OP WORKS
NOT FOR CONSTRUCTION
RESIDENTIAL DUPLEX DEVELOPMENT
6 WYANDRA STREET, NOOSA HEADS, QLD 4567
Lot 40 RP 139776
CIVIL WORKS
GENERAL NOTES:
THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS BEFORE 9. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL WORKPLACE
ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO PROVIDE A MINIMUM HEALTH AND SAFETY REQUIREMENTS.
OF 72 HOURS NOTICE TO RECOR FOR REQUIRED INSPECTIONS. SHOULD THE CONTRACTOR FAIL 10. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE PROXIMITY TO
TO REQUEST AN INSPECTION, THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS TO NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE, CONTRACTOR TO ALLOW IN
ALLOW FOR THE WORKS TO BE INSPECTED TO THE SATISFACTION OF RECOR. ANY SCOPE OF WORKS TO PROVIDE ALL MEASURES NECESSARY TO ENSURE THE INTEGRITY
INSPECTIONS THAT FAIL ARE TO BE RE-INSPECTED WITH ALL REINSPECTION COSTS TO BE PAID OF EXISTING BOUNDARIES AND INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW
BY THE CONTRACTOR. VIBRATION EQUIPMENT, TRENCH SHORING ETC AS REQUIRED.
a. PRESTART 11. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THESE DRAWINGS,
b. EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT AND EROSION THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN CONFIRMATION THAT
CONTROL MEASURES UNSUITABLE GROUND WORKS CAN COMMENCE.
c. SIDE AND CUT OFF DRAINS 12. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL CONSTRUCTED WORKS
IN ACCORDANCE WITH LOCAL GOVERNMENT REQUIREMENTS. UNLESS OTHERWISE
d. STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL ADVISED BY RECOR CONTRACTOR TO NOTE COUNCILS ADAC REQUIREMENTS.
e. STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT 13. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT APPROVALS.
f. STORMWATER STRUCTURE BASE SLABS 14. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL, LANDSCAPE AND
g. SEWER RETICULATION OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL CONSTRUCTION.
h. WATER RETICULATION 15. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION WORKS
COMMENCING ON SITE.
i. PAVEMENT SUBGRADE
16. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS AND
j. PAVEMENT REINFORCING SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.
k. PAVEMENT PRIOR TO SEALING (PRESEAL) 17. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING PROPERTIES AND
l. RETAINING WALL FOOTING REINFORCING COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT OF ANY WORKS ON SITE.
m. RETAINING WALL BLOCKWORK PRIOR TO CORE FILL 18. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED IN THE
APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO ENSURE ALL TREE ROOTS
n. STEEL REINFORCEMENT OF CONCRETE STRUCTURES AND STUMPS ARE COMPLETELY REMOVED AND BACKFILLED TO LEVEL 1 SUPERVISION.
o. PRACTICAL COMPLETION CONTRACTOR TO ALLOW TO MULCH ALL CLEARED VEGETATION AND STOCKPILE ON SITE
OR REMOVE FROM SITE AS DIRECTED.
p. ON MAINTENANCE
19. DRAWINGS TO BE READ IN CONJUNCTION WITH THE FOLLOWING
q. OFF MAINTENANCE CONSULTANTS/CONTRACTORS DRAWINGS:
r. ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER DEVELOPMENT SURVEYOR: NOOSA COOLOOLA LAND SURVEYORS PTY LTD
APPROVAL)
ARCHITECT: BLACKWOOD ARCHITECTURE & DESIGN
s. ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE RELEVANT TO THEIR
CERTIFICATION SCHEME HYDRAULICS: TBA
STRUCTURAL: RECOR
LOCALITY PLAN
GENERAL NOTES LANDSCAPE: BLACKWOOD ARCHITECTURE & DESIGN
NOT TO SCALE
1. ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN. 20. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY: ROAD
OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS WITHIN COUNCIL
2. ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS ASSOCIATED WITH
TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY SETOUT THE WORKS. IMPLEMENTATION OF THE TMP. 13/07/2022
3. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND 21. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL AUTHORITY APPROVALS EA ID: 2557785
WHERE FURTHER DETAILS ARE REQUIRED THE CONTRACTOR SHALL REFER TO NOOSA RECEIVED FOR THE PROJECT RPEQ: 26443
SHIRE COUNCIL DEVELOPMENT GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES,
ASSOCIATED STANDARD DRAWINGS AND SPECIFICATIONS U.N.O. 22. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH OPW APPROVALS BY DO NOT SCALE, IF IN DOUBT ASK!
