Appendix B - OPW - Civil plans · OPW19/0082
Attached to the e-mail Operational Works Application OPW19/0082 - Application - DA Form 1 - Proposal Report - Civil & Landscaping Plans - 396 Lake Cooroibah Rd Coorooibah.
Plans and drawings: the text below has words only, no drawings.
LINDSAY CONSULTING PTY LTD
LINDSAY CONSULTING PTY
LTD
ü û
ü û
·
·
·
·
“ ”
[OCR of page images]
EROSION AND SEDIMENTATION MANAGEMENT PLAN
Sediment Control
ENVIRONMENTAL DIARY
Weekly Visual Inspection or After Rainfall Event
CONSTRUCTION MANAGEMENT PLAN
Objective
Comply with all statutory regulations and maintain erosion and sedimentation
controls throughout the duration of construction. Comply with the intent of
sedimentation management plan shown on sheet 29 of the drawings prepared
by Noel Covey & Associates, and other measures as deemed necessary to
control erosion and minimise sediment transport.
Project:—
Principal:—
Contractor:—
Location:—
Job Ref.
Operational Works
BRIAN WILLIAMS
396 LAKE COOROIBAH ROAD, NOOSA
17-1687
Approx Time:—
(1 Regular Monitoring (Weekly)
am/pm [1 Special Event Monitoring (briefly describe event)
Management Strategy
Site Foreman to identify direction of stormwater land flows and flows resulting
from construction, and provide sediment fences, rock filter dams, turf strips,
stormwater pit entry filters, and other measures as shown on the plan or as
deemed nec
sary to prevent uncontrolled stormwater flows over unprotected
areas, and avoid sediment transport to waterways and stormwater pits.
Item
Monitored
Date Corrective
Control Action
Measure Required
v
Installed x
Condition
Acceptable}
Corrective Action Taken
(Describe)
Tasks and Actions
Required
Erect sediment barriers as shown on sheet 29 of the drawings, and at other
locations as deemed necessary by visual inspection. Temporary rock filter dams
are to be placed at all concentrated stormwater flow outlet locations and
maintained with fresh filter screenings throughout the duration of construction
All earthworks areas to be topsoiled and seeded or hydromulched upon
completion of profiling. All footpath areas to be provided with a minimum 4m
wide turf strip behind kerb and channel immediately after footpath area
construction and topsoil profiling is completed. Strategically place filters around
all stormwater pits
Sediment
Fences
Rock
Filter
Dams
Stormwater
Outlets
Performance Indicators
Site Foreman to —
. check for erosion and sediment flows at base of all embankments
and other
exposed areas after rain;
. check that rock filter dams are working during rain periods;
. check that all sediment fences and other erosion control
mechanisms are
working during rain periods; and
. clean and maintain filter fabric covers to pits after rain periods.
Catchpit
Areas
Pavement
Areas
Bottom
of
Embankment
LINDSAY CONSULTING (7;
Cstructural
ivfl Engineers)
RPEQ 4928
OFF. 2C/82 PARKEB/STREET, MARO YDORE PH 54 792 118
THIS DRAWING REMAINS THE PROPERTY OF
LINDSAY CONSULTING PTY LTD AND IS FOR
THE SOLE USE OF THE CLIENT. NO PART
MAY BE USED IN PART OR WHOLE WITHOUT
PRIOR EXPRESS WRITTEN CONSENT OF
LINDSAY CONSULTING PTY LTD
Monitoring
Site Foreman to monitor performance of all sediment controls on a
regular weekly basis and after every rainfall event. Any damaged
sediment control item is to be rectified, and trapped silt removed and
deposited in an area not prone to erosion.
Humeceptors/
Gross
Pollutant
Traps
Detention
Basin
CLIENT AND PROJECT DESCRIPTION
BRIAN WILLIAMS
VILLAS DEVELOPMENT
396 LAKE COOROIBAH RD
NOOSA
Responsible Person
Site Foreman to be responsible for all inspections and maintenance of sediment
control measures
Other
Any Special Comments:—
Reporting
Site Foreman is to complete the Environmental Diary for sediment control on a
weekly bas
as a minimum, but also after every significant rainfall event or other
special event affecting the sediment control measures. The Environmental Diary
shall be completed and delivered to the Superintendent for record and audit
purposes with each progress claim for the construction works.
