Council Decision - Minor Change - 51901 3614 03 [As Published] · 51901.3614.03

of 10

Text shows just the words. Original shows the document exactly as it was published.

                                                                                 Officer:            Nadine Gorton
                                                                                 Direct Telephone:   07 5329 6215
                                                                                 Our Reference:      51901.3614.03
                                                                                 Your Reference:     19254

               22 February 2024


               Body Corporate - Netanya Noosa CTS 17658
               C/- Project Urban
               PO Box 6380
               MAROOCHYDORE QLD 4558

               [email protected]
               [email protected]



               Dear Sir/Madam,
                                            Decision Notice – Minor Change
                                                         Planning Act 2016

               I refer to your application received on 17 December 2021, requesting a minor change to an existing
               development approval. Council decided your requested changes.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              51901.3614.03

                   Street address:              Netanya 71 Hastings Street, Noosa Heads

                   Real property description:   BUP 101500

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               The following type of approval was issued on 19 and 20 December 1979.
               •       Town Planning Consent - 29 Motel Units, 3 Shops and 2 Restaurants
               In relation to the request to make a minor change to the existing approval, Council on 15 February
               2024, decided to approve the requested changes. The changes are detailed below.
               A.      Approve the change;
               B.      Amend conditions 2, 15, 16 and 18;
               C.      Included additional conditions 19, 20, 21, 22, 23 and 24; and
               D.      Agree to enter into an Infrastructure Agreement.
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.




               ABN 97.969.214.121                                                               PO Box 141
               noosa.qld.gov.au                                                          Tewantin QLD 4565
               [email protected]                                                          07 5329 6500
                                                                                                           Page 1 of 10
Document Set ID: 22818768
Version: 5, Version Date: 23/02/2024
Full text of the other 9 pages

Page 2

               4.     ASSESSMENT MANAGER CONDITIONS

               51901.3614 Conditions – 19 and 20 December 1979
               a.     The development is approved in accordance with the plan of layout submitted for a building
                      to contain 29 sole occupancy accommodation units, three shops and two restaurants on the
                      land described.
               b.     Prior to the issue of any building approvals and conditional upon the granting for this consent,
                      a request to revoke the previous approval covered by Council’s file T.P.C 762 and permitting
                      the development by the erection of 29 multiple dwelling units, a restaurant, 4 shops and 2
                      offices on the described land is to be made by the owners in writing to the Shire Clerk.
               c.     The percentage of the sites covered by the building is to be in accordance with part 3 of the
                      Town Plan Schedule and in this regard, it is not accepted that the access balconies nor the
                      landscaped podium are over the access driveway, can be excluded from calculation of sit
                      cover. The plan is to be modified to comply with this requirement prior to the issue of any
                      building permit.
               d.     The proposed restaurant is to e repositioned to the northwest corner of the building as
                      agreed, provided that this condition could be relinquished in the event of withdrawal of an
                      objection by the proprietors of Los Nidos Motel lodged in this regard.
               e.     Car parking is to be provided on site for 36 vehicles and not less than 29 of such car parks
                      area to be covered. The arears on which vehicles will be driven and/or parked, are to be
                      provided with the suitably surfaced pavement properly constructed and maintained to good
                      engineering standards to the satisfaction of the Council’s Engineer. Plans specifications for
                      such areas including footpath crossings are to be submitted prior to the issue of a building
                      permit. Vehicular access to and from the site is to be designed so as to ensure that sufficient
                      ar3ea is available for manoeuvring and turning to permit forward movement to and from the
                      adjacent road. Access is to be constructed to the satisfaction of the Council’s Engineer.
               f.     Connection to Council’s sewerage system
               g.     Connection to Council’s water supply facilities.
               h.     Stormwater to be collected on site wand disposed of to the existing drainage in from of the
                      proposed development in Hastings Street. Access ways to be grated at property boundaries
                      and connected to stormwater drainage.
               i.     No earthworks or filling are to be carried out on the site until the requirements of the Council’s
                      Engineer have been obtained in writing. Such requirements to be obtained prior to the issue
                      of a building permit.
               j.     Comply with the reasonable requirements of the Regional Fire Safety Officer.
               k.     The approval given herein is for Town Plan consent only and does not imply either the issue
                      of a building permit or Council consent to an application under the Group Titles Act of Building
                      Unit Titles Act.
               l.     This approval will lapse if not availed of within two years in accordance with Clause 3 (2) of
                      Part II of council by -laws, Town Planning.
               m.     A certificate of alignment is to be submitted with application building permit and/or and
                      identification survey to be carried out by an authorised surveyor at the time of the foundation
                      inspection. To ensure compliance with any and all conditions of this approval, the council
                      will require that a bank bond to be lodged to guarantee performance. The value of such
                      bond will be $15,000 and shall be lodged prior to the issue of a building permit and any costs
                      incidental thereto, will become the responsibility of the applicant.
               n.     The conditions of this consent are to be completed prior to occupancy of the building and if
                      this is not done, the Council reserves the right to call on bond moneys lodged to carry out
                      the works involved.