COUNCIL.
4. SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF THE
TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND LOCAL AUTHORITY 23. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE BOUNDARY WITHOUT
REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT THEIR COST INCLUSIVE OF ANY FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF THAT LAND INCLUDING BUT NOT
ADDITIONAL COSTS INCURRED BY RECOR. LIMITED TO PRIVATE PROPERTY, ROAD RESERVE, PARKS/OPENSPACE, EASEMENTS.
5. EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS SUCH THEIR 24. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION DRAWINGS AND
ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS TAKEN BY RECOR OR THE APPROVALS ON SITE AT ALL TIMES.
PRINCIPAL FOR THE ACCURACY AND COMPLETENESS OF THIS INFORMATION. IT IS THE 25. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN ACCORDANCE
RESPONSIBILITY OF THE CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND CONSTRUCTION CODE (2013). C 11/07/22 ISSUE FOR OPW BP NW
LEVEL OF ALL EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY B 24/06/22 UPDATE ISSUE FOR MCU BP NW
DISCREPANCIES SHALL BE REPORTED TO THE SUPERINTENDENT. CONTRACTOR TO A 30/03/22 ISSUE FOR MCU BP NW
LOCATE AND PROTECT SERVICES AS REQUIRED DURING PROPOSED WORKS. Rev Date Description By Chk
6. THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND SURVEY ALL
CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN ON THE DRAWINGS
INCLUDING ANY POTENTIAL EXISTING SERVICES CLASHES PRIOR TO COMMENCEMENT OF DRAWING SCHEDULE
CIVIL WORKS. CONTRACTOR TO IMMEDIATELY REPORT ANY DISCREPANCIES TO RECOR
AND AWAIT FORMAL DIRECTION PRIOR TO COMMENCING CIVIL WORKS.
DRAWING NUMBER DRAWING TITLE REVISION
7. ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL BE C01 COVER SHEET AND LOCALITY PLAN C
RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS, CONCRETE AREAS,
C02 EXISTING SITE SERVICES PLAN C [email protected]
GRAVEL AREAS, GRASSED AREAS AND ROAD PAVEMENTS.
37 MARY ST NOOSAVILLE, QLD
8. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO C10 EROSION & SEDIMENT CONTROL PLAN C 07 5211 1003
AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR REINSTATEMENT TO BE
CARRIED OUT IMMEDIATELY TO THE SATISFACTION OF INFRASTRUCTURE
C11 EROSION & SEDIMENT CONTROL DETAILS C Client
FORDE PROPERTY
OWNER/MANAGER / AUTHORITY/COUNCIL. C20 BULK EARTHWORKS PLAN C Project Name
RESIDENTIAL DUPLEX DEVELOPMENT
C21 BULK EARTHWORK SECTIONS C 6 WYANDRA STREET
C30 ROADS AND DRAINAGE LAYOUT PLAN C NOOSA HEADS
C32 DRIVEWAY SECTIONS (1 OF 2) C Title
COVER SHEET AND LOCALITY PLAN
C33 DRIVEWAY SECTIONS (2 OF 2) C
C34 STORMWATER SECTION C
C35 STORMWATER CATCHMENT PLAN C
Project No. Discipline Status
20220078 CIVIL OPW
Designed By Drawn By Scale
(at
BRP BRP 1:100 A1)
Drawing No. Revision
C01 C
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 4 (of 13)
Section 2
OP WORKS
NOT FOR CONSTRUCTION
N
t
ran
24.70 24.79
Hyd
Fire
24.68
Sewer Manhole
25.46
25.41
25 102°02 41
.7 '00
20.115 " RP139776
7
24.7 26.35
3 TREE 0.1
50805
5
.2
24
25
26.83
24.00 .69
TREE 0.151004 27.0 Sewer
24.10 2
LIL 0.1 Line In
7
27.07 dicative
.5
3
50905
.7
26
9
26.60
Only (N
25
n
.2
rb
26.22
25
itume
26.69 ot Loc
e
25.
52 26.09 ated b
of K
5
27.
y Surv
.3
71 86
27.
26
2
ey)
EET
.8
3
of B
24
.4
26
24.17
0
2
2
Back
41
.7
.9
24.4
26.
26
25
26.41
Deck
Edge
4
.6
Pit a
26
25 26.
Telstr
.84 45
R
6
.4
23.57
25
4
RA ST
.5
23.
CLEAR AND GRUB ALL
24
67
00"
26 VEGETATION WITHIN SITE
DEMOLISH AND REMOVE
26.150
.50
BOUNDARY
12°02'
0
EXISTING DRIVEWAY
.5
9
26
.4
27.
