10/0818 - Operational Works - Jetty [As Published] · 142010.818

of 17

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

 

 

 

 

 

 

Integrated] DevelopmenttAssessment{Systemiform) .

 

 

 

 

Application Details - IDAS form 1

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.

For all development applications, you must:
* complete this form (Application details - IDAS form 1)
. complete any other forms relevant to your application

¢ provide any mandatory supporting information identified on the forms as being required to accompany your
application.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.

 

Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is

correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)

 

 

 

Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant” button below.

 

Namels (individual or company name in full) Noosa Jetty Builders

 

 

 

 

 

 

For companies, contact name [Danny Reed
Postal address [Po Box 299 Noosaville
Contact phone number : 10408137526

 

 

Mobile number (non-mandatory)

 

 

 

Fax number (non-mandatory) 54743480

 

 

e-mail address (non-mandatory) [email protected]

 

 

1. What is the nature of development proposed? (tick all applicable boxes)

 

 

material change of use of premises

building work Development Couriter

operational work

OOWO

-7 JUN 2010

reconfiguring a lot

 

Tewantin

 

 

 

 

 

Department of, Infrastructure.and Planning FOP lan} ANS eensland
: overnment

 

 

 

 
Full text of the other 16 pages

Page 2

°

JIE)

SS

 

(2, What type of approval is being sought?

 

 

 

[Xx] development permit
(1 preliminary approval
[1] both - provide details below

 

 

3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?

 

 

J No

(1 Yes - complete table A and then go to question 5

 

4, Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)

 

 

Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises

 

 

 

 

Lot on plan
Street Address description
Local government area
Unit | Street Street name and official Post |, 4 no,| Plan type (e.g. Logan,Cairns)
No. | No. suburb/locality name code “| and plan no. .
1 20 {Seahorse PL 4566 |740 |rpag5073 | Sunshine coast regional
Byte council

 

 

 

 

 

 

 

 

(Street address / tot on plan

Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
““ water e.g. jetty, pontoon) .

Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)

 

 

 

 

Coordinates (note: place each set of
coordinates in a separate row) Zone Local government
: reference Datum area (if applicable)
Easting Northing | Latitude | Longitude
(_] GDA94
1 (J wese4
(J other

 

 

 

 

 

 

 

 

 

 

5. Total area of the premises on which the development is proposed (indicate hectares or m?)

 

710m2

 

 

6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)

 

 

1 |house

 

 

 

 

7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)

 

Timber jetty

 

 

 

Application Details - IDAS form 1
Version 1.0 18 December 2009

 

Page 3

FEI __.

 

 

8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)

 

 

( No

BJ Yes - complete either table D, table E or table F as applicable

 

Table D (note: do not complete this table if lodging the application on-line using Smart eDA)

 

 

 

Name of owner/s of the land [Max &Alane Keegan o§ Elaune. kee f0s7
a

We, the above-mentioned owner/s of the land, consent to the making of this application.

 

 

Signature of owner/s of the land é Kixgor rpnn~ _F (Cas, _—
a a

 

Date Sy [S]20) o

 

 

Table E

 

 

Name of owner/s of the land

 

 

(J The owner's written consent is attached or will be provided separately to the assessment manager

 

Table F

 

 

 

Name of owner/s of the land

 

Oo By making this application, |, the applicant, declare that the owner has given written consent to the making of
the application.

 

 

9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)

 

K) No (Yes - complete table G

 

 

10. identify if any of the following apply to the premises (tick applicable box/es)

 

J adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
(1 © onstrategic port land under the Transport Infrastructure Act 1994 - complete table |
CJ _ ina tidal water area - complete table J

 

Table H Name of water body, watercourse or aquifer

 

4 |Noosa Waters

 

 

 

 

11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)

 

 

{X]No [] Yes - ensure the type, location and dimension of each easement is included in the plans submitted

 

Application Details - [DAS form 1
Version 1.0 18 December 2009

 

 

Page 4

 

 

 

 

(JCI

12. Does the proposal include new buitding work or operational work on the premises? (including any
services)

 

 

(INo (Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted

 

13. is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
end of this form for more information)

 

 

No - Go to question 15 0 Yes

 

15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?

