REPORT

                                                                      Appendix G

                                                     Stormwater Management Report




PR139784 | Town Planning Report | v4 | 5 June 2019
rpsgroup.com
Log in to download the original file

Appendix G - Stormwater Management Report.pdf · 9.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 23 pages

Page 2

RPS Project Management c/- Lutheran Services                              I
PF80 - Cooroy Care Farm
28 May 2018                                              Ref. No. 2017.0616




 PF80 - COOROY
 CARE FARM
 STORMWATER MANAGEMENT
 PLAN
 Company. RPS Project Management c/- Lutheran Services
 Contact. Mark McConnell
 Date.28 May 2018
 RFQ # 2017.0616

Page 3

RPS Project Management c/- Lutheran Services                                                   II
PF80 - Cooroy Care Farm
28 May 2018                                                                    Ref. No. 2017.0616




DOCUMENT CONTROL SHEET
DOCUMENT
PF80 - Cooroy Care Farm

JOB NUMBER
2017.0616

PROJECT ENGINEER
Jack Landsberg

CLIENT
RPS Project Management c/- Lutheran Services

CLIENT CONTACT
Mark McConnell


 VERSION         AUTHOR                        REVIEWED        APPROVED        DATE
 DRAFT           Jack Landsberg                Cameron Riach   Cameron Riach   27/09/2017
 01              Jack Landsberg                Cameron Riach   Cameron Riach   25/10/2017
 02              Jack Landsberg                Cameron Riach   Cameron Riach   28/05/2018

© Bligh Tanner Pty Ltd May 2018




Bligh Tanner Pty Ltd
ABN 32 061 537 666
Level 9
269 Wickham Street
PO Box 612
Fortitude Valley
Qld 4006 Australia
T +61 7 3251 8555
F +61 7 3251 8599
[email protected]
blightanner.com.au

Page 4

RPS Project Management c/- Lutheran Services                                                                                                              III
PF80 - Cooroy Care Farm
28 May 2018                                                                                                                         Ref. No. 2017.0616




CONTENTS
GLOSSARY ................................................................................................................................................ 4

1        INTRODUCTION .............................................................................................................................. 1

2        THE SITE ......................................................................................................................................... 3

3        STORMWATER MANAGEMENT STRATEGY ............................................................................... 4

4        CONCLUSIONS & RECOMMENDATIONS .................................................................................... 8

5        FUTURE CONSIDERATIONS ......................................................................................................... 9

6        REFERENCES ............................................................................................................................... 10

FIGURES
Figure 1 Locality Plan ................................................................................................................................. 2
Figure 2: Location of Flood Heights Referenced in GHD Hydraulic Analysis ............................................ 6



TABLES
Table 1 Key site information ....................................................................................................................... 1
Table 2 Water Quality Pollutant Targets .................................................................................................... 5



APPENDICES
APPENDIX A             MASTERPLAN .................................................................................................................. 1

APPENDIX B             STAGING PLAN................................................................................................................ 2

APPENDIX C             SURVEY ........................................................................................................................... 3

APPENDIX D             CATCHMENT PLAN ......................................................................................................... 4

Page 5

RPS Project Management c/- Lutheran Services                                                                           IV
PF80 - Cooroy Care Farm
28 May 2018                                                                                           Ref. No. 2017.0616




GLOSSARY
 Term                    Definition

 AEP                     Annual Exceedance Probability

 ARI                     Average Recurrence Interval

                         Area of land that collects rainfall and contributes to surface water (streams, rivers,
 Catchment
                         wetlands) or to groundwater

 groundwater             Sub-surface water in the soil or rock structure

 Ha                      Hectare

                         An impermeable surface where the majority of rainfall becomes runoff by limiting the
 Impervious
                         infiltration of water into the underlying soils

 Infiltration            The movement of water from the ground surface into the underlying soil profile

 QUDM                    Queensland Urban Drainage Manual

                         A water body that may receive runoff from the catchment under consideration, and has
 Receiving water
                         some environmental value or beneficial use.
                         Surface overland flow of water resulting from rainfall or irrigation exceeding the infiltration
 Runoff
                         capacity of the soil
                         Site Based Stormwater Management Plan. A SBSMP shall identify potential on and off-
                         site impacts associated with stormwater for a proposed development. The SBSMP shall
 SBSMP
                         also identify a range of stormwater management strategies and actions for water quality,
                         water quantity, and environmental issues.
 Stormwater runoff       All surface water runoff from rainfall, predominantly in urban catchments

Page 6

RPS Project Management c/- Lutheran Services                                                     Page 1 of 10
PF80 - Cooroy Care Farm
28 May 2018                                                                                Ref. No. 2017.0616




1      INTRODUCTION
       1.1           Background
Bligh Tanner Pty Ltd was commissioned by RPS Project Management c/- Lutheran Services to prepare
this site based stormwater management plan for the proposed Cooroy Care Farm project at 10 & 22
Rose Gum Road and 521 Elm Street, Black Mountain, Cooroy.