27
Deck Stairs
46
23.
713
69
23.22
0
0.5
Ramp
0
23.3
23
C
WYAND
OIN
23.27
.98
5
.0
P
2
25
23.
.9
73
23
41
23.
23
8
9
.5
.65
.7
24
23
6
.1
26.1
26
Floor Level
9
74
.0
8
23.
2
27
00
.1
27
RL26.19
23.
24
23.00
40
.35
30.175 "
36
'00
24.
1
.34
.1
25
23
192°02
25.25
.63
22.68
Deck
24
Co
06
137
nc
ret 25.
23 .59 19
25.
RP160425
e
23.8
23.94
Dr
.23
6
.9
TBM (Screw in Kerb) .57
ive
26
25
7
22 3
RL22.58 AHD 26.5
wa
22.59
25
5
y
26.85
.35
23.7
Stairs
23
Gully Pit 4.5
5
.2
8
.2
2
1
22.36
Garage Level
24
22.49
1
.35
.3
DEMOLISH AND REMOVE
4
22
25
RL25.33
.6
24
0
26
.47
26.
3
.4
24.9
FROM SITE ALL EXISTING
25
37
22.25 22.36
STRUCTURES, PAVING AND
23
6
13/07/2022
25
.6
.7
07
22
.15
25.
5
RETAINING WALLS
32 5.69
4
.0
24.80 EA ID: 2557785
23
7°0 0
RPEQ: 26443
24.
94
3
2'0
LOCATE AND CAP OFF EXISTING
.1
22.21 DO NOT SCALE, IF IN DOUBT ASK!
25
3
25.92
22.10
7
.2
22.97
SEWER CONNECTION DURING
.1
0"
25
26
23
.65
EARTHWORKS
5
.7
24
8
.4
9
22.12
22
.6
23.72
24
22.0
0 22.08 23
80
.06 23.97
Valve
.
Po
24
0 8
22. we 23.37
282°02
8
CAP
.7
r C 11/07/22 ISSUE FOR OPW BP NW
24
21.98 po '00
16.090 "
it 22.09 le Telstra P 24.7 25.20 B 24/06/22 UPDATE ISSUE FOR MCU BP NW
y P .98
3 8
ll it 24.4
25
.51 A 30/03/22 ISSUE FOR MCU BP NW
Gu 21
22 Rev Date Description By Chk
25
Fire Hydrant 25.
25 5
.00 22
Back 3
.1
.42 7
.4
of Ker
5
22.3
1
Edge b
of Bitu 23.58
men 24.82
SAFARI 23
.46 Sewer Manhole
STREET
24.95
24.8 [email protected]
5
37 MARY ST NOOSAVILLE, QLD
07 5211 1003
Client
NOTE: FORDE PROPERTY
1. FOR GENERAL NOTES REFER DWG No. C01, WHICH IS TO BE REQUESTED AND VIEWED PRIOR 7. CONTRACTOR TO LOCATE ALL EXISTING UTILITIES ON SITE AND MAKE SUITABLE Project Name
TO COMMENCEMENT OF CONSTRUCTION IF NOT SUPPLIED. ARRANGEMENTS TO HAVE DISCONNECTED PRIOR TO DEMOLITION WORKS BEGINNING. RESIDENTIAL DUPLEX DEVELOPMENT
6 WYANDRA STREET
2. THE CONTRACTOR WILL MAKE HIMSELF FULLY AWARE OF THE EXISTING FEATURES OF THIS 8. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS DRAWING, THE
NOOSA HEADS
SITE AND ENSURE ANY ADDITIONAL WORKS NOT SHOWN ON THIS PLAN ARE INCLUDED IN THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN CONFIRMATION THAT WORKS
CONTRACT. CAN COMMENCE. NOTE:
Title
9. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING PROPERTIES AND EXCEPT WHERE NOTED ON PLAN AND ASSOCIATED DESIGN DRAWINGS, ALL EXISTING SITE SERVICES PLAN
3. LOCATION AND DEPTH OF ANY EXISTING SERVICES IDENTIFIED BASED ON SURVEY, DBYD AND IN-GROUND SERVICES WITHIN THE PROPERTY BOUNDARY INCLUDING BUT NOT
COUNCIL RECORDS. IT IS THE CONTRACTORS RESPONSIBILITY TO CONFIRM ACTUAL COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT OF ANY WORKS ON SITE. LIMITED TO: STORMWATER DRAINAGE, SEWERAGE, WATER, GAS, ELECTRICAL
LOCATION AND DEPTH PRIOR TO CARRYING OUT ANY EXCAVATION OR TRENCHING WORKS. 10. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS, RETAINING AND COMMUNICATIONS TO BE SAFELY BE DISCONNECTED, REMOVED FROM
SITE AND CAPPED OFF AT SITE BOUNDARY. CONTRACTOR TO ARRANGE ALL
4. CONTRACTOR TO LOCATE AND PROTECT ALL EXISTING SERVICES ON SITE AND WITHIN WALLS AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O. NECESSARY APPLICATIONS AND PERMITS WITH THE RELEVANT AUTHORITIES.