 

Bj No
C1] Yes - provide details below

 

16. List below ail of the forms and supporting information that accompany this application (include all [DAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)

 

Method of lodgement to

Description of attachment or title of attachment assessment manager

 

1 {form 6 over the counter

 

2 |check list

 

 

 

 

 

17. Applicant's declaration

 

 

x By making this application, | declare that all information in this application is true and correct (note: it is
unlawful to provide false or misleading information).

 

 

Application Details - IDAS form 1
Version 1.0 18 December 2009

 

 

Page 5

. OOO

Notes for completing this form

Question 8:

¢ Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.

« Owner's consent is not required for a mobile and temporary ERA.

Question 9: .

¢ Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.

Question 13:

* The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
long service leave levy is payable.

¢ The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:

@ * The portable tong service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.

* Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at

www.qleave.qid.gov. au. For further information contact QLeave on 1800 803 481 or www. gleave.qid.gov.au.

Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information’
cotlected will be retained as required by the Public Records Act 2002.

 

OFFICE USE ONLY

 

 

 

 

 

 

Date received 1 le |: 2 Reference numbers lo | HE

 

NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER

 

To: Council. | have been engaged as the private certifier for the
. building work referred to in this application.

 

 

 

 

Date of Name : BSA Certification Building

engagement license number classification/s

 

 

 

 

 

 

 

Application Details - IDAS form 1
Version 1.0 18 December 2009

 

 

Page 6

CIC]

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)

 

Date receipted
form sighted by|Name of officer who
assessment sighted the form

manager

QLeave Project |Amount

Description of the work Number paid ($)

Date paid

 

1

 

 

 

 

 

 

 

 

The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.

 

Application Details - IDAS form 7
Version 1.0 18 December 2009

 

Page 7

 

 

 

 

 

 

iintegratediD evelopmentfAssessment[systemIc necklisi

 

 

 

 

Development assessment checklist - IDAS
checklist 1

(Sustainable Planning Act 2009, version 1.0 18 December 2009)
This checklist applies to the carrying out of development generally.

You are not required to complete this checklist as part of your development application, however you may submit the
checklist with your application if you wish. The purpose of the checklist is to assist you in identifying:

* whether you need to make a development application for the proposed development
* if development application is required, the relevant IDAS forms you need to complete as part of your application
* whether you need to give a copy of your application to any referral agencies.

If your development involves a material change of use, reconfiguring a lot or operationa! works, it is recommended
that you complete Material change of use - IDAS checklist 2, Reconfiguring a lot - IDAS checklist 3 or Operational
works - IDAS checklist 4, as applicable.

If you are unsure how to answer any questions on this checklist, phone or ‘visit your local government, or go to the
e Department of Infrastructure and Planning's website at www.dip.qid.gov.au.

All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.

 

Part 1 - General questions

 

 

1.1 Have you received a referral agency response in relation to this proposed development prior to making
an application?

 

 

—INo

Ores | To assist you in preparing your application, completing Referral agency responses - IDAS checklist
6 is recommended

 

 

 

1.2 Do you wish the proposed development to be assessed against a superseded planning scheme?

 

 

 

 

No
. You must complete Request to apply a superseded planning scheme - Sustainable Planning Act
@ CiYes form 2 and give this notice to the relevant local government. If the local government agrees to
your request, details must be provided in Application details - IDAS form 1

 

 

1.3 Does the proposal involve removing quarry material from a watercourse or lake for which an allocation
notice is. required under the Water Act 2000?

