Integrated] DevelopmenttAssessment{Systemiform) .
Application Details - IDAS form 1
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
* complete this form (Application details - IDAS form 1)
. complete any other forms relevant to your application
¢ provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)
Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant” button below.
Namels (individual or company name in full) Noosa Jetty Builders
For companies, contact name [Danny Reed
Postal address [Po Box 299 Noosaville
Contact phone number : 10408137526
Mobile number (non-mandatory)
Fax number (non-mandatory) 54743480
e-mail address (non-mandatory) [email protected]
1. What is the nature of development proposed? (tick all applicable boxes)
material change of use of premises
building work Development Couriter
operational work
OOWO
-7 JUN 2010
reconfiguring a lot
Tewantin
Department of, Infrastructure.and Planning FOP lan} ANS eensland
: overnment
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 16 pages
Page 2
°
JIE)
SS
(2, What type of approval is being sought?
[Xx] development permit
(1 preliminary approval
[1] both - provide details below
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
J No
(1 Yes - complete table A and then go to question 5
4, Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
Lot on plan
Street Address description
Local government area
Unit | Street Street name and official Post |, 4 no,| Plan type (e.g. Logan,Cairns)
No. | No. suburb/locality name code “| and plan no. .
1 20 {Seahorse PL 4566 |740 |rpag5073 | Sunshine coast regional
Byte council
(Street address / tot on plan
Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
““ water e.g. jetty, pontoon) .
Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)
Coordinates (note: place each set of
coordinates in a separate row) Zone Local government
: reference Datum area (if applicable)
Easting Northing | Latitude | Longitude
(_] GDA94
1 (J wese4
(J other
5. Total area of the premises on which the development is proposed (indicate hectares or m?)
710m2
6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)
1 |house
7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)
Timber jetty
Application Details - IDAS form 1
Version 1.0 18 December 2009
Page 3
FEI __.
8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)
( No
BJ Yes - complete either table D, table E or table F as applicable
Table D (note: do not complete this table if lodging the application on-line using Smart eDA)
Name of owner/s of the land [Max &Alane Keegan o§ Elaune. kee f0s7
a
We, the above-mentioned owner/s of the land, consent to the making of this application.
Signature of owner/s of the land é Kixgor rpnn~ _F (Cas, _—
a a
Date Sy [S]20) o
Table E
Name of owner/s of the land
(J The owner's written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land
Oo By making this application, |, the applicant, declare that the owner has given written consent to the making of
the application.
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)
K) No (Yes - complete table G
10. identify if any of the following apply to the premises (tick applicable box/es)
J adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
(1 © onstrategic port land under the Transport Infrastructure Act 1994 - complete table |
CJ _ ina tidal water area - complete table J
Table H Name of water body, watercourse or aquifer
4 |Noosa Waters
11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)
{X]No [] Yes - ensure the type, location and dimension of each easement is included in the plans submitted
Application Details - [DAS form 1
Version 1.0 18 December 2009
Page 4
(JCI
12. Does the proposal include new buitding work or operational work on the premises? (including any
services)
(INo (Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted
13. is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
end of this form for more information)
No - Go to question 15 0 Yes
15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?
Bj No
C1] Yes - provide details below
16. List below ail of the forms and supporting information that accompany this application (include all [DAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)
Method of lodgement to
Description of attachment or title of attachment assessment manager
1 {form 6 over the counter
2 |check list
17. Applicant's declaration
x By making this application, | declare that all information in this application is true and correct (note: it is
unlawful to provide false or misleading information).