VERGE PRIOR TO COMMENCEMENT OF WORKS. 11. WHERE NECESSARY, CONTRACTOR SHALL OBTAIN ALL NECESSARY APPROVALS TO CARRY SERVICES TO BE CAPPED IN ACCORDANCE WITH RELEVANT SERVICE
PROVIDER SPECIFICATIONS AND STANDARD DETAILS
5. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR TO ANY DEMOLITION WORKS OUT SERVICES RELOCATION OR ALTERATIONS. Project No. Discipline Status
COMMENCING ON SITE. 20220078 CIVIL OPW
Designed By Drawn By Scale
6. ALL VEGETATION WITHIN THE LIMIT OF WORKS TO BE CLEARED, MULCHED, GRUBBED AND BRP BRP 1:100 (at
A1)
REMOVED FROM SITE IN ACCORDANCE WITH APPROVED VEGETATION CLEARING PLAN (BY
OTHERS) OR IF SCHEDULED STOCKPILE FOR USE BY LANDSCAPER. Drawing No. Revision
C02 C
Section 3
OP WORKS
NOT FOR CONSTRUCTION
N |S| SEDIMENT FENCING
t
ran
24.70 24.79
Hyd
FILTER SOCK SEDIMENT TRAP
Fire
24.68
Sewer Manhole
SEDIMENT AND EROSION CONTROL: 25.46 CONSTRUCTION ENTRY/EXIT
CONTRACTOR TO ALLOW FOR PROVISION OF ALL REQUIRED
25.41
25 102°02 41
SEDIMENT AND EROSION CONTROL DEVICES IN ACCORDANCE .7 |S|
'00
20.115 " RP139776
7
WITH IECA AND NOOSA SHIRE COUNCIL POLICIES AND
GUIDELINES 24.7 26.35
3 TREE 0.1
50805
5
.2
24
25
26.83
24.00 .69
TREE 0.151004 27.0 Sewer
24.10 2
LIL 0.1 Line In
7
27.07 dicative
.5
3
50905
.7
26
9
26.60
Only (N
25
n
.2
rb
26.22
25
itume
26.69 ot Loc
e
25.
52 26.09 ated b
of K
5
27.
y Surv
.3
71 86
27.
26
2
ey)
EET
.8
3
of B
24
.4
26
24.17
0
2
2
Back
41
.7
.9
24.4
26.
26
25
26.41
Deck
Edge
4
.6
Pit a
26
25
PROVIDE STABILISED 26.
Telstr
.84 45
R
6
CONSTRUCTION ENTRY/EXIT AS PER
.4
23.57
25
4
DETAIL E1 ON C11
RA ST
.5
23.
24
67
00"
26
|S|
26.150
.50
12°02'
0
.5
9
26
.4
27.
27
Deck Stairs
46
23.
|S|
713
69
23.22
0
0.5
Ramp
0
23.3
23
C
WYAND
OIN
23.27
.98
5
.0
P
2
25
23.
.9
73
23
|S|
41
23.
23
8
9
.5
.65
.7
24
23
6
.1
26.1
26
Floor Level
9
74
.0
8
23.
2
27
00
.1
|S|
27
RL26.19
23.
24
23.00
40
.35
30.175 "
36
'00
PROVIDE FILTER SOCK SEDIMENT 24.
1
.34
.1
|S|
25
23
TRAP TO DOWNSTREAM SAG INLET
192°02
25.25
.63
22.68
Deck
24
Co
AS PER DETAIL E3 ON C11 06
137
nc
ret 25.
23 .59 19
25.
|S|
RP160425
e
23.8
23.94
Dr
.23
6
.9
TBM (Screw in Kerb) .57
ive
26
25
7
22 3
RL22.58 AHD 26.5
wa
22.59
25
5
y
26.85
.35
23.7
Stairs
23
Gully Pit 5
24 |S|
4.5
.2
8
.2
2
1
22.36 22.49
Garage Level
1
.35
.3
4
22
25
RL25.33
.6
24
0
26
.47
26.
