Council archive · source document
REC14/0007 & OPW14/0253 Report
Land Surveying Dynamics June 2014
SPECIFIC OUTCOMES PROBABLE SOLUTIONS COMMENTS
Setbacks and easements S1.1 The footing of any structure or building is Complies.
O1 Development near a sewer, water main, located clear of the zone of
stormwater drain, overland flow path or associated influence but no closer than 1.5m
structure does not— (measured horizontally) from infrastructure
a) adversely affect the function of the service; including sewers, water mains and
b) place an additional load on the service; and stormwater structures;
c) unduly increase future maintenance costs. AND
S1.2 No building or structure overhangs the
zone of influence;
AND
S1.3 Finished surface levels maintain a minimum of
600mm of cover, but no greater than 3m of cover to
the underground infrastructure;
AND
S1.4 If the existing surface is altered, surface level
services including manholes and inspection points
are altered to match the new surface level;
AND
S1.5 Alterations are constructed in accordance with
PSP6 -Engineering Design Standards - Water and
Sewerage and Section 4 of PSP5 - Engineering
Design Standards - Roads, Drainage and
Earthworks;
OR
S1.6 Existing services are relocated and the design
and construction of the relocated services is in
accordance with PSP6 - Engineering Design
Standards — Water and Sewerage and Section 4 of
PSP5 – Engineering Design Standards – Roads,
Drainage and Earthworks.
Reconfiguring of a Lot – Three (3) into Four (4) Lots
8 Stevens Street, Sunshine Beach
RPD: Lots 675 and 697 on RP48111 and Lot 676 on SP125656 57
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REC14/0007 & OPW14/0253 ReportRelated documentApplication case desk ↗
REC14/0007 & OPW14/0253 ReportRelated documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.