Original source · versioned page text
MCU14/0056 - Attachment G - Engineering Report & Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Corner Myall Street & Ferrells Road Cooroy, QLD 4563
Transport, Roads and Drainage Code
Transport, Roads and Drainage Code
Specific Outcomes Acceptable Solutions/Probable Solutions Compliance
iii. is adequate for predicted traffic volumes; and c) Queensland Design Code for Residential Streets; these documents.
iv. maintains the safe and efficient functioning of d) AUSTROADS Guide to Traffic Engineering Practice;
the road network without the use of traffic e) Sections 2 and 3 of PSP5 Engineering Design Standards –
signals; Roads, Drainage and Earthworks; or
v. is compatible with existing roads; f) the Noosa Cycling and Walking Network Development
vi. is easily maintained by Council equipment; and Plan;
vii. where appropriate, has the ability to
accommodate public transport services; OR
b) road pavement surfaces— g) A combination of the principles in these documents.
i. are durable enough to carry estimated wheel
loads of travelling and parked vehicles; AND
ii. provide for the safe passage of vehicles,
S7.3 On-road cycling treatment is utilised to provide safe Not applicable for this development.
pedestrians, cyclists, and discharge of stormwater
and continuous movement of cyclists along a roadway,
run-off from contributing catchments and the
such as--
preservation of all weather access;
a) sealed shoulders;
c) kerb and channel—
b) wide kerbside lane;
i. controls vehicle movement by delineating the
c) exclusive or peak period bicycle lane;
carriageway for all users;
d) advisory treatments such as Bicycle Awareness Zone;
ii. conveys road pavement run-off to stormwater
e) shared parking / bicycle lane;
drainage in a manner that allows the road to be
f) contra flow bicycle lane; and
trafficable in Q100 ARI local rainfall events; and
g) bus/bicycle lane.
d) verges and footpaths provide—
i. safe access for pedestrians and cyclists clear of
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.