3
.4
24.9
25
37
22.25 22.36
23
6
13/07/2022
25
.6
.7
07
22
.15
25.
5
32|S| 5.69
4
.0
24.80 EA ID: 2557785
23
7°0 0
RPEQ: 26443
24.
94 PROVIDE SEDIMENT FENCE TO
3
2'0 |S|
.1
22.21 DO NOT SCALE, IF IN DOUBT ASK!
25
DOWNSTREAM BOUNDARY AS PER
3
25.92
22.10
7
.2
22.97
.1
0"
25
26
23
.65 DETAIL E4 ON C11
5
.7
24
8
.4
9
22.12
22
.6
23.72 |S|
24
|S|
22.0
0 22.08 23
80
.06 23.97 |S|
Valve
.
Po
24
08 |S|
22. we 23.37
282°02 |S|
8
CAP
.7
r C 11/07/22 ISSUE FOR OPW BP NW
24
21.98 po '00 |S|
16.090 "
it 22.09 le Telstra P 24.7 25.20 B NOT USED
y P .98
3 8
ll it 24.4
25
.51 A NOT USED
Gu 21
22 Rev Date Description By Chk
25
Fire Hydrant 25.
25 5
.00 22
Back 3
.1
.42 7
.4
of Ker
5
2 2.3
1
Edge b
of Bitu 23.58
men 24.82
SEDIMENT CONTROL SAFARI 23
.46 Sewer Manhole
STREET REVEGETATION
9. OVERALL
1. ALL SEDIMENT AND EROSION CONTROL MEASURES TO BE IN ACCORDANCE WITH INTERNATIONAL EROSION a. TEMPORARY DRAINAGE CONTROL FLOWS SHOULD BE DIVERTED AROUND THE WORK SITE WHERE POSSIBLE. 13. FOR REVEGETATION STANDARD SPECIFICATION REFER TO INTERNATIONAL EROSION CONTROL ASSOCIATION [email protected]
CONTROL ASSOCIATION (IECA) AUSTRALIA GUIDELINES AND THE SPECIFICATIONS. b. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND BE OPERATIONAL BEFORE AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING R-01 REVEGETATION GENERAL. 37 MARY ST NOOSAVILLE, QLD
1. SEDIMENT AND EROSION CONTROL DETAILS SHOWN ARE MINIMUM REQUIREMENTS. IT IS THE CONTRACTORS COMMENCING UP-SLOPE EARTHWORKS. 07 5211 1003
RESPONSIBILITY TO INSTALL ADDITIONAL CONTROL MEASURES AS DEEMED NECESSARY THROUGHOUT c. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES TO BE EITHER MULCHED, OPERATION AND MAINTENANCE
Client
CONSTRUCTION. COVERED WITH EROSION CONTROL BLANKETS OR TURFED IF EARTHWORKS ARE EXPECTED TO BE DELAYED 14. IN ACCORDANCE WITH NC ESC GUIDELINES, ALL ESC MEASURES SHALL BE INSPECTED:
FOR MORE THAN 14 DAYS. FORDE PROPERTY
2. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT CONTROL DEVICES IN A FUNCTIONAL ORDER AND · AT LEAST DAILY (WHEN WORK IS OCCURRING ON SITE) OR WEEKLY (WHEN WORK IS NOT OCCURRING ON SITE)
REPLACE ALL BLOCKED SEDIMENT DEVICES AS REQUIRED UNTIL SUCCESSFUL OFF MAINTENANCE OF WORKS. · WITHIN 24 HOURS OF EXPECTED RAIN; AND Project Name
SEDIMENT FENCE RESIDENTIAL DUPLEX DEVELOPMENT
3. CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE SATISFACTION OF THE SUPERINTENDENT. · WITHIN 18 HOURS OF A RAINFALL EVENT (I.E. AN EVENT OF SUFFICIENT INTENSITY AND DURATION TO MOBILISE
6 WYANDRA STREET
SHALL BE COMPLETED AND EFFECTIVE PRIOR TO: 10. FOR SEDIMENT FENCE STANDARD DETAIL AND SPECIFICATION REFER TO NOOSA SHIRE COUNCIL STANDARD SEDIMENT ON SITE).