The purpose of this site based stormwater management plan is to support a Development Approval
submission. It describes the stormwater strategy for the site and considers erosion and sediment control
and stormwater management (water quality and hydrology).

This stormwater management plan has been prepared in accordance with the requirements for Site
Based Stormwater Management Plans as outlined in the State Planning Policy and Noosa City
Council’s CityPlan.

Key details about the site are listed in Table 1 below.
Table 1 Key site information
 Developer’s name                                  RPS Project Management C/- Lutheran Services
 Engineering Consultant’s name                     Bligh Tanner Consulting Engineers
 Current land use of development site              The site is currently used for low density self-
                                                   sufficient residential purposes.
 Description of site location                      10 & 22 Rose Gum Road and 521 Elm Street,
                                                   Black Mountain, Cooroy Q4563.
 Address                                           Lot size (Noosa IntraMaps)
        10 Rose Gum Rd (Lot 2 on RP862537)                20,044m2
        22 Rose Gum Rd (Lot 3 on SP235191)                201,287m²
        521 Elm St (Lot 1 on RP862537)                    20,045m²
        TOTAL SITE AREA                                   241,376m2
 Coordinates                                       Lat: -26.39452,
                                                   Long: 152.8831

       1.2           Locality Plan
The site is located approximately 4 km due northwest of Cooroy City Centre at 10 & 22 Rose Gum Road
and 521 Elm Street, Black Mountain, Cooroy Q4563. The site fronts on to Elm St and Rose Gum Road.
The eastern side of the site is Yurol State Forest and the west is private property. North of Rose Gum
Road is a railway corridor.

The southern side of the site is bordered by the Bruce Highway. The area proposed for development is
confined by the riparian zone associated with the existing creek through the site.


The site location is shown in Figure 1 below.

Page 7

RPS Project Management c/- Lutheran Services         Page 2 of 10
PF80 - Cooroy Care Farm
28 May 2018                                    Ref. No. 2017.0616




                      SITE LOCATION




Figure 1 Locality Plan

Page 8

RPS Project Management c/- Lutheran Services                                                       Page 3 of 10
PF80 - Cooroy Care Farm
28 May 2018                                                                                  Ref. No. 2017.0616




2      THE SITE
       2.1           Proposed development
RPS, BVN and the design team have developed a masterplan for the Cooroy Care Farm development.
The proposed development consists of a multi staged development for an 80-100 bed facility comprising
of dementia care, transitional care and a respite facility. The current masterplan is included in Appendix
A. The project will be delivered in stages although these are yet to be fully defined. Please refer to
indicative staging in Appendix B.

       2.2           Existing and Surrounding Land Use
The site consists of three large rural lots with small self-sufficient houses. There is a railway corridor to
the north and Bruce Highway to the south, however it is anticipated that the site will not impact either of
these assets.

       2.3           Topography
The site is generally steep with grades mostly between 10-15%. The site is partially located at the crest
of the road and falls to the creek/gully at the rear of the properties. The highest point of the site is 126m
AHD, and falls away to 111m AHD at the back of the site. There is an existing dam with an overflow
spill point in the centre of the site and a further minor gully in the SE corner. Survey of the site is
included in Appendix C.

       2.4           Existing Services
There are currently no existing services on site. Existing lots are self-sufficient

       2.5           Vegetation
The site is mostly clear of undergrowth with larger trees remaining. The majority of vegetation is located
around the existing creek/gullies which run through the site. The proposed development will retain, as
far as practical, existing vegetation.

       2.6           Soils
No information on site soils was available at the time of writing. A detailed geotechnical investigation
would be completed as part of detail design.

       2.7           Flooding
The entry to the site is on a ridgeline and is not subjected to flooding from adjacent lands. The rear of
the building footprint appears to be set back from the creek corridor and outside of the available Noosa
City Council flood mapping extents.

Page 9

RPS Project Management c/- Lutheran Services                                                      Page 4 of 10
PF80 - Cooroy Care Farm
28 May 2018                                                                                 Ref. No. 2017.0616




3      STORMWATER MANAGEMENT STRATEGY
       3.1           Existing Drainage and Legal Point of Discharge
The site forms part of the Lake McDonald catchment.