Application Details - IDAS form 1
Version 1.0 18 December 2009
Page 5
. OOO Notes for completing this form Question 8: ¢ Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is required under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or include a declaration by the applicant that the owner has given written consent to the making of the application. « Owner's consent is not required for a mobile and temporary ERA. Question 9: . ¢ Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be given, and the evidence required, to support the application. Question 13: * The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long service leave levy is payable. ¢ The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. Question 14: @ * The portable tong service leave levy need not be paid when the application is made, but the Building and Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued. * Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qid.gov. au. For further information contact QLeave on 1800 803 481 or www. gleave.qid.gov.au. Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your application. Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act 2009) or as required by Parliament. This information may be stored in a departmental database. The information’ cotlected will be retained as required by the Public Records Act 2002. OFFICE USE ONLY Date received 1 le |: 2 Reference numbers lo | HE NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER To: Council. | have been engaged as the private certifier for the . building work referred to in this application. Date of Name : BSA Certification Building engagement license number classification/s Application Details - IDAS form 1 Version 1.0 18 December 2009
Page 6
CIC] QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable) Date receipted form sighted by|Name of officer who assessment sighted the form manager QLeave Project |Amount Description of the work Number paid ($) Date paid 1 The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agencies. Application Details - IDAS form 7 Version 1.0 18 December 2009
Page 7
iintegratediD evelopmentfAssessment[systemIc necklisi Development assessment checklist - IDAS checklist 1 (Sustainable Planning Act 2009, version 1.0 18 December 2009) This checklist applies to the carrying out of development generally. You are not required to complete this checklist as part of your development application, however you may submit the checklist with your application if you wish. The purpose of the checklist is to assist you in identifying: * whether you need to make a development application for the proposed development * if development application is required, the relevant IDAS forms you need to complete as part of your application * whether you need to give a copy of your application to any referral agencies. If your development involves a material change of use, reconfiguring a lot or operationa! works, it is recommended that you complete Material change of use - IDAS checklist 2, Reconfiguring a lot - IDAS checklist 3 or Operational works - IDAS checklist 4, as applicable. If you are unsure how to answer any questions on this checklist, phone or ‘visit your local government, or go to the e Department of Infrastructure and Planning's website at www.dip.qid.gov.au. All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning Regulation 2009. Part 1 - General questions 1.1 Have you received a referral agency response in relation to this proposed development prior to making an application? —INo Ores | To assist you in preparing your application, completing Referral agency responses - IDAS checklist 6 is recommended 1.2 Do you wish the proposed development to be assessed against a superseded planning scheme? No . You must complete Request to apply a superseded planning scheme - Sustainable Planning Act @ CiYes form 2 and give this notice to the relevant local government. If the local government agrees to your request, details must be provided in Application details - IDAS form 1 1.3 Does the proposal involve removing quarry material from a watercourse or lake for which an allocation notice is. required under the Water Act 2000? XJNo [Yes 1.4 Is any part of the proposed development intended to be carried out on a Queensland heritage place under the Queensiand Heritage Act 19927 [XJ No ClYes | It is recommended that you complete part 3 of this checklist It is recommended that you complete part 2 of this checklist Department of Infrastructure‘and Planning Gran N iucensiand N\ 4 ora
Page 8
: a ¢ ¥ —— AS- ne - 1.5 Does the proposal involve development on a loca! heritage place? XJ No C1] Yes It is recommended that you complete part 4 of this checklist 1.6 Does the proposal involve an environmentally relevant activity, other than an agricultural ERA, a mining activity or a chapter 5A activity? BX] No DyYes |}- It is recommended that you complete part 5 of this checklist 1.7 Is any part of the development on strategic port land or airport land (other than development for a material change of use that is inconsistent with the land use plan for the strategic port land or airport land) KINo OYes It is recommended that you complete part 6 of this checklist 1.8 Is any part of the development on land below a high water mark within the limits of a port under the Transport Infrastructure Act 1994? EX] No CYes | It is recommended that you complete part 7 of this checklist 1.9 Is any part of the premises designated for community infrastructure? —] No LlYes | It is recommended that you complete part 8 of this checklist 1.10 Does the proposal involve the establishment or expansion of a waste water disposal system? KINo . (Yes | It is recommended that you complete part 9 of this checklist 1.11 Is the development on fand that adjoins a declared fish habitat area under the Fisheries Act 1994? No (] Yes |[- It is recommended that you complete part 10 of this checklist Privacy - please refer to your assessment manager for further details on the use of information recorded in this checklist. Disclaimer: While the Department of Infrastructure and Planning (DIP) believes that this information contained. on this checklist and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own enquiries regarding the interpretation and application of the applicable legistation to your circumstances. To the full extent permitted by law DIP expressly disclaims ali liability (including but not limited to liabitity for negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your reliance on this process and the information contained on this checklist. . Development application assessment checklist - IDAS checklist 1 Version 1.0 18 December 2009
Page 9
an OFFICE USE ONLY Date received Reference numbers The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. Development application assessment checklist - IDAS checklist 7 Version 1.0 18 December 2009
Page 10
integrated Development[Assessment[systems form]
Building or operational work assessable
against a planning scheme - IDAS form 6
(Sustainable Planning Act 2009 version 1.0'effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against
a planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
* — complete Applicant details - IDAS form 1
. complete any other forms relevant to your application
* provide any mandatory supporting information identified on the forms as being required to accompany your
application.