NOOSA HEADS
a. STRIPPING OF TOPSOIL AND GRASS. DRAWING ESC-04 AND ESC-05, OR ALTERNATIVELY INTERNATIONAL EROSION CONTROL ASSOCIATION 16. IN ACCORDANCE WITH NC ESC GUIDELINES, MAINTENANCE OF ESC MEASURES SHALL OCCUR IN ACCORDANCE
b. BULK EARTHWORKS TO THE SITE. AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWINGS SF-01 AND SF-02 SEDIMENT FENCE. WITH THE FOLLOWING TABLE:
c. SERVICES INSTALLATION. Title
EROSION AND SEDIMENT CONTROL PLAN
d. PAVEMENT CONSTRUCTION TEMPORARY CONSTRUCTION ENTRY/EXIT MAINTENANCE SCHEDULE
5. ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE UNTIL INSTRUCTION IS RECEIVED IN WRITING 11. FOR CONSTRUCTION ENTRY / EXIT STANDARD DETAIL AND SPECIFICATION REFER TO NOOSA SHIRE COUNCIL TIMEFRAME FOR COMPLETION
ESC MEASURES MAINTENANCE TRIGGER
FROM THE SUPERINTENDENT TO REMOVE ALL OR PART OF THE SILT CONTROL APPLICATIONS. STANDARD DRAWING ESC-01, OR ALTERNATIVELY INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA OF MAINTENANCE
6. THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN SHALL BE READ IN CONJUNCTION WITH THE (IECA) BEST PRACTICES STANDARD DRAWINGS EXIT-01 AND EXIT-02 CONSTRUCTION EXIT - ROCK PAD SEDIMENT BASIN WHEN SETTLED SEDIMENT EXCEEDS THE WITHIN 7 DAYS OF THE
(WHERE UTILISED) VOLUME OF THE SEDIMENT STORAGE INSPECTION
APPROVED DRAWINGS. (CONSTRUCTION SITES ONLY), EXIT-03 - ROCK PADS FOR BUILDING SITES AND EXIT-04 AND EXIT-05 CONSTRUCTION ZONE (SEE COUNCIL'S SEDIMENT BASIN
7. PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE OBTAINED FROM THE SUPERINTENDENT FOR EXIT - VIBRATION GRID. DESIGN GUIDELINES
Project No. Discipline Status
THE LOCATION OF THE SITE ACCESS POINT AND WASH DOWN AREA WHICH ARE TO BE MAINTAINED THROUGHOUT OTHER ESC MEASURES THE REMAINING CAPACITY OF ESC BY THE END OF THE DAY
20220078 CIVIL OPW
THE CONSTRUCTION PERIOD. FILTER SOCK SEDIMENT TRAP MEASURES IS BELOW 50%
8. IF SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN FOUND TO BE DIFFERENT OR FAILED IN SERVICE, 12. FOR FILTER SOCK SEDIMENT TRAP STANDARD DETAIL AND SPECIFICATION REFER TO INTERNATIONAL EROSION REPORTING Designed By Drawn By Scale
1:100 (at
BRP BRP
CORRECTIVE ACTION IS TO BE UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE AMENDMENTS' ADDITIONS TO THE CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING ESC-03 KERB INLET SEDIMENT 17. CONTRACTOR IS TO PROVIDE AN UPDATED PROGRAM OF ESC MAINTENANCE AND CONTROL OF ALL STAGES OF
A1)
ORIGINAL APPROVED EROSION CONTROL PLANS. SUCH AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT, TRAPS. WORK FOR APPROVAL BY THE SUPERINTENDENT. Drawing No. Revision
IF DEEMED NECESSARY AND RELEVANT. C10 C
Section 4
OP WORKS
NOT FOR CONSTRUCTION
INSTALLATION
1. REFER TO INTERNATIONAL EROSION CONTROL ASSOCIATION
AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWINGS
300mm
EXIT-01 AND EXIT-02 CONSTRUCTION EXIT - ROCK PAD
MIN
(CONSTRUCTION SITES ONLY), EXIT-03 - ROCK PADS FOR
FLOW CONTROL BERM INCORPORATED INTO THE BUILDING SITES AND EXIT-04 AND EXIT-05 CONSTRUCTION EXIT -
ROCK PAD IF THE THE PAD RECEIVES RUNNOFF VIBRATION GRID FOR FURTHER DETAIL.
MINIM FROM THE BUILDING SITE (LOCATION MAY VARY). 2. INSPECT ALL SITE ENTRY AND EXIT POINTS PRIOR TO
UM LE
NGTH
10M FORECAST RAIN, DAILY DURING EXTENDED PERIODS OF
RAINFALL, AFTER RUNOFF-PRODUCING RAINFALL, OR
OTHERWISE AT FORTNIGHTLY INTERVALS.