Dial Before You Dig, Council records (Noosa City Council IntraMaps), survey data and site records
indicate that there is no piped stormwater drainage system through the site. Given there is no potable
water service, the drainage for the existing houses is presumed to be via rainwater tanks before
discharging to the rear of the site.

It is considered that the legal point of discharge of the site is the existing creek at the rear of the site.
Two smaller gullies currently run through the site as per Appendix D and are considered the appropriate
stormwater discharge points. Catchments (at the development boundary) are calculated to be 2.9ha and
0.9ha for the western and eastern gullies respectively.

       3.2           Stormwater Quantity Strategy
It is estimated that the fraction impervious of the site would increase from 5-10% up to 50% after the
proposed development (7.5 ha total development area). This increase would generate an increase of
stormwater runoff discharge from the site. To mitigate the possible adverse impacts created by this
runoff increase, some form of flow control / detention would need to be implemented.

Based on an analysis using the probabilistic rational method (QUDM 2013), the current peak site
discharge under a 1% AEP storm event is estimated to be 3.4 m³/s, and the 20% AEP site discharge is
2.3 m³/s.
The development should ensure that there is no change to these peak flows resulting from increased
impervious surfaces and more efficient drainage systems, however given the site’s location in relation to
the waterway at the rear of the site, the requirement for stormwater detention needs to be explored
further in liaison with the local authorities.
As the architectural and landscape design is still in development at the time of preparing this report, the
detailed design of the stormwater system will occur in due course. It is recommended that water
management be incorporated into the architectural and landscape design, potentially in the form of:
       ▪ Rainwater tanks
       ▪ Permeable pavement/surfaces
       ▪ Landscaping which slows and detains runoff.
       ▪ Integrated water management
The grade and vegetated nature of the site lends itself to use of swales/surface stormwater
management to maximise the amenity and environmental sustainability.

       3.3           Stormwater Quality Strategy
The site is greater than 2500 m² in area. As such, it is above the threshold in the State Planning Policy
(SPP) for requiring compliance with stormwater quality provisions.

There are likely some simple and effective ways that the development might be able to minimise
impacts on stormwater quality while enhancing the amenity of the development, including the use of
permeable paving, using self-watering street trees along the road frontages, and directing roof and
pavement runoff into gardens and landscape areas.

During the detailed design stage, sufficient detail will need to be provided to demonstrate that the
proposed development works comply with the SPP requirements. The pollutant target objectives are
summarised in Table 2 below.

Page 10

RPS Project Management c/- Lutheran Services                                                          Page 5 of 10
PF80 - Cooroy Care Farm
28 May 2018                                                                                     Ref. No. 2017.0616




Table 2       Water Quality Pollutant Targets

 Indicator                               Objective

Total Suspended Solids (TSS)            80% reduction in average annual load of pollutants leaving the
                                        developed unmitigated scenario compared to the developed mitigated
                                        scenario

Total Phosphorus (TP)                   60% reduction in average annual load of pollutants leaving the
                                        developed unmitigated scenario, compared to the developed mitigated
                                        scenario

Total Nitrogen (TN)                     45% reduction in average annual load of pollutants leaving the
                                        developed unmitigated scenario, compared to the developed mitigated
                                        scenario

Gross Pollutant                         90% reduction in average annual load of pollutants leaving the
                                        developed unmitigated scenario, compared to the developed mitigated
                                        scenario


Based on the Deemed to Comply solutions in the State Planning Policy the total area designated for
vegetated stormwater treatment devices would be in the order of 1.5% of the 7.5ha development
(approx. 1,125sqm), although this figure is likely to be considerably reduced through the utilisation the
strategies listed above.

        3.4           Stormwater Harvesting
Stormwater harvesting is anticipated to occur through the use of rainwater tanks and the existing dam.

Rainwater tanks will provide the majority of potable water requirements for the site and the existing dam
is expected to meet the non-potable water needs. The catchment to the existing dam is approximately
1.7ha. Refer to Appendix D for catchment details.

For further details refer to the engineering services report titled, “PF80- Cooroy Care Farm, Water
Supply & Wastewater Servicing dated 25th October 2017”.