                                                                                                         Page 2 of 10
Document Set ID: 22818768
Version: 5, Version Date: 23/02/2024

Page 3

               Additional conditions – 15 October 2020
               Approved Plans
               2.     Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed in the table below, except where required to be amended by the
                      conditions of this approval. The plans must be amended to incorporate the amendments
                      listed in the table below and resubmitted to Council prior to the issue of any Development
                      Permit for Operational Works.

                        Plan No.       Rev Plan Name – Prepared by                               Date

                        19021          E    Cover Sheet, prepared by Sprout Architects           5/08/2020
                        SD00.00

                        19021          E    Locality & Register, prepared by Sprout Architects   5/08/2020
                        SD00.01

                        19021          E    New Works - First Floor Site Plan, prepared by 5/08/2020
                                            Sprout Architects
                        SD10.01

                        19021          E    New Works - Second Floor Site Plan, prepared by 5/08/2020
                                            Sprout Architects
                        SD10.02

                        19021          E    New Works - Third Floor Site Plan, prepared by 5/08/2020
                                            Sprout Architects
                        SD10.03

                        19021          E    New Works – Fourth Floor Site Plan, prepared by 5/08/2020
                                            Sprout Architects
                        SD10.04

                        19021          I    New Works – Ground Floor, prepared by Sprout 6/10/2020
                                            Architects
                        SD20.00

                        19021          E    New Works – First Floor, prepared by Sprout 5/08/2020
                                            Architects
                        SD20.01

                        19021          E    New Works – Second Floor, prepared by Sprout 5/08/2020
                                            Architects
                        SD20.02

                        19021          E    New Works – Third Floor, prepared by Sprout 5/08/2020
                                            Architects
                        SD20.03

                        19021          E    New Works – Roof Terrace, prepared by Sprout 5/08/2020
                                            Architects
                        SD20.04
                                            As annotated by Council

                        19021          E    New Works – Elevations, prepared by Sprout 5/08/2020
                                            Architects
                        SD30.00

                        19021          E    New Works – Elevations, prepared by Sprout 5/08/2020
                                            Architects
                        SD30.01




                                                                                                    Page 3 of 10
Document Set ID: 22818768
Version: 5, Version Date: 23/02/2024

Page 4

                        Plan No.       Rev Plan Name – Prepared by                              Date

                        19021          E    New Works – Sections, prepared by Sprout 5/08/2020
                                            Architects
                        SD30.02

                        19021          D    New Works – Section, prepared by Sprout Architects 5/08/2020
                        SD30.03

                        19021          E    Detailed Area – South-west Tenancies / Refuse 5/08/2020
                                            Area, prepared by Sprout Architects
                        SD60.00

                        19021          E    Detailed Area – Forecourt / Café, prepared by Sprout 5/08/2020
                                            Architects
                        SD60.01

                        19021          E    Detailed Area – Forecourt / Café, prepared by Sprout 5/08/2020
                                            Architects
                        SD60.02

