Skip to the record
Accept no substitutions.

Original source · versioned page text

MCU14/0056 - Attachment G - Engineering Report & Stormwater Management Plan

of 103

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                              Corner Myall Street & Ferrells Road Cooroy, QLD 4563
                                                               Transport, Roads and Drainage Code


Transport, Roads and Drainage Code
Specific Outcomes                                    Acceptable Solutions/Probable Solutions                         Compliance
ongoing maintenance by Council.                      and Earthworks;                                                 engineering design drawings.
                                                     AND


                                                     S12.2 Where infrastructure is located on private land an        The proposed development works will
                                                     easement is dedicated over the infrastructure in                comply with this requirement as
                                                     accordance with Section 4 of PSP 5, Engineering Design          shown on the preliminary civil
                                                     Standards – Roads, Drainage and Earthworks.                     engineering design drawings.


14.148 Frontage works

                                                     S13.1 The following infrastructure components already           The proposed development works will
O13 Development is provided with external            exist at the frontage of the site or are provided at the        comply with this requirement as
roadworks along the full extent of the frontage of   developer’s expense—                                            shown on the preliminary civil
the site to an appropriate standard having regard    a) full width sealed road;                                      engineering design drawings.
to the specified function of the road.               b) concrete kerb and channel where appropriate;
                                                     c) forming and grading to footpaths;
                                                     d) vehicular kerb and footpath crossings;
                                                     e) a constructed bikeway;
                                                     f) a constructed footpath;
                                                     g) a constructed carriageway;
                                                     h) required alterations to public utility mains, services or
                                                     installations;
                                                     i) construction of any required alterations to public utility
                                                     mains, services or installations;
                                                     j) stormwater drainage works; and
                                                     k) installation of electrical conduits;

                                                     AND
Log in to download the original file

MCU14_0056 - Attachment G - Engineering Report & Stormwater Management Plan.pdf · 9.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.