        3.5           Bruce Highway Hydraulic Analysis
The Bruce Highway Hydraulic Analysis Report (September 2010) prepared for Department of Transport
and Main Roads by GHD indicates that the Bruce Highway overtops in larger rainfall event with the
possibility to restrict access to the site in the Probable Maximum Precipitation Design Flood (PMPDF).
The key findings of the report relevant to our site are as follows:
    •     The Bruce Highway road shoulder (RL 117.5) will likely overtop to a depth of approximately
          0.6m ( RL 118.07) in the Extreme Event (Probable Maximum Precipitation Design Flood
          PMPDF)
    •     The properties above the highway (along Blueberry Drive) are likely flood affected at RL 113-
          115. There is no mention of downstream properties being affected in the report.
    •     No overtopping of the highway is noted in storms up to the 100yr ARI storms (RL 112.13 max.
          i.e. 5m freeboard below the road shoulder)
    •     There is access in a north direction along the Bruce Highway in all events.

A copy of the GHD Hydraulic Analysis can be provided on request.

Page 11

RPS Project Management c/- Lutheran Services                                                       Page 6 of 10
PF80 - Cooroy Care Farm
28 May 2018                                                                                  Ref. No. 2017.0616




  Figure 2: Location of Flood Heights Referenced in GHD Hydraulic Analysis



       3.6           Overland Flow from Dam
It is anticipated that there will be a requirement for an area above and below the dam to allow for a
swale/channel to convey the overland flows in larger rainfall events. Preliminary calculations show that
these swales would be in the vicinity of 4.5m to 6.0m wide for above and below respectively at a depth
of approximately 350mm.

The Palliative Care Building is currently located within this overland flow path so it is intended that the
existing channel will be required to be diverted away from the building.



       3.7           DRNME Response -Taking or Interfering with Water
The conditions received from DRNME state that the stormwater connections do have the potential to
trigger the requirement for a water licence to be obtained.

Since it is expected that the connection works are minor in nature, they may be able to be undertaken
using the Riverine Protection Permit Exemption Requirements.

This will confirmed during the detailed design stage when the layout and quantity of earthworks/clearing
is further resolved.

Page 12

RPS Project Management c/- Lutheran Services                                                     Page 7 of 10
PF80 - Cooroy Care Farm
28 May 2018                                                                                Ref. No. 2017.0616




       3.8           Erosion and Sediment Control Practices
Stormwater run-off from land development and infrastructure development sites has a high potential to
cause water contamination and/or environmental harm. This is regulated under the EP Act 1994.

Under S440ZG it is an offence to unlawfully deposit a prescribed water contaminant to waters.
Prescribed contaminants are listed in Schedule 9 of the Environmental Protection Regulation 2008 (EP
Reg), and include: ashes, clay, gravel, sediment, stones and similar organic or inorganic matter, as well
as building and construction materials and waste.

Under S 319 persons in Queensland carrying out activities which may cause environmental harm must
comply with the ’general environmental duty’ (GED). This requires that all reasonable and practicable
measures must be adopted to prevent and minimise environmental harm. Although not being able to
demonstrate compliance against GED is not an offence, demonstrating that all reasonable and
practicable measures have been adopted is a defence for offences such as water contamination. For
instance, under chapter 10, s493A of the EP Act, where a person deposits a prescribed water
contaminant to waters or causes unlawful environmental harm, it is a defence to demonstrate
compliance with the GED. Demonstrating that all reasonable and practicable measures have been
conceived and implemented should encompass:
       ▪ thorough and ongoing site assessments
       ▪ consideration of, and adaptation for site specific erosion risk factors including topography, soil
         type, climate and season
       ▪ design, installation, operation, management, maintenance and monitoring of control measures
         as identified in the erosion and sediment control plan.


       3.9           Erosion and Sediment Control Strategy
Erosion and sediment control will be addressed in detail prior to the construction stage. Best
management practices will be adopted and key elements of the erosion and sediment control strategy
will include:

       ▪ Minimising the duration of disturbance
       ▪ Close site supervision and inspection of ESC measures
       ▪ Sediment management using:
         − Filter fences and sediment fences
         − Sediment basins
         − Dust/erosion suppressant polymers
         − Regular use of water truck
         − Controlled stockpile, entry and exit points.