XJNo
[Yes

1.4 Is any part of the proposed development intended to be carried out on a Queensland heritage place under
the Queensiand Heritage Act 19927

[XJ No

ClYes | It is recommended that you complete part 3 of this checklist

 

 

 

It is recommended that you complete part 2 of this checklist

 

 

 

 

 

 

 

 

 

Department of Infrastructure‘and Planning Gran N iucensiand
N\ 4 ora

 

 

 

Page 8

:

a
¢

¥

 

—— AS- ne -

 

1.5 Does the proposal involve development on a loca! heritage place?

 

 

XJ No

 

C1] Yes

It is recommended that you complete part 4 of this checklist

 

 

 

1.6 Does the proposal involve an environmentally relevant activity, other than an agricultural ERA, a mining
activity or a chapter 5A activity?

 

 

BX] No

 

DyYes |}- It is recommended that you complete part 5 of this checklist

 

 

 

1.7 Is any part of the development on strategic port land or airport land (other than development for a
material change of use that is inconsistent with the land use plan for the strategic port land or airport land)

 

 

KINo

 

 

OYes It is recommended that you complete part 6 of this checklist

 

 

1.8 Is any part of the development on land below a high water mark within the limits of a port under the
Transport Infrastructure Act 1994?

 

 

EX] No

 

CYes | It is recommended that you complete part 7 of this checklist

 

 

1.9 Is any part of the premises designated for community infrastructure?

 

 

 

 

 

 

 

 

—] No

LlYes | It is recommended that you complete part 8 of this checklist

1.10 Does the proposal involve the establishment or expansion of a waste water disposal system?
KINo .

(Yes | It is recommended that you complete part 9 of this checklist

 

 

 

1.11 Is the development on fand that adjoins a declared fish habitat area under the Fisheries Act 1994?

 

 

No

 

 

 

(] Yes |[- It is recommended that you complete part 10 of this checklist

 

Privacy - please refer to your assessment manager for further details on the use of information recorded in
this checklist.

Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained. on this
checklist and provided as part of this process will be of assistance to you, it is provided on the basis that you will
not rely on the information without first making your own enquiries regarding the interpretation and application of
the applicable legistation to your circumstances.

To the full extent permitted by law DIP expressly disclaims ali liability (including but not limited to liabitity for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or
other consequence which may arise from your reliance on this process and the information contained on this
checklist. .

 

Development application assessment checklist - IDAS checklist 1
Version 1.0 18 December 2009

 

Page 9

an

 

OFFICE USE ONLY

 

Date received

 

 

 

Reference numbers

 

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.

 

Development application assessment checklist - IDAS checklist 7

Version 1.0 18 December 2009

Page 10

 

 

 

 

 

 

integrated Development[Assessment[systems form]

 

 

 

 

Building or operational work assessable
against a planning scheme - IDAS form 6

(Sustainable Planning Act 2009 version 1.0'effective 18 December 2009)

This form must be completed for development applications for building works or operational work assessable against
a planning scheme.

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.

For all development applications, you must:
* — complete Applicant details - IDAS form 1

. complete any other forms relevant to your application

* provide any mandatory supporting information identified on the forms as being required to accompany your
application.

e@ Allterms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning

 

Regulation 2009.

This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.

 

 

1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)

R building work - complete table A (J operational work - complete table B

 

Table A

What is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering,
underpinning, moving or demolishing a building)?

 

jetty

 

What type of approval is being sought? (if you have indicated multiple works in the above question, please generate
another Table A to detail each approval request)

development permit {11 pretiminary approval

Are there any current approvals associated with this application? (e.g. material change of use)

KX No , (Yes - provide details below

 

 

2. What is the dollar value of the proposed building work? (inc GST, materials and labour)! $ 14,500

 

 

 

 

 

 

 

Departmentof Infrastructurerand Planning @HEn
~ overnment

 

 

 

Page 11

— ABR —

 

 

 

3. Confirm the following mandatory supporting information accompanies this application

 

Confirmation

of lodgement Method of lodgement

 

All applications for operational works

 

site plans drawn to scale which show the following: .

