3 SITE DESCRIPTION
The construction area has a gradient in the order of 15-3% with gradients of up to 45% at the rear of the block.
Vegetation on the construction area (and nearby surrounds) consists of grasses and dense trees.
The trees are located on and adjacent the proposed construction site.
The trees are of a height and proximity that could affect the moisture conditions within the proposed
construction site. Refer to the appendices to the rear of this report for guidance on Trees and Construction.
The existing surface drainage is good and sub-surface drainage is good.
4 FINDINGS
The soil profiles encountered are shown on the attached borelog sections.
No water table was encountered during our testing program.
The sandy soils encountered are susceptible to collapse when unconfined. This may effect excavations and
result in additional earthworks and increased concrete volumes. Temporary shoring or Forma-Tube may be
required to retain the sands prior to concreting.
The samples classified on-site were assessed as having negligible plasticity, therefore laboratory testing was
considered unnecessary.
We have assessed the expected differential movement of the soil profiles encountered to be the equivalent of a
site with a Ys of less than 20mm.
For buildings within the scope of AS 2870-2011 a maximum allowable bearing pressure of 100 kPa is available
within the natural soils at the following depths:
Test Site 1 - 1700 mm Test Site 2 – 1700 mm
The following foundation material will provide a safe bearing capacity (100 kPa) for buildings within the scope of
AS 2870-2011 and is shown shaded on the attached logs;
FOUNDATION MATERIAL - NATURAL MEDIUM DENSE SILTY SAND
5 SITE PREPARATION DETAILS
We recommend scraping this site free of all organic material and debris. The proposed construction areas
should then be levelled suitable for the construction of a brick/block base. The bases must be filled with a
clean granular material such as sand, crusher dust or deco rock. The fill is to be free of organic material and
have no clay content. The fill shall not exceed 600mm in depth and is to be wetted and compacted in 150mm
layers with a vibrating plate making 6 passes (3 in each direction). Temporary back propping to the brick/block
base should be provided throughout the compaction process. The compaction is to be sufficient to achieve a
blow count of 7 blows per 300mm with an approved Perth Sand Penetrometer. Test results must be presented
for approval prior to commencing slab preparations.
Where a retaining wall is required, a cut batter of 1 to 2 (vertical to horizontal) in the sand profile taken from the
base of the proposed wall should be excavated. These earthworks must incorporate shallow surface spoon
drains at the base and along the high side of the cut. Drains must have an efficient outflow down-slope and
clear of the construction area. The exposed face should also be protected against the potential for stormwater
erosion. Should these recommendations be un-achievable the builder should seek guidance from this office on
temporary shoring, benching or other suitable techniques.
Areas where existing structures or trees are removed shall be backfilled with engineer approved fill material
compacted to achieve a minimum relative field density of 95% and be in accordance with AS2870-2011.
Where trees are removed prior to construction the moisture conditions of the soils must be allowed to normalise
across the site prior to commencing foundation preparations.
SCG Consulting Engineers 2 SCG Ref: 25464(S)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Soil Test & Footing Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.