Page 13

RPS Project Management c/- Lutheran Services                                                      Page 8 of 10
PF80 - Cooroy Care Farm
28 May 2018                                                                                 Ref. No. 2017.0616




4      CONCLUSIONS & RECOMMENDATIONS
       ▪ The development site is not affected by flooding from any source however there are several
         existing overland flow paths which run through the site.
       ▪ The Bruce Highway Hydraulic Analysis prepared by GHD for DTMR indicates that the highway
         has safe egress in all rainfall events up to the 1% AEP with overtopping only expected in the
         PMPDF. In the event of this extremely rare flooding safe egress is available along the Bruce
         Highway in a northerly direction.
       ▪ The Legal Point of Discharge for the Site is to the existing creek/gully at the rear of the site
       ▪ Stormwater quality management is proposed, given the site is above the 2500 m 2 threshold in
         the State Planning Policy SPP Code: Water Quality.
       ▪ The development would need to implement a flow control / detention strategy to mitigate the
         possible runoff increase generated by the works.
       ▪ A detailed Erosion and Sediment Control Plan would be required to be implemented for
         construction.
       ▪ The vegetated and sloping nature of the site suggests the use of swales to maximize amenity
         and environmental sustainability

Page 14

RPS Project Management c/- Lutheran Services                                                    Page 9 of 10
PF80 - Cooroy Care Farm
28 May 2018                                                                               Ref. No. 2017.0616




5      FUTURE CONSIDERATIONS
Once the landscape and architectural plans are further resolved, the next steps to progress the
stormwater strategy are to consider the following items (addressed at a high level in this report) in more
detail:

       ▪ Determine preferred discharge points
       ▪ Assess catchments
       ▪ Assess areas for stormwater reuse/harvesting
       ▪ Calculate stormwater detention volume requirements
       ▪ Calculate stormwater treatment requirements
       ▪ Complete preliminary design of stormwater network

Page 15

RPS Project Management c/- Lutheran Services                                               Page 10 of 10
PF80 - Cooroy Care Farm
28 May 2018                                                                           Ref. No. 2017.0616




6      REFERENCES
Department of Environment and Resource Management (2013), Queensland Urban Drainage Manual

Department of Transport and Main Roads, Bruce Highway (Cooroy to Curra) Upgrade Hydraulic
Analysis Report (September 2010) prepared by GHD

International Erosion Control Association (IECA) Best Practice Erosion and Sediment Control

Noosa Plan (2017), Noosa City Council

State Planning Policy July 2017 (QLD)

Page 16

RPS Project Management c/- Lutheran Services          Page 1 of 5
PF80 - Cooroy Care Farm
28 May 2018                                    Ref. No. 2017.0616




       APPENDIX A
       MASTERPLAN

Page 17

                                                                                                           KEY
                                                                                                           1.          Central courtyard with chapel and hall
                                                                                                           2.          Palliative Care
                                                                                                           3.          Day Respite
                                                                                                           4.          Respite Care
                                                                                                           5.          Central Services
                                                                                                           6.          Dementia House
                                                                                                           7.          Chapel                                                                                           Telephone +61 7 3852 2525
                                                                                                                                                                                                                        Facsimile +61 7 3852 2544
                                                                                                           8.          Community Hall                                                                                   www.bvn.com.au
                                                                                                           9.          Nature Study Centre
                                                                                                           10.         Substation
                                                                                                           11.         Grounds Service Store
                                                                                                           12.         Fire Tanks/Pump Room                                                                             INTELLECTUAL PROPERTY
                                                                                                                                                                                                                        COPYRIGHT BVN ARCHITECTURE PTY LIMITED. UNLESS OTHERWISE
                                                                                                           13.         Caretaker's Residence / Existing Bldg                                                            AGREED IN WRITING;ALL RIGHTS TO THIS DOCUMENT ARE SUBJECT TO
                                                                                                                                                                                                                        PAYMENT IN FULL OF ALL BVN CHARGES;THIS DOCUMENT MAY ONLY
                                                                                                           14.         Aviary                                                                                           BE USED FOR THE EXPRESS PURPOSE AND PROJECT FOR WHICH IT
                                                                                                                                                                                                                        HAS BEEN CREATED AND DELIVERED, AS NOTIFIED IN WRITING BY
                                                                                                           15.         Kitchen Gardens                                                                                  BVN;AND THIS DOCUMENT MAY NOT BE OTHERWISE USED, OR COPIED.
                                                                                                                                                                                                                        ANY UNAUTHORISED USE OF THIS DOCUMENT IS AT THE USER'S SOLE
                                                                                                           16.         Flower Garden                                                                                    RISK AND WITHOUT LIMITING BVN'S RIGHTS THE USER RELEASES AND
                                                                                                                                                                                                                        INDEMNIFIES BVN FROM AND AGAINST ALL LOSS SO ARISING.
                                                                                                           17.         Animal Yard
                                                                                                           18.         Stable                                                                                           NOTE
                                                                                                                                                                                                                        CONTRACTOR TO CHECK AND VERIFY ALL DIMENSIONS ON SITE PRIOR
                                                                                                           19.         Chicken Pen                                                                                      TO COMMENCEMENT OF WORK OR PREPARATION OF SHOP DRAWINGS.
                                                                                                                                                                                                                        DO NOT SCALE THIS DRAWING
                                                                                                           20.         Fire Pit
                                                                                                                                                                                                                            ISSUE     DATE                      FOR