e@ Allterms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.
1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)
R building work - complete table A (J operational work - complete table B
Table A
What is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering,
underpinning, moving or demolishing a building)?
jetty
What type of approval is being sought? (if you have indicated multiple works in the above question, please generate
another Table A to detail each approval request)
development permit {11 pretiminary approval
Are there any current approvals associated with this application? (e.g. material change of use)
KX No , (Yes - provide details below
2. What is the dollar value of the proposed building work? (inc GST, materials and labour)! $ 14,500
Departmentof Infrastructurerand Planning @HEn
~ overnment
Page 11
— ABR —
3. Confirm the following mandatory supporting information accompanies this application
Confirmation
of lodgement Method of lodgement
All applications for operational works
site plans drawn to scale which show the following: .
* the location and site area of the land to which the application relates
(relevant land)
@ thenorth point _
the boundaries of the relevant land
* the allotment layout showing existing lots, any proposed lots (including
the dimensions of those {ots), existing or proposed road reserves, [Jconfirmed over the counter
building envelopes and existing or proposed open space (note: ,
numbering is required for ai! lots)
¢ any existing or proposed easements on the relevant {and and their
function :
any access limitation strips
* all existing and proposed roads and access points on the relevant land
a Statement about how the proposed development addresses the local
e@ government's planning schemes and any other planning documents {_|confirmed over the counter
relevant to the application ,
Applications for operational works involving earthworks (filling and excavating)
drawings showing:
¢ existing and proposed contours
*® areas to be cut and filled
@ the location and fevel of any permanent survey marks or reference
stations used as datum for the works [Jconfirmed electronic
® the location of any proposed retaining walls on the relevant land and
their height
e the defined flood level (if applicable)
the defined fill level (if applicable)
Applications for operational works involving roadworks
drawings showing:
¢ existing and proposed contours
@ ® the centreline or construction line showing chainages, bearings, offsets
if the construction line is not the centreline of the road and all
intersection points :
information for each curve including tangent point chainages and
offsets, curve radii, arc length, tangent length, superelevation (if
applicable) and curve widening (if applicable)
e kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
edge of pavement where kerb is not constructed [confirmed
position and extent of channelisation
location and details of all traffic signs, guideposts, guardrail and other
street furniture
pavement markings including details on raised pavement markers
catchpit, manhole and pipeline locations
drainage details (if applicable)
cross road drainage culverts (if applicable)
concrete footpaths and cycle paths
location and details for access points, ramps and invert crossings
changes in surfacing materia!
Building and operational work assessable against a planning scheme - IDAS form 6
Version 1.0 18 December 2009
Page 12
— 2S
Confirmation
of lodgement Method of lodgement
Applications for operational works involving stormwater drainage
drawings showing:
* existing and proposed contours
drainage locations, diameters and class of pipe, open drains and
easements ; [confirmed
* manhole location, chainage and offset or co-ordinates and inlet and
outlet invert levels
* inlet pit locations, chainage and offset or co-ordinates and invert and
kerb levels
Applications for operational works involving water reticulation
drawings showing:
¢ kerb lines or edge of pavement where kerb is not constructed
e location and levels of other utility services where affected by water
reticulation works
pipe diameter, type of pipe and pipe alignment
water main alignments CJ confirmed
water supply pump station details (if applicable)
minor reservoir details (if applicable)
conduits
location of valves and fire hydrants
location of house connections (if applicable)
location of bench marks and reference pegs
Applications for operational works involving sewerage reticulation
drawings showing:
location of all existing and proposed services
location of all existing and proposed sewer lines and manhole tocations
location of all house connection branches
kerb lines or edge of pavement where kerb is not constructed
chainages :
design sewer invert levels
design top of manhole levels
type of manhole and manhole cover
pipe diameter, type of pipe and pipe alignment
tocation of house connections (if applicable)
sewer pump station details (if applicable)
(\confirmed
Applications for operational works involving street lighting
drawings showing:
location of all light poles and service conduits
location of all other cross road conduits
type of wattage and lighting
any traffic calming devices -
additional plans for roundabouts and major roads (if applicable)
details of any variations to normal alignment
details of lighting levels
{confirmed
Building and operational work assessable against a planning scheme - IDAS form 6
. Version 1.0 18 December 2009
Page 13
.
