REC14/0007 & OPW14/0253 Report
Option 4b) seeking approval for 2 x 3 bedroom units (1 x duplex) on 1 of the Semi-
Attached zoned sites is unlikely to be supported as the proposed density of 6.6 persons
exceeds the maximum density of 4.8 persons for the site. However, an application for 2 x
2 bedroom units on 1 of the Semi-Attached zoned lots is likely to be supported.
Option 4c) A single detached house on one of the Semi-Attached lots is a consistent use
and would be code assessable, triggered by the Natural Resources Overlay with Coastal
Protection.
Option 5 - Reconfigure the entire site for multiple dwelling units and demolish the
existing dwelling
The combined site area of 2023.6m² could be developed as 6 x 3 bedroom dwelling units
or 8 x 2 bedroom dwelling units or a combination of two and three bedroom options.
This would allow the site to be developed as a single two storey building over a shared
basement car park (maximum building height 8m).The car park, pool and/ or open space
areas would be on community title.
This option would trigger infrastructure charges as follows:
8 x 2 bedroom dwelling units - $156,000 less $81,000 credit (for the original three lots) =
$75,000
6 x 3 bedroom dwelling units - $162,000 less $81,000 credit = $81,000.
Comment
Although multiple dwellings are consistent within the Semi-Attached area of the combined
lot, multiple dwellings are inconsistent in the Detached Housing zone area. Given multiple
dwellings are an inconsistent use within the Detached Housing zone and not in character
with the surrounding area, option 5 is not preferred and is unlikely to be supported.
Infrastructure Charges
No comment on the Infrastructure Contributions has been provided as written advice can
be requested from Councils Infrastructure Policy Branch as outlined in Item 5 below.
Design Development
Please contact Council if you have any queries regarding the advice provided in these
minutes. Confirmation of Council requirements can also be provided as design proposals
/ layout plans are drafted.
Landscaping Officer Name: John Birbeck
Ensure that vehicle access is off Stevens Street with no access along The Esplanade.
5. INFRASTRUCTURE CHARGES
A request for written advice for an Infrastructure Contributions Estimate relevant to your
proposal may be obtained for a fee of $211. You can request further details by emailing
[email protected]. FURTHER ADVICE TO BE SOUGHT
You are advised to contact Unitywater and any relevant Queensland Government
Agencies for their specific requirements in respect of your proposal.
This document is a record of prelodgement discussions and will not be made available for public viewing. Prelodgement
discussions are conducted to explore development options and requirements, identify issues and provide guidance to prospective
applicants about Council’s policies for development. The recorded discussion items and outcomes in no way imply or commit to an
approval of the proposal on the part of Council or Council officers, nor guarantee that all potential issues associated with a
development proposal have been raised / identified. When a formal development application is lodged, the proposal will be
assessed on its planning merits in accordance with Council’s policy framework existing at the time of the assessment.
FM6082/8-20/09/2012 Page 4 of 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REC14/0007 & OPW14/0253 ReportRelated documentApplication case desk ↗
REC14/0007 & OPW14/0253 ReportRelated documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.