                                10
              3


                                                   5
                                          19
          2                18        17                    5


                  16
                       4                                                         6
12   13
                                               7
                                                       1

                                                               8
                                                                        15
                                                                                          6


                                                                             6
                                                                   20                                                                                                                                                   CONSULTANT

                                                                                                                                                                                                                        -
                                                                                                  6                                                                                                                     -
                                                                                                                                                                                                                        CONSULTANT

                                                                                                                                                                                                                        -
                                                                                     6                                                                                                                                  -
                                                                                                                                                                                                                        CONSULTANT

                                                                                                                                                                                                                        -
                                                                                                      11                                                                                                                -
                                                                                                                                                                                                                        CONSULTANT
                                                                                         15                                                                                                                             -
9
                                                                                                                                                                                                                        -
                                                                                              6                                                                                                                         PROJECT MANAGER

                                                                                                                                                                                                                        -
                                                                                                                                                                                                                        -
                                                                                                                                                                                                                        CLIENT




                                                                                                                                                                                                                        LUTHERAN SERVICES
                                                                                                                                                                                                                        CLIENT NUMBER


                                                                                                                                                                                                                        1701009
                                                                                                                                                                                                                        PROJECT




                                                                                                                                                                                                                        BIOSPHERIC CARE FARM COMMUNITY
                                                                                                                                                                                                                        BLACK MOUNTAIN, COOROY
                                                                                                                                                                                                                        BVN PROJECT NUMBER


                                                                                                                                                                                                                        1701009
                                                                                                                                                                                                                        DRAWING KEY




                                                                                                                                                                                                                        TRUE NORTH                     PROJECT NORTH




                                                                                                                                                                                                                        GRAPHIC SCALE


                                                                                                                                                                                                                             0                2000                          5000
                                                                                                                                                                                                                        SCALE


                                                                                                                                                                                                                        1 : 1000@A1
                                                                                                                                                                                                                        STATUS


                                                                                                                                                                                                                        PD
                                                                                                                                                                                                                        DRAWING




                                                                                                                                                                                                                        SITE PLAN
                                                                                                                                                                                                                                                                      ISSUE


                                                                                                                                                                                                                        AR-A-XX-03
                                                                                                                 C:\REVIT_LOCAL2017\1701009_Care Farm_Site File_Masterplan_2017_bhdoherty.rvt   24/04/2018 9:48:58 AM

Page 18

RPS Project Management c/- Lutheran Services          Page 2 of 5
PF80 - Cooroy Care Farm
28 May 2018                                    Ref. No. 2017.0616




       APPENDIX B
       STAGING PLAN

Page 19

                                                                                                                         Rose Gum Road




                                                                                                                                                                                              Ro
                                                                                                                                                                                                                                                                           LEGEND




                                                                                                                                                                                               se
                                                                                et                                                                                                                                                                                         1.   Central courtyard with
                                                                           tr e




                                                                                                                                                                                                   Gu
                                                                          S          Palliative Care                                                                                                                                Tr                                          chapel and hall
                                                                                     overlooking the




                                                                                                                                                                                                    m
                                                                    Elm              dam                                                                                                                                               a      in                           2.   Palliative Care




                                                                                                                                                                                                        Ro
                                                                                                         Respite Care in a
                                                                                                         farm and garden                                                                                                                           Lin




