Appendix B - OPW - Civil plans · OPW19/0082

Attached to the e-mail Operational Works Application OPW19/0082 - Application - DA Form 1 - Proposal Report - Civil & Landscaping Plans - 396 Lake Cooroibah Rd Coorooibah.

of 9

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
LINDSAY CONSULTING PTY LTD




LINDSAY CONSULTING PTY
                   LTD


[OCR of page images]
 

 

OPEN CONCRETE BLOCKS

 

 

 

BAC OS
DRESS cS
LES CS OOS eS ES SE GS

 

GRAVEL FILTER

SANDBAG OVERLAP
ONTO KERB 4.0m_ MIN.

eS

 

 

 

 

 

 

oO

RUNOFF

 

a
3
z

600mm (NOM) GAP 2

BETWEEN SAND BAGS
ACT AS SPILLWAY

THREE LAYERS OF
SANDBAGS WITH ENDS
OVERLAPPED.

DOWN STREAM GULLY PROTECTION DETAILS

NOT TO SCALE

BURY THE TOP OF THE PLASTIC

IN TRENCH MIN 300mm DEEP.
SRS STAPLE AT 150mm _ CENTRES.
Bae COMPACT SOIL OVER BLANKET

FLOW
(==
SSS
PIKE
ROSS

 
  

CENTRELINE SECTION AT POINTS “A

FILL TRENCH WITH SOIL
AND COMPACT

OVERLAP—BURY UPPER END OF

LOWER BLANKET AS IN "A”. OVERLAP STAPLES: 8 GAUGE

  

SEDIMENT AND EROSIO
CONTROL DETAILS

N

 

 

 

 

WITH MAROON BOOK MANUAL FOR EROSION AND SEDIMENT CONTROL oe

 

UNDISTURBED AREA

ALL EROSION AND SEDIMENT IN ACCORDANCE WITH IN ACCORDANCE WITH Z| fed

 

 

 

 

GEOTEXTILE STAKES
FILTER FABRI [4 STAKES.

 

 

 

 

 

 

if

 

 

RUNOFF WATER
WITH SEDIMENT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SI ne - BOAR
70 : ee
..4 FILTERED GEOTEXTILE. —~
BURIED FABRIC WATER FILTER FABRIC

GEOTEXTILE INLET FILTER

GEOTEXTILE INLET FILTER CONSTRUCTION NOTES

1. FABRICATE A SEDIMENT BARRIER FROM GEOTEXTILE.

2. FOLLOW DETAIL FOR SEDIMENT FENCE FOR GEOFABRIC
INSTALLATION. REDUCE PICKET SPACINGS TO 1m CENTRES.

3. DO NOT COVER THE INLET WITH GEOTEXTILE UNLESS THE
DESIGN IS ADEQUATE TO ALLOW FOR ALL WATERS TO
BYPASS IT.

 
 
 
 
  

ot

END OF TOP BLANKET 300mm AND (4mm) WIRE Berm (300mm MIN height)
STAPLE AT 150 CRS.
4 SE q Y
aterm BEES RS x
Re SSA OAS Geotextile fabric, —~ |
KOKO Bidum U34 or similar Se
CENTRELINE SECTION AT POINTS "B” Unbound pavement material (gravel) to Grading ‘

B, Table 9 of QT Specification MRS11.05,
exclude material finer than sieve 2.36mm

STAPLE BLANKETS
AT GRID OF

STAPLE OUTSIDE EDGES
AT 300mm CRS.

 

CLEAN /DIRTY DIVERSION DRAINS

DIVERSION DRAIN CONSTRUCTION NOTES

1. REMOVE ANY ROCKS, CLODS, STICKS OR GRASS FROM THE SURFACE BEFORE LAYING PLASTIC.

2. ENSURE THAT TOPSOIL IS AT LEAST 75mm _ DEEP.

3. ENSURE PLASTIC WILL BE CONTINUOUSLY IN CONTACT WITH THE SOIL BY GRADING THE SURFACE
CAREFULLY FIRST.

4. LAY FABRIC IN "SHINGLE FASHION”, WITH THE END OF EACH UPSTREAM ROLL OVERLAPPING THOSE
DOWNSTREAM. ENSURE EACH ROLL IS ANCHORED PROPERLY AT ITS UPSLOPE END.

5. ENSURE FULL WIDTH OF FLOW CHANNEL IS COVERED BY THE PLASTIC.

GEOFABRIC FABRIC, BIDIM A34

OR SIMILAR ran

RUNOFF TO BE DIRECTED TO A SEDIMENT TRAP, ~
REFER STANDARD DRAWING D—0041.

  

a

Runoff from pad directed to sediment trap 600mm M

TEMPORARY CONSTRUCTION ENTRY/EXIT SEDIMENT TRAP

Not to Scale

CATTLE GRID 3.0m NOM WIDTH

   
   
 
    
  

CONSTRUCTION SITE

Ss

TEMPORARY ENTRY /EXIT

TEMPORARY ENTRY/EXIT CONSTRUCTION NOTES

RAN>

STRIP THE TOPSOIL, LEVEL THE SITE AND COMPACT THE SUBGRADE.

COVER THE AREA WITH NEEDLE-PUNCHED GEOTEXTILE.

CONSTRUCTION A 200mm THICK PAD OVER THE GEOTEXTILE USING ROAD BASE OR 30mm.
ENSURE THE STRUCTURE IS AT LEAST 15m LONG OR TO BUILDING ALIGNMENT AND AT
LEAST 3m WIDE.