* the location and site area of the land to which the application relates
(relevant land)

@ thenorth point _
the boundaries of the relevant land

* the allotment layout showing existing lots, any proposed lots (including
the dimensions of those {ots), existing or proposed road reserves, [Jconfirmed over the counter
building envelopes and existing or proposed open space (note: ,
numbering is required for ai! lots)

¢ any existing or proposed easements on the relevant {and and their
function :
any access limitation strips

* all existing and proposed roads and access points on the relevant land

 

a Statement about how the proposed development addresses the local
e@ government's planning schemes and any other planning documents {_|confirmed over the counter
relevant to the application ,

 

Applications for operational works involving earthworks (filling and excavating)

 

drawings showing:

¢ existing and proposed contours

*® areas to be cut and filled

@ the location and fevel of any permanent survey marks or reference
stations used as datum for the works [Jconfirmed electronic

® the location of any proposed retaining walls on the relevant land and
their height

e the defined flood level (if applicable)
the defined fill level (if applicable)

Applications for operational works involving roadworks

 

 

drawings showing:

¢ existing and proposed contours

@ ® the centreline or construction line showing chainages, bearings, offsets
if the construction line is not the centreline of the road and all
intersection points :

information for each curve including tangent point chainages and
offsets, curve radii, arc length, tangent length, superelevation (if
applicable) and curve widening (if applicable)

e kerb lines including kerb radii (where not parallel to centreline) and

tangent point changes (where not parallel to centreline)

edge of pavement where kerb is not constructed [confirmed

position and extent of channelisation

location and details of all traffic signs, guideposts, guardrail and other

street furniture

pavement markings including details on raised pavement markers

catchpit, manhole and pipeline locations

drainage details (if applicable)

cross road drainage culverts (if applicable)

concrete footpaths and cycle paths

location and details for access points, ramps and invert crossings

changes in surfacing materia!

 

 

 

 

 

Building and operational work assessable against a planning scheme - IDAS form 6
Version 1.0 18 December 2009

Page 12

— 2S

 

 

Confirmation

of lodgement Method of lodgement

 

Applications for operational works involving stormwater drainage

 

drawings showing:

* existing and proposed contours
drainage locations, diameters and class of pipe, open drains and
easements ; [confirmed

* manhole location, chainage and offset or co-ordinates and inlet and
outlet invert levels

* inlet pit locations, chainage and offset or co-ordinates and invert and
kerb levels

 

Applications for operational works involving water reticulation

 

drawings showing:

¢ kerb lines or edge of pavement where kerb is not constructed

e location and levels of other utility services where affected by water
reticulation works

pipe diameter, type of pipe and pipe alignment

water main alignments CJ confirmed
water supply pump station details (if applicable)
minor reservoir details (if applicable)

conduits

location of valves and fire hydrants

location of house connections (if applicable)
location of bench marks and reference pegs

Applications for operational works involving sewerage reticulation

 

 

drawings showing:

location of all existing and proposed services

location of all existing and proposed sewer lines and manhole tocations
location of all house connection branches

kerb lines or edge of pavement where kerb is not constructed
chainages :

design sewer invert levels

design top of manhole levels

type of manhole and manhole cover

pipe diameter, type of pipe and pipe alignment

tocation of house connections (if applicable)

sewer pump station details (if applicable)

(\confirmed

 

Applications for operational works involving street lighting

 

drawings showing:

location of all light poles and service conduits

location of all other cross road conduits

type of wattage and lighting

any traffic calming devices -
additional plans for roundabouts and major roads (if applicable)
details of any variations to normal alignment

details of lighting levels

{confirmed

 

 

 

 

 

Building and operational work assessable against a planning scheme - IDAS form 6
. Version 1.0 18 December 2009

 

Page 13

.