- ERE —
Confirmation
of lodgement Method of lodgement
Applications for operational works involving public utility services
drawings showing: ,
* any existing light poles and power poles
© any existing underground services (leonfirmed
© details of proposed services
@ alternation to existing services
Applications for operational works involving landscaping works
drawings showing:
* the location of proposed plant species
e aplant schedule indicating common and botanical names, pot sizes
and numbers of plants °
* planting bed preparation details including topsoil depth, subgrade
preparation, mutch type and depth, type of turf, pebble, paving and {_]confirmed
garden edge .
the location and type of any existing trees to be retained
construction details of planter boxes, retaining walls and fences
the proposed maintenance period
irrigation system details
Notes for completing this form:
¢ This form can also be used for development applications for building works or operational works assessable
against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
mentioned, take it to mean the land use plan for the airport land.
Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.
OFFICE USE ONLY
Date Received Reference Numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
@ all other required application materials should be sent to your assessment manager and any referral agencies.
Building and operational work assessable against a planning scheme - IDAS form 6
Version 1.0 18 December 2009
Page 14
Regional Council
SALE OF DOCUMENTS
CIVICA TYPE
Sunshine Coast LAND USE SECTION FEES
RECEIPT TYPE
Superseded Planning Scheme Documentation 520:
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation _ 111
APPLICATION FEES
. Material Change of Use - Code/impact MCU
Consistent §21
Inconsistent 521
Assessment under Superseded Planning Scheme 521
’ Modification to a Development Permit MOD DP §21
Extension of a Currency Period 521
Lot Reconfiguration , RECOMFIG §21
Bldg Work assessable against the Planning Scheme 521
F@ LODGEMENT REVIEW
Half Hour 522
One Hour / 522
ADVERTISING \
: » Purchase Advertised Applications 523
JETTIES
” Jetty Application Fee <P cd 524
- . Jetty Bond < . Sho lS 5t
mo, : (Category 4)
BONDS _
Performance Bond 51
(Category 9)
SEARCH FEE :
Search of Land Use Section file 112°
/ Liquor Licensing Request 113
TOTAL $ ‘%¢27oO
NAME: . barfe ty _-¢. Cop Skrvw. tro ff C—
ADDRESS: fo bax (887
: . VoOosAvire Be .
FILE NO: bof QF DATE: to]w { fe .
