Skip to the record
Accept no imitations.

Original source · versioned page text

MCU14/0056 - Attachment G - Engineering Report & Stormwater Management Plan

of 103

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Oil Capture and Containment
High Risk
                        SITE          Ararat Wind Farm, VIC.
Ararat Wind Farm        APPLICATION   Transformers
                        RISK          High
                        POLLUTANTS    Transformer oil
                        DISCHARGE     Stormwater
                        UNIT SUPPLIED P006 - PuraceptorTM Class 1 with 20,000 litre retention tank
                        T.F.R.        6 LPS
                        OPERATION	Due to the remote position of this transformer and the impact on the
                                      environment in the event of a failure, it was essential to the power
                                      provider to have a proven and reliable system. SPEL PURACEPTORTM
                                      was selected due to its proven “track record” in supplying the power
                                      industry, overall reliability and the necessity to have optimum quality
                                      discharge. Whilst the design of 6 LPS from the bund area caters for
                                      the nominal flow, a 20,000L spill retention was built into the system
                                      to hold the capacity of a transformer rupture.




                        SITE                Cranbourne Switchyard, VIC.
Cranbourne Switchyard   APPLICATION         Transformer Switchyard
                        RISK                High
                        POLLUTANTS          Transformer oil (70,000 litres)
                        DISCHARGE           Stormwater to river
                        UNIT SUPPLIED       P040 - PuraceptorTM Class 1 - oil capacity 70,000 litre
                        T.F.R.              40 LPS
                        OPERATION	This unit was installed to treat stormwater and firewater from
                                   the deluge system simultaneously. The unit caters for a 40 LPS
                                   flow rate, and has the capacity to capture a 70,000L transformer
                                   spillage and remain operational. SPEL units are designed and
                                   built to BS EN 858.1. 2006 it was able to be used as a
                                   designated flame trap, further enhancing its selection for this site.




                        SITE          Fuel Service Station, NSW.
Fuel Station            APPLICATION	Stormwater runoff from forecourt and immediate
                                      adjacent surfaces.
                        RISK          High
                        POLLUTANTS    Petrol, diesel, oils, suspended solids
                        DISCHARGE     Stormwater drain to Georges River.
                        UNIT SUPPLIED P006 Puraceptor™ Class 1
                        T.F.R.        6 LPS
                        OPERATION	Functions by gravity, will continue to be treated
                                      in the event of a power failure. Equipped with an
                                      oil/fuel alert probe for maintenance monitoring
                                      and to alert in the event of an emergency spill.




                                           Head Office
                                           83 – 87 Fennell Street, Parramatta NSW 2150
                                           02 9683 5555
                                           www.spelproducts.com.au
Log in to download the original file

MCU14_0056 - Attachment G - Engineering Report & Stormwater Management Plan.pdf · 9.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.