- ERE —

 

 

Confirmation

of lodgement Method of lodgement

 

Applications for operational works involving public utility services

 

drawings showing: ,
* any existing light poles and power poles

© any existing underground services (leonfirmed
© details of proposed services

@ alternation to existing services

 

Applications for operational works involving landscaping works

 

drawings showing:

* the location of proposed plant species

e aplant schedule indicating common and botanical names, pot sizes
and numbers of plants °

* planting bed preparation details including topsoil depth, subgrade

preparation, mutch type and depth, type of turf, pebble, paving and {_]confirmed

garden edge .

the location and type of any existing trees to be retained

construction details of planter boxes, retaining walls and fences

the proposed maintenance period

irrigation system details

 

 

 

 

Notes for completing this form:
¢ This form can also be used for development applications for building works or operational works assessable

against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
mentioned, take it to mean the land use plan for the airport land.

Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.

 

OFFICE USE ONLY

 

 

 

Date Received Reference Numbers

 

 

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
@ all other required application materials should be sent to your assessment manager and any referral agencies.

 

Building and operational work assessable against a planning scheme - IDAS form 6
Version 1.0 18 December 2009

 

Page 14

 

 

Regional Council

SALE OF DOCUMENTS

CIVICA TYPE

Sunshine Coast LAND USE SECTION FEES

RECEIPT TYPE

 

 

 

 

 

 

 

Superseded Planning Scheme Documentation 520:
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation _ 111
APPLICATION FEES
. Material Change of Use - Code/impact MCU
Consistent §21
Inconsistent 521
Assessment under Superseded Planning Scheme 521
’ Modification to a Development Permit MOD DP §21
Extension of a Currency Period 521
Lot Reconfiguration , RECOMFIG §21
Bldg Work assessable against the Planning Scheme 521
F@ LODGEMENT REVIEW
Half Hour 522
One Hour / 522
ADVERTISING \
: » Purchase Advertised Applications 523
JETTIES
” Jetty Application Fee <P cd 524
- . Jetty Bond < . Sho lS 5t
mo, : (Category 4)
BONDS _
Performance Bond 51
(Category 9)
SEARCH FEE :
Search of Land Use Section file 112°
/ Liquor Licensing Request 113
TOTAL $ ‘%¢27oO
NAME: . barfe ty _-¢. Cop Skrvw. tro ff C—
ADDRESS: fo bax (887
: . VoOosAvire Be .
FILE NO: bof QF DATE: to]w { fe .
: : T
RECEIPT NO: ! 627300 Signature of TP Officer: # J Siren p
AUTHORITY NO: Od

 

>

I4[2010 | Bie] :

Page 15

CALCULATION OF FEES

 

APPLICATION FEE

TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

MCU - IMPACT ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

»

FEE CALCULATION

LON :
© ce

 

OPERATIONAL WORKS
Details of Development /

FEE CALCULATION

 

 

 

TOTAL FEES _

 

 

 

Page 16

 

 