Signed:—
Corrective Actions
The Site Foreman to arrange for installation of additional sediment
controls and/or improve maintenance controls and replacement of
screenings to filter dams as required, and report on measures taken in
the Environmental Diary
DRAWING TITLE
CONST. MANAGEMENT PLAN
SCALES
Performance tem Penformance Indicator CONSTRUCTION MANAGEMENT PLAN DIARY
Indicators
1. Vegetation No disturbance of soil below retained vegetation due to construction Weekly Visual inspection or After Rainfall Event
activities ;
Project:- Operational Works
2. Hours of Work No work conducted outside specified hours without satisfactory evidence | Principal:-
of measures taken to suppress noise and other emissions / dust Contractor:— BRIAN WILLIAMS
Location:- 396 LAKE COOROIBAH ROAD, NOOSA
3. Lighting No resident’s complaints regarding construction security lighting. Job Ref. No:- 17-1687 Council File Ref. No.
4. Existing Roods No abutting public roads contain soil, gravel, clay or other such | Pale Lo Paula Monitoring (Week)
: materials originating from onsite construction activities Approx Time:- —_____________am/prn 7) Special Event Monitoring (briefly describe event)
5. Signage No observed or reported incidents due to inadequacy or absence of Date Control Condition Corrective Action Corrective Action Taken
signage or other control measures. Item Monitored Measure Installed | Acceptable Required (Describe)
v
x
6. Waste Control No complaints from local residents and site is kept tidy at all time
Retained Vegetation
N legal Ul ls w L
1. Waste Minimisation o occurrence of illegal dumping onsite and all materials where possible
have been appropriately recycled. Air Emissions
8. Dangerous Goods No spillage or seepage of dangerous goods stored onsite.
Noise
9. Erosion & Sedimentation No visible signs of sediment laden waters leaving the site. Security Lighting
10. Tratfic Management No works are carried out without implementation of the approved Traffic
Vibrations
Management Plan.
11. Existing Infrastructure No unplanned damage to existing utilities and infrastructure. Existing Utilities, Roods & Drainage Infrastructure
12. Non Conformances All non conformances have been reported and rectified Construction Traffic & Parking
The site foreman is to monitor the performance of all construction activities and any departure from the Waste Minimisation & Recycling
Monitoring Construction Management Plan control measures is to be immediately rectified.
Erosion & Sedimentation Control (Environmental Diary)
Responsible The site foreman is to be responsible for all inspections and maintenance of the Construction Management other
Person Plan.
The site foreman is to complete the Construction Management Plan Diary (including Environmental Diary for Item Monitored
sediment control) on a weekly basis as a minimum, but also after every significant rainfall event (which
causes site runoff) or other special event affecting the site or any watercourses traversing the site
Reporting The Construction Management Plan Diary {in conjunction with the Environmental Diary) shall be completed Any Special Comments
and delivered to the Superintendent for record and audit purposes with each progress claim for the
construction works.
Corrective The site foreman is to arrange all corrective actions, controls and rectification activities, and report on Signet
Actions all measures taken in the Construction Management Plan Diary
Objective To comply with all statutory regulations and relevant policies, and minimise the impact on the Construction 11. Implement the erosion and sedimentation control measures and associated management plan contained
environment whilst carrying out construction activities in a safe and sustainable manner. Management in the approved plans
Tasks and Actions
Required 12. All earthwork stockpiles are to be kept moist, covered with tarpaulins or otherwise treated to
minimise dust emissions and stored in locations which minimise the possibility of the soil entering the
stormwater system.