40 - 75mm CRUSHED ROCK MAKE
)
UP-SLOPE RUNOFF DIRECTED
IN
3. IF SAND, SOIL, SEDIMENT OR MUD IF TRACKED OR WASHED
FOR P FOOTPATH
(M
TO AN APPROPRIATE EDEST S ONTO THE ADJACENT SEALED ROADWAY, THEN IT MUST BE
RIAN T AFE
0m
SEDIMENT TRAP. RAFFIC REMOVED USING A SHOVEL AND THEN A STIFF BRISTLED
2.
.
TH
BROOM, AND THEN BY A VACUUM IF AVAILABLE.
ID
4. IF NECESSARY FOR SAFETY REASONS, THE ROADWAY SHALL
Y
KERB
W
AR
ONLY BE WASHED CLEAN AFTER ALL REASONABLE EFFORTS
D
N
HAVE BEEN TAKEN TO SHOVEL AND SWEEP THE MATERIAL
U
BO
FOOTPATH FROM THE ROADWAY.
TY
200mm
5. WHEN THE VOIDS BETWEEN THE ROCK BECOMES FILLED WITH
R
150 -
PE
MATERIAL AND THE EFFECTIVENESS OF THE ROCK PAD IS
O
GEOTEXTILE FILTER ROADWAY
PR
REDUCED TO A POINT WHERE SEDIMENT IS BEING TRACKED
FABRIC (MANDATORY
OFFSITE, A NEW 100mm LAYER OF ROCK MUST BE ADDED AND
WHEN WORKING ON
/OR THE ROCK PAD MUST BE EXTENDED.
CLAY SOILS).
6. ENSURE ANY ASSOCIATED DRAINAGE CONTROL MEASURES
(E.G. FLOW CONTROL BERM) ARE MAINTAINED IN ACCORDANCE
WITH THEIR DESIRED OPERATIONAL CONDITIONS,
7. DISPOSE OF SEDIMENT AND DEBRIS IN A MANNER THAT WILL
E1 TEMPORARY CONSTRUCTION ENTRY/EXIT NOT CREATE AN EROSION OR POLLUTION HAZARD.
C10 SECTION NOT TO SCALE
INSTALLATION:
FILTER SOCKS MAY NEED TO FULLY SURROUND THE INLET TO
INTERCEPT SEDIMENT RUNOFF FROM THE ROAD AND VERGE. 1. REFER TO APPROVED PLANS FOR LOCATION, EXTENT AND CONSTRUCTION DETAILS. IF THERE
ARE QUESTIONS OR PROBLEMS WITH THE LOCATION, EXTENT, OR METHOD OF INSTALLATION
CONTACT THE ENGINEER OR RESPONSIBLE ON-SITE OFFICER FOR ASSISTANCE.
2. ENSURE THAT INSTALLATION OF THE SEDIMENT TRAP WILL NOT CAUSE UNDESIRABLE SAFETY
OR FLOODING ISSUES.
PVC PIPE SPACERS. 3. INSTALL SEDIMENT TRAP IN ACCORDANCE WITH THIS PLAN, OR AS DIRECTED BY THE SITE
SUPERINTENDANT.
4. MINIMUM HEIGHT OF SEDIMENT BARRIER IS 150mm AND MINIMUM SPACING FROM SIDE ENTRY
KERB INLET IS 125mm.
5. ENSURE THE SEDIMENT TRAP FULLY ENCLOSES THE KERB INLET. USE APPROPRIATE SPACERS
TO ENSURE THE SEDIMENT TRAP DOES NOT BLOCK THE SIDE ENTRY INLET.
6. IF NECESSARY, INSTALL ADDITIONAL 'ON-GRADE' KERB INLET SEDIMENT TRAPS UPSTREAM OF
SAG INLET TO ADEQUATELY RETAIN THE EXPECTED QUANTITY OF SEDIMENT RUNOFF.
7. TAKE ALL NECESSARY MEASURES TO MINIMISE THE SAFETY RISK CAUSED BY THE STRUCTURE.
8. REMOVE ONLY ONCE UPSLOPE DRAINAGE AREA HAS BEEN FULLY STABILISED. REMOVE ALL
FILTER SOCK SIDE INLET REMAINS MATERIALS INCLUDING DEPOSITED SEDIMENT AND DISPOSE OF IN MANNER THAT WILL NOT
OPEN. CAUSE AN EROSION OR POLLUTION HAZARD,
GULL GRATE WRAPPED IN NON
WOVEN FILTER FABRIC (MINIMUM,
BIDIM A34 OR EQUIVALENT).
