Original source · versioned page text
ZERO EMISSIONS NOOSA (ZEN) Inc. ALLIANCE AGREEMENT · Attachment 2 2026-27 ZEN E Operational Plan
4. Solar for strata
Also in business section
Engage bodies corporate to Team Body Ongoing as # body corporates 1.1.1; 1.1.2; Theme 2: Energy
install solar systems to: Corporate; opportuniti Colin, Ewan inquired/engaged 1.1.3; 1.1.4; efficiency and
a. Reduce their energy costs & Tourism es arise renewable
hence bodies corporate fees Noosa; July, 2026 – energy
# body corporates installed
b. Make them moré resilient individual June, 2027 2.1 & 1.5
bodies solar in common area
after severe weather Theme 3: Clean
corporate
events/power outages & low
c. Reduce their emissions. emissions
industries
Note: also investigate if Solar 3.1 & 3.2
Theme 7:
can be a revenue stream for
Resilient &
their sinking fund. adaptive
communities &
built
environments
7.1 & 7.2
Outcomes &
Benefits 1 & 2
5. Data Dash Board
a. To track Noosa Shire Sunspot data Ongoing. Josh STRATEGIES As above
community uptake of # solar installations per 1.1.1; 1.1.3;
renewable energy (solar) month in Noosa Shire 1.1.6
b.To monitor and analyse use
of renewable energy across the
Noosa Shire community
Note: This data is being
provided to and shared by
Noosa Council on their website
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment 2 2026-27 ZEN E Operational Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.