 persons.

    Please refer to water quality objectives table in main report for data applicable to this application. Please refer to Table B of SPP (2013)
    for complete data set.
Log in to download the original file

MCU14_0056 - Attachment G - Engineering Report & Stormwater Management Plan.pdf · 9.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.