Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Delegated Report - Code - Planning RAL25 0004 (As Published) · RAL25/0004

of 61

Text shows just the words. Original shows the document exactly as it was published.

                Infrastructure                            No acceptable outcome provided.         Not applicable.
                PO10
                Development accommodates and
                provides for the efficient and timely
                delivery of infrastructure appropriate
                to the site’s setting and intended use.

               PO11                                       No acceptable outcome provided.         Not applicable
               Roadway and pathway layout are
               predominantly rectilinear with a high
               degree of permeability.


                Editor’s Note— Further detail on
                traffic and the road network is
                addressed in Part 9.4.8 Transport
                Code

                Infrastructure and services

                PO12                                   AO12.1                             Complies.
                New lots are located, sized and All lots are connected to power
                                                                                          The subdivision layout will
                configured so as to ensure each lot is supply and telecommunications
                                                                                          be serviced by all necessary
                capable of being serviced by services and where located within
                                                                                          infrastructure            to
                appropriate levels of infrastructure the Urban boundaries, power supply
                                                                                          accommodate the future
                including:                             and communications infrastructure
                                                                                          development of the site.
                    a) power supply;                   are      provided     underground.
                    b) telecommunications; and
                    c) where within Local Plan Areas AO12.2
                    d) reticulated water supply;       If located in a water service area
                    e) reticulated sewerage; and       each new lot can be connected to
                    f) stormwater drainage.            Unitywater’s water supply network.

                                                          AO12.3
                                                          If located in a sewerage service area
                                                          each new lot can be connected to
                                                          Unitywater’s sewerage network.

                                                          AO12.4
                                                          If located in a Local plan area lots
                                                          can be connected to Council’s
                                                          stormwater     drainage    network.

                                                          AO12.5
                                                          If not in a sewerage service area
                                                          each lot has sufficient area and
                                                          other attributes to ensure efficient
                                                          and effective on-site sewerage
                                                          disposal.
                PO13                               AO13.1                             Complies.
                Each lot is provided with safe and Vehicular access for           the
                                                                                      The     proposed    layout
                convenient vehicle access          development is consistent with the
                                                                                      includes a new road which
                                                   function and design of the road it
                                                                                      is appropriate for its
                                                                                                         Page 45 of 61

Document Set ID: 23690498
Version: 0, Version Date: 01/01/1900

Used in these records

About this file

File size
3.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning RAL25 0004 (As Published).pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.