                        19021          E    Detailed Area – Covered Seat / Unit Awning, 5/08/2020
                                            prepared by Sprout Architects
                        SD60.03

                        19021          E    Detailed Area – Pool Terrace / Rear Entry, prepared 5/08/2020
                                            by Sprout Architects
                        SD60.04

                        19021          E    Detailed Area – Pool Terrace / Rear Entry, prepared 5/08/2020
                                            by Sprout Architects
                        SD60.05

                        19021          E    Detailed Area – Roof Terrace / Feature Awning, 5/08/2020
                                            prepared by Sprout Architects
                        SD60.06
                                            As annotated by Council

                        19021          E    Detailed Area – Stair / Lift Extensions, prepared by 5/08/2020
                                            Sprout Architects
                        SD60.07

                        19021          E    Detailed Area – ‘Sails’ Entry / Park Road Frontage, 5/08/2020
                                            prepared by Sprout Architects
                        SD60.08

                        19021          E    Detailed Area – ‘Sails’ Entry / Park Road Frontage, 5/08/2020
                                            prepared by Sprout Architects
                        SD60.09

                        19021          E    Landscaping Areas – Existing Conditions, prepared 5/08/2020
                                            by Sprout Architects
                        SD80.00

                        19021          E     Landscaping Areas – New Works, prepared by 5/08/2020
                                             Sprout Architects
                        SD80.01

                        19021          E     Site Cover – Existing Conditions / New Works, 5/08/2020
                                             prepared by Sprout Architects
                        SD80.02




                                                                                                    Page 4 of 10
Document Set ID: 22818768
Version: 5, Version Date: 23/02/2024

Page 5

                        Plan No.       Rev Plan Name – Prepared by                                 Date

                        19021          E     GFA Areas – Existing Conditions / New Works, 5/08/2020
                                             prepared by Sprout Architects
                        SD80.03

                        Approved Plan dated 15 February 2024
                                       Rev   Plan Name – Prepared by                                Date
                        Plan No.

                        SD30.02        N     Sections, prepared by Sprout Architects                29/11/2022

                      The following plans require amendment.

                        Plan No.              Rev.   Plan/Document Name                             Date

                        SD20.00               Q      Prepared by Spout Architects - New Works 29.11.2022
                                                     Ground Floor

                        SD20.01               N      Prepared by Spout Architects - New Works 29.11.2022
                                                     First Floor

                        SD30.00               L      Prepared by Spout Architects - New Works 29.11.2022
                                                     Elevations

                        SD30.01               L      Prepared by Spout Architects - New Works 29.11.2022
                                                     Elevations

                        SD60.10               D      Prepared by Spout Architects - Detailed 29.11.2022
                                                     area – stage 2 – tenancies 3,4 & 5

                        SD60.11               B      Detailed Area – Stage 2 – Tenancies 3, 4 29.11.2022
                                                     and 5 (Perspectives)

                        Amendments            The new feature awnings are to be setback a minimum of 2 metres from
                                              the Park Road frontage. All timber batten screens and support posts are
                                              to be setback a minimum of 2 metres from all street frontages.
                                              The bulk of the new feature awnings and associated pillars/batten
                                              screens to be reduced by:
                                                  • Lessening the thickness of the feature awnings and pillar/batten
                                                     screens, including the use of lightweight building materials.
                                                  • The feature awnings and pillars/batten screens must be made of
                                                     light-coloured   materials   that   complement   the   beachside
                                                     character.

                      Performance Bond
               3.     Security in the form of a cash bond or trading bank guarantee to the sum of $25,000 must
                      be submitted to Council, to secure performance of all conditions of this approval, prior to the
                      issue of a Development Permit for Building Works. The cash bond or trading bank guarantee
                      will be returned on performance of the conditions of approval less any costs incurred by
                      Council in respect of enforcing performance of this permit. Council reserves the right to call
                      upon the bond or guaranteed sum to effect compliance with conditions.
                      Nature and Extent of Approved Use
               4.     The roofed outdoor dining area associated with Lot 7 (The Providore) must remain
                      unenclosed and is limited to a maximum of 56m2 use area.


