Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Revised DAForm1-Developmentapplicationdetails final

Attached to the e-mail Revised DA Form 1 Landing & Jetty Application OPW and MCU for 26 The Promontory.

of 15

Page text shows just the words. Original shows the document exactly as it was published.

  11) Dividing land into parts by agreement – how many parts are being created and what is the intended use of the
     parts?
  Intended use of parts created              Residential              Commercial              Industrial              Other, please specify:


  Number of parts created


  12) Boundary realignment
  12.1) What are the current and proposed areas for each lot comprising the premises?

                                Current lot                                                                Proposed lot
  Lot on plan description              Area (m2)                             Lot on plan description               Area (m2)




  12.2) What is the reason for the boundary realignment?




  13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
  (attach schedule if there are more than two easements)

  Existing or               Width (m)        Length (m)        Purpose of the easement? (e.g.                     Identify the land/lot(s)
  proposed?                                                    pedestrian access)                                 benefitted by the easement




Division 3 – Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.

  14.1) What is the nature of the operational work?

   Road work                                                Stormwater                            Water infrastructure
   Drainage work                                            Earthworks                            Sewage infrastructure
   Landscaping                                              Signage                               Clearing vegetation

   Other – please specify:                   Landing – timber jetty

  14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
   Yes – specify number of new lots:
   No
  14.3) What is the monetary value of the proposed operational work? (include GST, materials and labour)

  $ 15,000.00


PART 4 – ASSESSMENT MANAGER DETAILS

  15) Identify the assessment manager(s) who will be assessing this development application




                                                                                                                                              Page !6
                                                                                                           DA Form 1 – Development application details
                                                                                                                     Version 1.3— 28 September 2020
Log in to download the original file

Revised DAForm1-Developmentapplicationdetails final.pdf · 214 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.