                                                                                                                                                                                                         ad
                                                                                                         environment                                                Central Services                                                                    e                  3.   Day Resite
                                                                                                                                                                    Building located
                                                                                                                                                                    at the entry to the                                                                                    4.   Respite Care
                                                                                                                                                                    site
                                                                                                                                                  10                                                                                                                       5.   Central Services
                                                                                                            3                                                                                                                                                              6.   Dementia House
                                                                                                                                                          5 1                                                                                                              7.   Chapel
                                                                                       2                                               7                STAGE
                                                                                                                                                                                                                                                                           8.   Community Hall
                                                                                                                                                                                                            Dementia Care in
                                                                         10                                9                                                        10                                      a farm and garden                                              9.   Nature Study Centre
                                                                                                                                                                                                            environment
                                                                                                                                      10                                                                                                                                   10. Garden/Farm Zone
                                                                                                                             4                                  8                                                                                                          11. Cottages for Artisans and
                                                                                                                                                    1                                6
                                                                               16                                                                                                                                                                                              Artists in residents
              Cottages for
                                                     12                                            13                                                                                                   6                                                                  12. Cottages for single older
              disadvantaged                                                                                                                                                                                                                                                    women
              groups located
              around the dam
                                                                                                                                 11                                                                                                                                        13. Cottages for victims of
              and overlooking
              riparian zone                                             STAGE 3 13                                                                                                                 10                                                                          domestic violence
                                                                                                                                                                6                 10
                                                                                                                                                                                                                                                                           14. Cottages for volunteers
                                                                                                                                                                                                                        6                                                  15. Cottages for student
                                         11                                                                                                             14                                                                                                                     nurses
                                                                                                                                                                                          6                                                                                16. Upper Dam
                                                             11    10                                                                                                                                                                                                      17. Lower Dam
                                                                                                                                  Cottages for                                                                STAGE 2
                                                                                                                                  volunteers and
                                                                                                                                  support staff near                6                                        6                                                                   0    5        20   40
                                                                                                                                  the care facilities
                                                                                                                                                                                                                                        10                                       1:0000 @ A1


                                    11                                                                  Lot 2
                                                                                           t 1                                                                                                          10
                                                                                       L o                                                                                                     15                     9
                                                        ne                                                                                                                                                                                                   Nature Study
                                                 n   Zo                                                                                                                                                                                                      Centre located
                                                                                                                                                                                                                                                             adjacent to the
                                                a
                                            ari                                                                                                                                                                                                              forest and the
                                         Rip                                                                                                                                                                                                                 riparian zone

                                                                                                                                                                                                                                        9
                                                                                                                                                                                                                                                                               Yurol State Forest


Br
  uce
        HW                Lot
          Y                     3
                                                              17




                                                                                                                                                                                                                                                                                                           COOROY CARE FARM – 18 SEPTEMBER 2017
                                                                                                                                                                                                                                0   5              20       40
                                                                                                                                                                                                                                                                    CONCEPT MASTERPLAN
                                                                                                                                                                                                                                1:0000 @ A1
                                                                                                                                                                                                                                                                                     COOROY CARE FARM

Page 20

RPS Project Management c/- Lutheran Services          Page 3 of 5
PF80 - Cooroy Care Farm
28 May 2018                                    Ref. No. 2017.0616




       APPENDIX C
       SURVEY

Page 21

 

 

SP267294

Symbol Legend

 

 

@ Bench Mark

® Control Station
Setout Point

ow Water Meter

>< Water Valve

e Water marker

« Water tap

* Irrigation Sprinkler

* Irrigation elbow

5 Irrigation joiner

@ Irrigation valve

= Fire Hydrant
Stormwater manhole triangular
Stormwater manhole square
Stormwater manhole round
Rain water outlet

0 Grid Inlet

Sewer manhole triangular
Sewer manhole square
Sewer manhole round
Electrical Pit

Power Box

Light Pole

Power Pole

Telstra Pit
Telstra Pillar
Cable Marker
Comms Pit
Fibre Optic Pit
Gate

Sign Post
Bollard

owan

se-40G]

a4

Tree and trunk (symbol indicates size)

 

 

Line Legend

 

 

= = Kerb back, invert and lip

 

 

Powerline

 

\———_ Fence line

Edge of vegetation
Top of bank

Edge of building
Major contour 1.0m

Minor contour 0.25m
Sewer Line

 

wv Water line

TEL —— Telecomms line
Gas line

 

Stormwater line

 

 

 

 

 

 

FTY1935

A

 

0161-01

 

Black Mountain
Lots 1 and on RP862537 and Lot 3 on SP235191

PASSED

Contour Detail Survey
10 and 20 Rose Gum Road and 521 Elm Street
DATE 14/07/2017

 

OF 6

SHEET 1

‘SH craving skneture bg

 

oA
WWW plansur com.au

4 Laurel Court
Mount Cotton

QLD 4165

ansur.com.au

|
O07 3325 9755

ABN 61 612 831 017

admin@

PLANSUR PTY LTD

Email:
Ph:

 

 

 

15m

Om

Coordinates system is Plane MGA

Coordinate Origin is PM112484
488469.670 E 7080850.424 N Zone 56

Coordinates extended on a plane
at Scale Factor 1.0003845871

 

 

DRAWN
CHECKED

 

AHD Der

48480

 

LOCATION:Elm Street Railway Bridge
AZIMUTH: Plane MGA see note

SURVEYOR: JVR_ and PK

REDUCED LEVEL: 123.589
FIELD BOOK

LEVEL DATUM:
REF BM No:

 

 

 

 

 

 

LEVEL BOOK

 

 

NOTES

 

CCAD REF: 0161-01

CCAD-REF?