Management To minimise the environmental and amenity impact of construction activities through onsite proactive 13. A construction shakedown area is to be installed at the entrance to the site to reduce unwanted
Strategy approach to construction processes and consequences (cause and effect). Successful integration of soil from leaving the site via vehicle tyres.
activities will achieve ecological sustainability which is recognised as a balance that integrates the
protection of ecological processes and natural systems, economic development, and maintenance of
cultural, economic, physical and social wellbeing of people in communities
Construction
Management
Tasks and Action
Required
The following schedule of management strategies, tasks and actions for construction works forms the
basis of sustainable management of site construction issues. Irrespective of whether or not an item is
included in the following schedule however, the Contractor shall employ best practice measures to
achieve sustainable outcomes at all times.
Management Strategy / Action
1. Ensure that all staff and sub contractors working on the site are aware of potential environmental
impacts and required minimum environmental control measures and responsibilities before
commencement of any site works.
2. Disturbance of soils below the canopy of any retained vegetation is to be excluded or otherwise
minimised in accordance with the approved plans
3. No dust emissions shall extend beyond the boundary of the site
4. No odour emissions are detectable beyond the boundary of the site
5. Work, including plant and equipment maintenance and servicing, shall only be carried out between the
hours of 6:30am and 6:30pm Monday to Saturday inclusive. Written agreement must be provided by
neighbouring residents if any work activity with the potential to emit excessive noise is to be
undertaken outside the above mentioned hours, and even with such consent, such activities are to be
minimised.
6. All equipment shall be acoustically treated with manufacturer supplied muffler systems with ensure
that equipment does not create environmental harm or excessive noise.
7. Temporary security lighting for the site must be designed and located to ensure that its effects are
not obtrusive and direct light spill does not alter the amenity of adjacent properties.
8. All existing utilities (roads, drainage, electrical and communication) on or adjacent the site are to be
protected and maintained at all times, with the cost of any damage to such infrastructure to be
met by the Contractor.
9. Any areas of high risk / danger on the site are to be adequately signposted.
10. Vibration beyond the site boundary from construction activities is to be minimised and where there is
a likelihood of such vibration extending beyond the boundaries to an adjoining property owner, the
property owner shall be advised accordingly.
iu. All site staff and sub contractors shall be directed to use the nominated shakedown entry / exit
point.
15. Roads abutting the site and affected by the works shall be swept at regular intervals as required,
or whenever inspection shows signs of soil / pavement construction material on an abutting road or at
the nominated site entrance
16. A high level of site “housekeeping” shall be maintained to ensure that vermin are
not attracted to poorly disposed of materials. Any waste or materials that have
been illegally dumped on site shall be removed
17. The Contractor shall provide bins for s and sub contractors at locations
where food is consumed and shall ensure that such bins are used and emptied at
regular intervals.
18. All materials, be they construction materials or used containers, shall either be
recycled onsite or alternatively transported to a Council approved recycling station
or disposal point
19. Any distillate or other petroleum products or dangerous goods stored onsite are
to be in bunded areas, located well clear of any watercourse. Appropriate spill
control kits for any chemicals or stored fuels shall also be provided onsite.
20. Best practice management techniques shall be employed to control erosion and
minimise sediment transport onsite, including those details contained in the
approved plans and the Erosion and Sedimentation Management Plan.
21. The Contractor shall prepare and implement an approved Traffic Management
Plan for site construction activities. The Traffic Management Plan shall be provided
to the Council inspector and the Supervising Engineer at the prestart meeting.
22. Comply with any conditions of Council’s operational works approval applicable to
the works.
23. All public complaints received by the Contractor must be recorded in writing,
including any investigations undertaken, conclusions reached and actions taken as a
result of same. This complaints record is to be made available to the
administering authority on request.
24. All site personnel are to report any significant non—conformances to the site
manager as soon as practical and within 1 hour of the occurrence of, or
observance of same
25. The contractor shall prepare an informative letter to be dropped to
residents/businesses adjacent to the development. The letter is to advise contact
details for communications for the site manager, working hours, projected timing of
works and any other information the contractor sees relevant
SURVEY DATUM
ASSOCIATED CONSULTANTS
REVISION LIST
A_| ORIGINAL ISSUE 21/12/17
Computer File
171687-CP.DWG
DRAWING NUMBER SHEET] REV.
17-1687-C6 6)A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix B - OPW - Civil plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.