Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

MCU14/0056 - Attachment G - Engineering Report & Stormwater Management Plan

of 103

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                             ENG
                                                Engineering Report & Stormwater Management Plan
                                        Date:          16/06/2014     Document No.:      14012-ENG-01.Docx

                                         By:              AvT          Revision No.:              B


No clearing will be undertaken unless preceded or accompanied by installation of adequate
run-off and sediment control measures, as described above.

Following practical completion of the project a minimum of 70% coverage of all soil with
ground cover (i.e. topsoiling and seeding) will be provided within 30 calendar days.

During the construction phase spraying of water will be used with care to act as a dust
suppression method.

      Monitoring and Maintenance Programs
Water discharge from the site will adhere to a total suspended solid content of less than 50
milligrams per litre and a pH range of between 6.5 and 8.5 at all times. If the pH of the
flocculated water is not achieved than pH adjustments will be required. This could possibly be
done by a dosing of lime.

Site personnel will inspect all erosion and control measures at least at the following
frequencies:
    • Daily during construction works,
    • Weekly when construction works are not happening,
    • Within 24 hours of expected rain, and
    • Within 18 hours of an impacting rainfall event.

All erosion and sediment control measures that have an order of efficiency below 75% will be
corrected by the end of that working day.


 3. Earthworks

For the purpose of this proposed development earthworks will be conducted for constructing
the new proposed building platforms and roads. Excavation on site will be required for the
building platforms and service trenches. Any excess cut will need to be removed from the site
by the contractor. A geotechnical report will be prepared for the site during the detailed
design stage.


 4. Roadworks

The proposed development fronts onto both Myall Street and Ferrells Road. External
roadworks are proposed for this development in accordance with the traffic impact
assessment report by Pekol Traffic and Transport, project number 13-081.

A new left turn auxiliary deceleration lane (AUL) into the new development is proposed for
traffic travelling from South to North along Myall Street. Dimensions are outlined in the traffic
impact assessment report and to be detailed as per Austroad’s: Guide to Road Design

A PO Box 26, Carina Q 4152                                                                   6|P a g e
E [email protected]
W www.vtce.com.au
Log in to download the original file

MCU14_0056 - Attachment G - Engineering Report & Stormwater Management Plan.pdf · 9.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.