                                                                                                        Page 5 of 10
Document Set ID: 22818768
Version: 5, Version Date: 23/02/2024

Page 6

               5.     No structures are approved by this development approval within The Parade, on public land.
                      Roof Terrace Pergolas
               6.     Pergolas on the roof terraces must be:
                      a.      setback in line with the existing roof exhaust ducts for each unit’s roof terrace;
                      b.      a maximum of 9m2 in area; and
                      c.      a maximum of 2.5m in height but not exceeding the proposed roof exhaust ducts
                              structure height as shown on the Approved Plans.
                      Landscaping
               7.     The development site must be landscaped. The works must be undertaken in accordance
                      with an Operational Works approval and the Noosa Plan for that specific area and must
                      include in particular:
                      a.      a minimum of one of the existing palm trees located on the western side of the driveway
                              is to be retained;
                      b.      existing established trees located in the landscaped planter in the south western corner
                              of the site (in front of the Bellissima Boutique) must be retained;
                      c.      provision of one additional established tree, behind the curved timber seat within the
                              landscaped planter in the south western corner of the site (in front of the Bellissima
                              Boutique). Species is to be in accordance with the Local Planning Scheme Policy
                              Landscaping Plants & Guidelines, l;
                      d.      paving proposed in the existing forecourt in the south east of the site must blend with
                              the existing surrounding surface finishes;
                      e.      planting proposed on the timber trellis on the north eastern boundary is to be in
                              accordance with the Local Planning Scheme Policy.
               8.     The public land fronting The Parade must be landscaped. The works must be undertaken in
                      accordance with an Operational Works approval and Planning Scheme Policy Landscaping
                      Plants & Guidelines suitable for the locality and further request that the BBQ and unapproved
                      fencing be removed from public land as part of the works undertaken pursuant to this
                      approval.
               9.     Trees to be retained must be protected from clearing or construction activities by:
                      a.      clearly marking vegetation to be retained with flagging tape
                      b.      installing protective fencing around the drip line of the vegetation
                      c.      restricting stockpiling, storage and vehicle parking to those areas which are already
                              cleared
                      d.      using low impact construction techniques around vegetation.
               10.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
               11.    All landscape works must be maintained generally in accordance with the approved design
                      for the life of the development.
                      Damage to infrastructure
               12.    Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
                      bridges or roadways must be repaired or reinstated to at least pre-existing conditions.
               13.    Where damage occurs to any Council asset as a result of the landscaping works, the damage
                      must be repaired immediately where it creates a hazard that presents risk to person or
                      property. Non-hazardous damage must be repaired prior to completion of works.


