Council archive · source document
Decision Notice (Preliminary Approval) - 010.2009.00000768.001 [As Published] · 132008.1867
2009/768
ii. Revised by an RPEQ or CPESC to address the issues raised by changes in the
projected construction schedule and methods,
iii. Revised to address predicted rainfall events, and
iv. Achieve the desired environmental outcomes.
Council’s CEO may request further controls to be installed should approved measures be
inefficient.
22. Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement
of satisfactory “As Constructed” records shall be submitted to Council.
As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
(RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre and the location,
level and type of all services and structures. This information shall be submitted to Council for
checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in
the Asset Design and As Constructed (ADAC) digital format. Guidelines on the use of ADAC
are available at www.adac.com.au and Council’s “Planning Scheme Policy 5 – Engineering
Design Standards – Roads, Drainage and Earthworks”.
Approval of works shall not be granted until all As Constructed information has been supplied
and accepted by Council.
23. A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will
be imposed on construction works during the maintenance period, which is a minimum period
of 12 months duration. Such bond must be lodged by, and shall only be accepted from the
Developer for the works.
24. The works to become Council assets will not be accepted "On Maintenance" until the
landscaping is completed.
25. These works are also to be in compliance with the relevant conditions of Development Permit
No. 2008/1867.
26. Notwithstanding that Council has checked the plans with due care, where it is found during
construction that variations from Council's standards exist, then Council standards shall apply.
5 REFERRAL AGENCY CONDITIONS
Not Applicable.
6 APPROVED PLANS
The approved plans for this development approval are listed in the following table:
Plan No. Rev. Plan Name Date
K1595- R001 B Roadworks Plan by Knobel Consulting 2 June 2009
K1595-R002 B Notes and Sewer Detail by Knobel Consulting 2 June 2009
K1595-SE001 A Erosion & Sediment Control Plan by Knobel Consulting 2 June 2009
K1595-SW001 A Stormwater Drainage Plan by Knobel Consulting 2 June 2009
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
Page 4 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice (Preliminary Approval) - 010.2009.00000768.001 [As Published]Related documentApplication case desk ↗
Decision Notice (Preliminary Approval) - 010.2009.00000768.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 60 KB (small file)
- File type
No other editions are linked here.