MAINTENANCE: 13/07/2022
EA ID: 2557785
1. INSPECT ALL SEDIMENT TRAPS DAILY AND IMMEDIATELY AFTER RUNOFF PRODUCING RAINFALL RPEQ: 26443
AND MAKE REPAIRS AS NEEDED
2. REMOVE COLLECTED SEDIMENT REGULARLY AND DISPOSE OF IN MANNER THAT WILL NOT DO NOT SCALE, IF IN DOUBT ASK!
CAUSE AN EROSION OR POLLUTION HAZARD.
E3 SAG INLET FILTER SOCK SEDIMENT TRAP 3. ENSURE SEDIMENT DOES NOT ENTER THE STORMWATER DRAIN DURING DESILTING
C10 ORTHOGRAPHIC NOT TO SCALE
OPERATIONS AND MAINTENANCE OF THE TRAP
4. SEDIMENT ON THE ROAD SHALL BE REMOVED IMMEDIATELY IF IT REPRESENTS A SAFETY
HAZARD
C 11/07/22 ISSUE FOR OPW BP NW
B NOT USED
X)
G (MA
A NOT USED
SPACIN OUR, Rev Date Description By Chk
C E D AT 20m THE CONT PE
RNS' P
LA
D ALO
'RETU IS LOCATE DEPENDING
NG ON SL
O
INSTALLATION
CE 10m
IF FEN 5 TO 1.5
RWISE m
OTHE (M
IN 1. REFER TO INTERNATIONAL EROSION CONTROL ASSOCIATION
) AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWINGS
EXIT-01 AND EXIT-02 CONSTRUCTION EXIT - ROCK PAD
(CONSTRUCTION SITES ONLY), EXIT-03 - ROCK PADS FOR
BUILDING SITES AND EXIT-04 AND EXIT-05 CONSTRUCTION EXIT -
G [email protected]
CKIN VIBRATION GRID FOR FURTHER DETAIL.
E BA
W IT H WIR (MAX) 2. INSPECT ALL SITE ENTRY AND EXIT POINTS PRIOR TO 37 MARY ST NOOSAVILLE, QLD
AX) E 2m FORECAST RAIN, DAILY DURING EXTENDED PERIODS OF
07 5211 1003
3m (M HERWIS RAINFALL, AFTER RUNOFF-PRODUCING RAINFALL, OR
DI OT OTHERWISE AT FORTNIGHTLY INTERVALS.
RE Client
CT 3. IF SAND, SOIL, SEDIMENT OR MUD IF TRACKED OR WASHED
IO FORDE PROPERTY
N ONTO THE ADJACENT SEALED ROADWAY, THEN IT MUST BE
OF REMOVED USING A SHOVEL AND THEN A STIFF BRISTLED
FL Project Name
OW BROOM, AND THEN BY A VACUUM IF AVAILABLE. RESIDENTIAL DUPLEX DEVELOPMENT
4. IF NECESSARY FOR SAFETY REASONS, THE ROADWAY SHALL 6 WYANDRA STREET
ONLY BE WASHED CLEAN AFTER ALL REASONABLE EFFORTS NOOSA HEADS
HAVE BEEN TAKEN TO SHOVEL AND SWEEP THE MATERIAL
ALL SUPPORT POSTS PLACED FROM THE ROADWAY.
5. WHEN THE VOIDS BETWEEN THE ROCK BECOMES FILLED WITH Title
DOWN-SLOPE OF FABRIC
MATERIAL AND THE EFFECTIVENESS OF THE ROCK PAD IS EROSION AND SEDIMENT CONTROL DETAILS
FABRIC REDUCED TO A POINT WHERE SEDIMENT IS BEING TRACKED
BURIED SEDIMENT FENCE FABRIC, OFFSITE, A NEW 100mm LAYER OF ROCK MUST BE ADDED AND
200mm NOT FILTER CLOTH OR SHADE /OR THE ROCK PAD MUST BE EXTENDED.
6. ENSURE ANY ASSOCIATED DRAINAGE CONTROL MEASURES
CLOTH
(E.G. FLOW CONTROL BERM) ARE MAINTAINED IN ACCORDANCE
WITH THEIR DESIRED OPERATIONAL CONDITIONS,
7. DISPOSE OF SEDIMENT AND DEBRIS IN A MANNER THAT WILL Project No. Discipline Status
NOT CREATE AN EROSION OR POLLUTION HAZARD. 20220078 OPW
CIVIL
E4 SEDIMENT FENCE Designed By
BRP
Drawn By
BRP
Scale
1:100 (at
A1)
C10 ORTHOGRAPHIC NOT TO SCALE
Drawing No. Revision
C11 C