WHERE SEDIMENT FENCE JOINS ONTO THE STABILISED ACCESS, CONSTRUCTION A HUMP OR
GRATE IN THE STABILISED ACCESS TO DIVERT WATER TO THE SEDIMENT FENCE.

 

 

   

 

 

 

 

    
    
 
  

DROP INLET
1.5m TIMBER STAKES
WITH GRATE \V VV NV AT MAX 2.5m CENTRES
DISTURBED
AREA

\V DIRECTION OF

 

STAKES DRIVEN INTO GROUND —~—_ \\
2 a
a

GEOTEXTILE FILTER FABRIC — AO

 

 

 

 

 
 
 
 

HOLD IN PLACE
WITH SAND BAGS

— GEOTEXTILE FILTER SOCK
FILLED WITH 25MM GRAVEL

KERB INLET PIT SEDIMENT BARRIER

1.5m TIMBER STAKES
AT MAX 2.5m CENTRES

SELF—-SUPPORTING
a GEOTEXTILE

DIRECTION OF

 
 
 
  
       

 

ad SX
PRS

 
 

 

ON SOIL, 150mm x 100mm
TRENCH WITH COMPACTED
BACKFILL AND ON ROCK, SET

SECTION DETAIL — INTO SURFACE CONCRETE

KERB INLET PIT SEDIMENT BARRIER

CONSTRUCTION NOTES

1. FABRICATE A SLEEVE FROM GEOTEXTILE OR WIRE MESH
LONGER THAN THE LENGTH OF THE INLET PIT AND FILL
WITH 25mm TO SOmm GRAVEL.

2. FORM AN ELLIPTICAL CROSS—SECIRCUITION APPROX. 150mm
HIGH, 400mm WIDE.

3. PLACE THE FILTER AT OPENING LEAVING AT LEAST
100mm BETWEEN KERB INLET AND SLEEVE. MAINTAIN
OPENING WITH SPACER BLOCKS.

4. FORM A SEAL WITH KERB TO PREVENT SEDIMENT
BYPASS.

5. SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR
THE MESH OR GEOTEXTILE PROVIDED THEY ARE PLACED
SO THAT THEY FIRMLY ABUT EACH OTHER AND
SEDIMENT LADEN WATERS CANNOT PASS BETWEEN.

   

"FLO

VV

  
   
 

SEDIMENT FENCE

9

 
     
  
 
   

§

[

|
L,90 DEG
on

SEDIMENT —_—
TRAP

@

— SEDIMENT

  

NOTE: POINTS @ AT SAME
ELEVATION

SEDIMENT FENCES
Sediment Fence installed across the contour
= uncontoured concentration of flow should be avoided
NOT TO REGULAR SCALE

 

 

 

sSEDIMENT FENCE CONSTRUCTION NOTES
1. CONSTRUCTION SEDIMENT FENCES AS CLOSE AS

POSSIBLE TO BEING PARALLEL TO THE CONTOURS OF THE

SITE, BUT WITH SMALL RETURNS. THE CATCHMENT AREA
SHOULD BE SMALL ENOUGH TO LIMIT WATER FLOW IF
CONCENTRATED AT ONE POINT.

2. CUT A 150-—mm DEEP TRENCH ALONG THE UPSLOPE
LINE OF THE FENCE FOR THE BOTTOM OF THE FABRIC TO
BE ENTRENCHED.

3. DRIVE TIMBER STAKES INTO GROUND AT 2.5m

INTERVALS (MAX) AT THE DOWNSLOPE EDGE OF THE TREN

4. FIX SELF—SUPPORTING GEOTEXTILE TO THE UPSLOPE
SIDE OF THE POSTS ENSURING IT GOES TO THE BASE OF
THE TRENCH. FIX THE GEOTEXTILE WITH WIRE RECOMMEND
BY THE MANUFACTURER. THE USE OF SHADE CLOTH FOR
THIS PURPOSE IS NOT SATISFACTORY.

5. JOIN SECTIONS OF THE FABRIC AT A SUPPORT POST
WITH A 150mm OVERLAP.

6. BACKFILL THE TRENCH OVER THE BASE OF THE FABRI
AND COMPACT IT THOROUGHLY OVER THE GEOTEXTILE.

LINDSAY CONSULTING (7;

Cstructural ivfl Engineers)
RPEQ 4928
OFF. 2C/82 PARKER/STREET, MAROGPHYDORE PH 54 792 118

 

 

 

THIS DRAWING REMAINS THE PROPERTY OF
LINDSAY CONSULTING PTY LTD AND IS FOR
THE SOLE USE OF THE CLIENT. NO PART
MAY BE USED IN PART OR WHOLE WITHOUT
PRIOR EXPRESS WRITTEN CONSENT OF
LINDSAY CONSULTING PTY LTD

 

CLIENT AND PROJECT DESCRIPTION

BRIAN WILLIAMS
VILLAS DEVELOPMENT

396 LAKE COOROIBAH RD
NOOSA

 

DRAWING TITLE
EROSION CONTROL

 

SCALES

 

SURVEY DATUM

 

ASSOCIATED CONSULTANTS

 

REVISION LIST

 

A_| ORIGINAL ISSUE 21/12/17

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Computer File

171687-CP.DWG

 

DRAWING NUMBER SHEET] REV.

17-1687-C8 8) A

 

 

 

 

 

Used in these records

About this file

File size
6.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix B - OPW - Civil plans.pdf · 6.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.