: : T
RECEIPT NO: ! 627300 Signature of TP Officer: # J Siren p
AUTHORITY NO: Od
>
I4[2010 | Bie] :
Page 15
CALCULATION OF FEES APPLICATION FEE TOTAL FEES MCU - CODE ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION MCU - IMPACT ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 » FEE CALCULATION LON : © ce OPERATIONAL WORKS Details of Development / FEE CALCULATION TOTAL FEES _
Page 16
}-6L/01__ Osh INGINONGETY yd JONDNOM LNOAVI = a ONINVYS DSce wevain ‘sd N De WL HOUWN ALNNOO pecan mousey VEASM HSIN =a miva waved ez0s6sdy wUrurepowaIe Uy peur Sve 101 8 . ZLLEBYPD LO KRY LELLBPYS 2D Abed = NoudRosaa g ALLar g 902209 Od) ervey puepurtcy W ALWadOUd Twsd d3sod0ud ATA UUENO |, OL INE ubsoeg BAD / oer === Ar _ Saje|oossy 9g cos Tylon sod aMH | uspPJON uYyOor fF GALVIUL NIN 002 @ - LH V/. QL) Ald SNIYGVY *S3d My SUSLVM VSOON Qs aN ON HOWa SMS4NOS 73aS JOVid SSYOHVAS SSSINIVIS OMLHLIM — : (0Z°ON) Susuvad O1 Sx! TF QMH $14 SZ} x ge ; SVE LOT “ONINOSO § ALLS? GasodOud a ; NVOaay V3 l PYOOPL LLPO SOS? PD = = BTRLEL BOPO SECON SBASECON = = s s ORPERLIE LO Eid = OT OR Od ag zw ObL a8 x x" 962 9CO 860 99 NEV a2 ae 3 x 3 OZLEZL ON SOUSOT] SPE 107 Smgvs JWXSLOSO GALVIOOSSY CNY ONIHOLId SYy3q1ng 3NOLS JO UVIIO 39 O1 S3Tid ' . ALLS? VSOON wy SY DNV | M QL Ald Lid . 5 | prornonon A —— A Te = TF J ] mms At cae | rym one ALR ~ yon mn Om. ¢ NOILVAS 13 eit _4 a lL NOILVAS 13 7 3OV1d 3SYNOHVAS g 3COO ONMid - 6S1Z SV HLIM BONVGUOOOY NI GATIWLSNI 38 TIWHS S3id Ty py nsrna paypupmamnerreynes popupamaparrmronerars coment 0a NaH O2 CALYELL GNY RRRRCCRORRC: RERERERCRRE auvH uddv 3 TvH d ‘Sad I (| OHV #70 TY NALVM NNNININ © ! . 4 x = x CHV 0} Ta I GHY 01 Tg yoga Hy ob! yo3a race canoe sl TI¥M 30 dot "OHV 00% TH 71SAS7 GOO1g GSCNOOTY WANIXYN
Page 17
DEGONG:
125 x 38 HWO TES
SCREWED TO BEARERS 150 x 76 HWO NOTES:
2u16 J 216 SS 1. UNLESS NOTED OTHERWISE ALL TIMBER SHALL BE
DURABILITY CLASS 1 OF APPROVED SPECIES AND HAVE
OER PUES: A STRESS GRADE OF F14 MIN.
76 x 38 HWO O20 Hs MARINE HWD POLES
YTS xho\4 TYPE 17 wn aa z165-Puna Geos : 2. UNLESS NOTED OTHERWISE ALL CONSTRUCTION SHALL
SCREWS @ 450 CRS 200 x 75 HWO COMPLY WITH THE ENVIRONMENTAL PROTECTION AGENCYS'
OPERATIONAL POLICY - “BUILDING AND ENGINEERING
STANDARDS FOR TIDAL WORKS."
PLES:
NOTE THAT BO be TO EMALY 3. ALL STAINLESS STEEL BOLTS, RODS, ETC., SHALL BE
LOXTEHWO WITH AS 218% - PLING CODE APPROVED MARINE GRADE 316. ALL OTHER STEELWORK
WITH 24418 S/S BOLT D ET. Al L fT» INCLUDING NUTS, BOLTS, WASHERS, SCREWS, NAILS, ETC.,
vat SHALL BE HOT DIPPED GALVANISED OR STAINLESS STEEL.
4. TOP OF PILES SHALL BE SEALED AND FULLY CAP FLASHED
OR RINGED.
5. DIMENSIONS AND LEVELS SHALL NOT BE SCALED FROM
SECTION/A THE DRAWINGS.
120
150 x 75 HWO
10 PL BRACKET
eR, 2Al16 SIS TO EACH MEMBER
200 x 75 HWO
SEAHORSE PLACE
NOOSA WATERS
JETTY USE:
SINGLE USER, PRIVATE John Norden
& Associates
NO VEHICULAR ACCESS ,
WALKWAY DECK VERTICAL une
DESIGN LIVE LOAD - 2.0 kPa cee ma | Ponas
MAXIMUM MOORED VESSEL - 5m aA 3 =<. _—— = —
BERTHING VELOCITY - 0.5 m/sec 5 AsiTon wav zoo
Used in these records
10/0818 - Operational Works - Jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.