ACAD REF: 0161—01

DESCRIP TION

 

DATE

 

 

 

 

 

 

 

 

 

REV| BY

 

 

SNOISIAS&

 

 

Page 22

RPS Project Management c/- Lutheran Services          Page 4 of 5
PF80 - Cooroy Care Farm
28 May 2018                                    Ref. No. 2017.0616




       APPENDIX D
       CATCHMENT PLAN

Page 23

 

BLIGH
TANNER

LEVEL 9, 269 WICKHAM STREET, PO BOX 612
FORTITUDE VALLEY QLO 4006 AUSTRALIA
7073257 8555 F 07 3251 8599

 

ALL RIGHTS RESERVED. THIS WORK IS COPYRIGHT AND.
CANNOT BE REPRODUCED IN ANY FORM OR BY ANY
IMEANS (GRAPHIC, ELECTRICAL OR MECHANICAL,
|ICLUDING PHOTOCOPYING) WITHOUT THE WRITTEN

  
   
 
  
 
 
 
 
 
 
 

KEY PERMISSICN OF BLIGH TANNER. ANY LICENCE, EXPRESS
|OR IMPLIED, TO USE THIS DOCUMENT FOR ANY PURPOSE
‘0.
WHATSOEVER IS RESTRICTED TO THE TERMS OF
Se Z 1 Central cour AGREEMENT OR IMPLIEO AGREENENT BETWEEN BLIGH
wae Z 2 Palliative Ca TANNER AND THE INSTRUCTING PARTY
= ‘ 3 DayRespite
Ag 4 Respite Can NOTE
& CF 5 Central Serv 1, THIS DRAWING TO BE READ IN CONJUNCTION WITH
ay Zp & Dementia Hc STANDARD NOTES ON C010 AND STANDARD
S\ \ so
Sg AT ZZ 7. Chapel DRAWINGS AS SHOWN CN C000
BS Ke %& Ng Sa as See A, & — Communty! 2 THIS DRAWING TO BE READ IN CONJUNCTION WITH
ae Ss bn) Wins Neo Nein ‘ ee FE 9 Nature Stud) ALL OTHER CONSULTANTS DRAWINGS
pe ‘\_ AVAILABLE CONTOUR DATA APPEARS. a 10. Substation
TO SHOW CATCHMENT NORTH OF ELM Y b "1 Grounds Ser
STREET DISCHARGING AWAY FROM 12. Fite Tanks/P
SITE. TO BE CONFIRMED ON SITE 13. Caretaker’s |
|—_t 14. Aviary
15. Kitchen Garc
a ) 16. Flower Gard
z 47. Animal Yard
si / 18. Stable
/ 19. Chicken Per
eZ . Fire Pit

 

 

 

 

 

 

  

 

 

   

 

        

 

      

 

     

 

         

 

     

 

 

 

 

 

 

 

 

 

 
  

    
 

 
  

 

 

1:1000 @A1
IREV |DATE |DESCRIPTION JOR |APPD/RPEQ|
A 25-10-17 |FOR INFORMATION JL [CR
> iB 28-05-18 | FOR INFORMATION JL |CR
a
862533 TOTAL SITE
_ <
pays a SS S tiation SS
a] 1 =. (1.4ha EXTERNAL
K, CATCHMENT 2.9har® : ~ SSS OARS )
i S ;
: 68s. Lutheran
e:* Services
There for you

 

 

 

PROJECT

CCOROY CARE FARM
DEVELOPMENT

 

 

TOCATION

10 & 22 ROSE GUM RD AND 521
ELM ST, BLACK MTN, COOROY

 

 

 

 

BVN
DRAWING TITLE
CATCHMENT PLAN
JOB NO:
2017.0616

($$$ $$

$kK001 A

 

 

 

 

Page 24

     RPS Project Management c/- Lutheran Services          Page 5 of 5
     PF80 - Cooroy Care Farm
     28 May 2018                                    Ref. No. 2017.0616




Level 9, 269 Wickham St
PO Box 612 Fortitude Valley
|QLD 4006, Australia

T +61 7 3251 8555
F +61 7 3251 8599
[email protected]
www.blightanner.com.au

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.