                                                                                                          Page 6 of 10
Document Set ID: 22818768
Version: 5, Version Date: 23/02/2024

Page 7

                      Car Parking
               14.    The applicant must comply with the requirements of any Infrastructure Agreement entered
                      into with the Council with respect to the payment of car parking contributions in relation to
                      the proposed development. In the event that the Infrastructure Agreement does not apply a
                      minimum of 42 car parking space must be provided and marked on the site and made
                      available and accessible at all times while the use is open for business.
               15.    A minimum of 38 car parking spaces must be provided on the site in accordance with
                      approved plans; made available and accessible at all times while the use is open for
                      business.
               16.    The new (or modified) car parking spaces must comply with AS/NZS2890.1:2004 Parking
                      Facilities -Part 1: Off-street car parking.
               17.    All car parking areas and access driveway must be maintained exclusively for vehicle parking
                      and manoeuvring and kept in a tidy and safe condition at all times.
               18.    Certification by a suitably qualified person for the new (or modified) car parking spaces is to
                      be submitted to Council upon the completion of works and prior to issuing the Certificate of
                      Classification to confirm compliance with the conditions of this permit.
               Additional conditions – 15 February 2024
                      Performance Bond
               19.    Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must
                      be submitted to Council, to secure performance of all conditions of this approval, prior to the
                      issue of a Development Permit for Building Works. The cash bond or trading bank guarantee
                      will be returned on performance of the conditions of approval less any costs incurred by
                      Council in respect of enforcing performance of this permit. Council reserves the right to call
                      upon the bond or guaranteed sum to effect compliance with conditions.
                      Nature and Extent of Approved Use
               20.    No structures are approved or permitted within the Park Road or Hastings Street road
                      reserve.
                      Landscaping
               21.    The development site must be landscaped. The works must be undertaken in accordance
                      with an Operational Works approval and the Noosa Plan for that specific area and must
                      include in particular:
                      a.      the works shown on the approved concept plan & sections
                      b.      landscape gardens along the Hastings Street and Park Road frontages adjacent
                              tenancy 3,4 and 5 to incorporate the use of structural soil cells to create suitable volume
                              of growing media capable of sustaining tree growth
                      c.      Corymbia tessellaris to be incorporated as feature trees within the gardens provided
                              with structural soil cells adjacent tenancies 3,4, and 5
                      d.      vegetated screening of any electrical transformers, bin storage areas and the like from
                              the road frontage
                      e.      does not include the use of synthetic turf or similar
               22.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
                      Damage to infrastructure – Hastings Street and Park Road
               23.    Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
                      bridges or roadways must be repaired or reinstated to at least pre-existing conditions.



                                                                                                          Page 7 of 10
Document Set ID: 22818768
Version: 5, Version Date: 23/02/2024

Page 8

               24.    Where damage occurs to any Council asset as a result of the landscaping works, the damage
                      must be repaired immediately where it creates a hazard that presents risk to person or
                      property. Non-hazardous damage must be repaired prior to completion of works.
               5.     REASONS FOR APPROVAL

               1.     The proposal complies with the Overall Outcomes of the Noosa Heads Locality Code as the
                      development will provide for additional outdoor dining and amenities for entertainment and
                      dining premises, providing interest for visitors and residents accommodated in the immediate
                      area, and contributing to a vibrant pedestrian friendly streetscape.
               2.     The development is consistent with the bulk and scale of buildings within proximity to the
                      subject site, presenting an improved, high quality built form and landscaping along both
                      Hastings Street and The Parade.
               6.     REFERRAL AGENCIES
               Not applicable.
               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Infrastructure Charges
               1.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further       information,     please        refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
                      Advertising Devices
               2.     Any advertising devices proposed on the site must comply with the provisions of Council’s
                      Advertising Devices Local Law.
               8.     PROPERTY NOTES

               Not applicable.
               9.     VARIATION APPROVAL DETAILS

               Not applicable.
               10.    FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required             Subject of the required Development Permit

                Development Permit for Building Works           All Building Works

                Development Permit for Operational Works        Landscaping

               11.    SUBMISSIONS

               Not applicable.
               12.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               13.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.


                                                                                                      Page 8 of 10
Document Set ID: 22818768
Version: 5, Version Date: 23/02/2024

Page 9

               Yours faithfully,




               Patrick Murphy
               Manager - Development and Regulation



               Enc:     Appeal Rights
                        Approved Plans/Documents
               cc.      Unitywater

               DECISION NOTICE HISTORY
               •     Original Decision Notice – 19 & 20 December 1979.

               •     Decision Notice – Minor – 51901.3614.01 – 15 October 2020, include additional conditions & advisory notes.

               •     Generally in Accordance Letter – 51901.3614.02 – 15 September 2021.

               •     Decision Notice – Minor – 51901.3614.03 – 15 February 2024, with an amendment to conditions 2,15,16 & 18 and additional
                     conditions 19, 20, 21, 22, 23 & 24.




                                                                                                                                  Page 9 of 10
Document Set ID: 22818768
Version: 5, Version Date: 23/02/2024

Page 10

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 10 of 10
Document Set ID: 22818768
Version: 5, Version Date: 23/02/2024

Used in these records

About this file

File size
179 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Council Decision - Minor Change - 51901 3614 03 [As Published].pdf · 179 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.