MAINTENANCE:
1. INSPECT SEDIMENT FENCE WEEKLY, AND AFTER SIGNIFICANT RAINFALL. UNDERTAKE
X)
G (MA
SPACIN NTOUR, NECESSARY REPAIRS IMMEDIATELY.
T 20m O
' P L A CED A ONG THE C SLOPE 2. REPAIR ANY TORN SECTIONS WITH A CONTINUOUS PIECE OF FABRIC FROM POST TO
RNS DA L O N
'RETU IS LOCATE DEPENDING POST.
CE 0m
IF FEN 5 TO 1 1.5 3. IF FENCE BEGINS TO SAG BETWEEN POSTS. INSTALL ADDITIONAL SUPPORT POST.
TH ERWISE m
(M
O IN 1
) 4. REMOVE ACCUMULATED SEDIMENT IF THE SEDIMENT DEPOSIT EXCEEDS A DEPTH OF 3
THE HEIGHT OF THE FENCE.
5. REPLACE THE FENCE FABRIC IF THE EXISTING FABRIC SERVICE LIFE IS GREATER THAN 6
G
ACKIN MONTHS.
IRE B X)
ITH W A
(M AX) W ISE 2m (M
3m RW
DI
RE
CT
OTHE NOTE:
IO
N
OF 1. SEDIMENT FENCES MUST INCORPORATE REGULAR 'RETURNS', GENERALLY AT A MAXIMUM
FLO
W 20m SPACING, BUT CAN BE LESS AS THE SLOPE ALONG THE FENCE INCREASES.
2. MINIMUM FOUR STAPLES OR TIE WIRES PER STAKE
3. REFER TO APPROVED PLANS FOR LOCATION AND EXTENT. IF THERE ARE ANY CONCERN
ALL SUPPORT POSTS PLACED WITH THE LOCATION OR EXTENT, CONTACT THE ENGINEERS RESPONSIBLE FOR THE
DOWN-SLOPE OF FABRIC WORKS.
4. UNLESS OTHERWISE NOTED ENSURE FENCE IS LOCATED:
FABRIC
BURIED SEDIMENT FENCE FABRIC, I) ENTIRELY WITHIN THE PROPERTY BOUNDARY.
200mm NOT FILTER CLOTH OR SHADE II) ALONG A LINE OF CONSTANT ELEVATION WHERE POSSIBLE
CLOTH III) 2 METRES FROM THE TOE OF A FILLING OPERATION OR BATTER SLOPES
5. ENSURE FENCE IS PLACED IN A MANNER THAT AVOIDS HIGH FLOW RATES ALONG THE
LENGTH OF THE FENCE AND UNDESIRABLE DISCHARGE OF WATER AROUND THE ENDS OF
THE FENCE.
6. REMOVE SEDIMENT FENCE ONLY ONCE AREAS UPSLOPE OF SEDIMENT FENCE ARE
SEDIMENT FENCE SUFFICIENTLY STABILISED TO PREVENT EROSION. REHABILITATE AND VEGETATE
DISTURBED GROUND AS NECESSARY TO PREVENT EROSION
SCALE 1:50 7. ACCUMULATED SEDIMENT IS TO BE REMOVED IN A SUITABLE MANNER THAT WILL NOT
CAUSE EROSION OR A POLLUTION HAZARD.
10/03/2022
EA ID: 2557785
INSTALLATION RPEQ: 26443
300mm
MIN
FLOW CONTROL BERM INCORPORATED INTO THE 1. INSPECT ALL SITE ENTRY AND EXIT POINTS PRIOR TO FORECAST
DO NOT SCALE, IF IN DOUBT ASK!
ROCK PAD IF THE THE PAD RECEIVES RUNNOFF RAIN, DAILY DURING EXTENDED PERIODS OF RAINFALL, AFTER
MINIM FROM THE BUILDING SITE (LOCATION MAY VARY). RUNOFF-PRODUCING RAINFALL, OR OTHERWISE AT FORTNIGHTLY
UM LE
NGTH
10M INTERVALS.
2. IF SAND, SOIL, SEDIMENT OR MUD IF TRACKED OR WASHED ONTO
MAKE THE ADJACENT SEALED ROADWAY, THEN IT MUST BE REMOVED
40 - 75mm CRUSHED ROCK FOR P FOOTPATH
)
UP-SLOPE RUNOFF DIRECTED
IN
EDEST S USING A SHOVEL AND THEN A STIFF BRISTLED BROOM, AND THEN BY
RIAN T AFE
(M
TO AN APPROPRIATE RAFFIC A VACUUM IF AVAILABLE.
0m
SEDIMENT TRAP. .
3. IF NECESSARY FOR SAFETY REASONS, THE ROADWAY SHALL ONLY
2.
TH
BE WASHED CLEAN AFTER ALL REASONABLE EFFORTS HAVE BEEN
ID
TAKEN TO SHOVEL AND SWEEP THE MATERIAL FROM THE ROADWAY.
Y
KERB
W
AR
4. WHEN THE VOIDS BETWEEN THE ROCK BECOMES FILLED WITH
D
N
MATERIAL AND THE EFFECTIVENESS OF THE ROCK PAD IS REDUCED
U
BO
FOOTPATH TO A POINT WHERE SEDIMENT IS BEING TRACKED OFFSITE, A NEW 1 02/03/22 ISSUE FOR OP WORKS JAC BRP
TY
200mm
100mm LAYER OF ROCK MUST BE ADDED AND /OR THE ROCK PAD Rev Date Description By Chk
R
150 -
PE
MUST BE EXTENDED.
O
GEOTEXTILE FILTER ROADWAY
PR
5. ENSURE ANY ASSOCIATED DRAINAGE CONTROL MEASURES (E.G.
FABRIC (MANDATORY
FLOW CONTROL BERM) ARE MAINTAINED IN ACCORDANCE WITH
WHEN WORKING ON
THEIR DESIRED OPERATIONAL CONDITIONS,
CLAY SOILS).
6. DISPOSE OF SEDIMENT AND DEBRIS IN A MANNER THAT WILL NOT
CREATE AN EROSION OR POLLUTION [email protected]
TEMPORARY CONSTRUCTION ENTRY/EXIT 37 MARY ST NOOSAVILLE, QLD
NOT TO SCALE
07 5211 1003
Client
K. & J. HALSALL
Project Name
6 CEDAR STREET
COOROY
PROPOSED SUBDIVISION
Title
EROSION AND SEDIMENT
CONTROL DETAILS
Project No. Discipline Status
20210226 CIVIL OP WORKS
Designed By Drawn By Scale
(at
BRP JAC AS INDICATED A3)
Drawing No. Revision
C11 1
FULL SIZE ON ORIGINAL 0 10 20 30 40 50 60 70 80 90 100 mm
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.