}-6L/01__

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Osh
INGINONGETY
yd JONDNOM LNOAVI
= a ONINVYS
DSce wevain ‘sd
N De WL
HOUWN ALNNOO
pecan mousey VEASM HSIN =a
miva waved ez0s6sdy
wUrurepowaIe Uy peur Sve 101 8 .
ZLLEBYPD LO KRY LELLBPYS 2D Abed = NoudRosaa g ALLar g
902209 Od) ervey puepurtcy W ALWadOUd Twsd d3sod0ud
ATA UUENO |, OL INE
ubsoeg BAD / oer
=== Ar _
Saje|oossy 9g cos Tylon sod aMH |
uspPJON uYyOor fF GALVIUL NIN 002 @ - LH
V/. QL) Ald SNIYGVY *S3d My
SUSLVM VSOON Qs aN
ON HOWa SMS4NOS 73aS
JOVid SSYOHVAS SSSINIVIS OMLHLIM — :
(0Z°ON) Susuvad O1 Sx! TF
QMH $14 SZ} x ge ;
SVE LOT “ONINOSO §
ALLS? GasodOud a ;
NVOaay V3 l
PYOOPL LLPO SOS? PD = =
BTRLEL BOPO SECON SBASECON = = s s
ORPERLIE LO Eid = OT OR Od ag zw ObL a8 x x"
962 9CO 860 99 NEV a2 ae 3 x 3
OZLEZL ON SOUSOT] SPE 107 Smgvs JWXSLOSO
GALVIOOSSY CNY ONIHOLId
SYy3q1ng 3NOLS JO UVIIO 39 O1 S3Tid ' .
ALLS? VSOON wy
SY DNV | M
QL Ald Lid . 5
| prornonon
A —— A Te = TF J
] mms At cae | rym one ALR
~ yon mn
Om.
¢ NOILVAS 13 eit _4
a lL NOILVAS 13
7 3OV1d 3SYNOHVAS g
3COO ONMid - 6S1Z SV HLIM
BONVGUOOOY NI GATIWLSNI 38 TIWHS S3id Ty py nsrna paypupmamnerreynes popupamaparrmronerars
coment 0a NaH O2 CALYELL GNY RRRRCCRORRC: RERERERCRRE
auvH uddv 3 TvH d
‘Sad
I
(| OHV #70 TY NALVM NNNININ ©
! . 4 x = x
CHV 0} Ta I GHY 01 Tg
yoga Hy ob! yo3a
race canoe sl TI¥M 30 dot

 

 

 

 

 

 

 

 

 

 

"OHV 00% TH 71SAS7 GOO1g GSCNOOTY WANIXYN

 

 

Page 17

 

DEGONG:
125 x 38 HWO TES
SCREWED TO BEARERS 150 x 76 HWO NOTES:
2u16 J 216 SS 1. UNLESS NOTED OTHERWISE ALL TIMBER SHALL BE

DURABILITY CLASS 1 OF APPROVED SPECIES AND HAVE

    
 

OER PUES: A STRESS GRADE OF F14 MIN.
76 x 38 HWO O20 Hs MARINE HWD POLES
YTS xho\4 TYPE 17 wn aa z165-Puna Geos : 2. UNLESS NOTED OTHERWISE ALL CONSTRUCTION SHALL
SCREWS @ 450 CRS 200 x 75 HWO COMPLY WITH THE ENVIRONMENTAL PROTECTION AGENCYS'
OPERATIONAL POLICY - “BUILDING AND ENGINEERING
STANDARDS FOR TIDAL WORKS."
PLES:

NOTE THAT BO be TO EMALY 3. ALL STAINLESS STEEL BOLTS, RODS, ETC., SHALL BE
LOXTEHWO WITH AS 218% - PLING CODE APPROVED MARINE GRADE 316. ALL OTHER STEELWORK
WITH 24418 S/S BOLT D ET. Al L fT» INCLUDING NUTS, BOLTS, WASHERS, SCREWS, NAILS, ETC.,

vat SHALL BE HOT DIPPED GALVANISED OR STAINLESS STEEL.
4. TOP OF PILES SHALL BE SEALED AND FULLY CAP FLASHED
OR RINGED.
5. DIMENSIONS AND LEVELS SHALL NOT BE SCALED FROM
SECTION/A THE DRAWINGS.
120

150 x 75 HWO

10 PL BRACKET
eR, 2Al16 SIS TO EACH MEMBER

200 x 75 HWO

SEAHORSE PLACE
NOOSA WATERS

   
 

  

JETTY USE:

SINGLE USER, PRIVATE John Norden
& Associates

NO VEHICULAR ACCESS ,
WALKWAY DECK VERTICAL une
DESIGN LIVE LOAD - 2.0 kPa cee ma | Ponas
MAXIMUM MOORED VESSEL - 5m aA 3 =<. _—— = —
BERTHING VELOCITY - 0.5 m/sec 5 AsiTon wav zoo

     

Used in these records

About this file

File size
1.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

10_0818 - Operational Works - Jetty [As Published].pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.