Minor Change Existing Approval MCU21 0117 02 & OPW21 1099 02 (As Published) · OPW21/0199.02
23098/C15 C Site Works and Drainage Details – Sheet 3, prepared by 19.08.25
Morgan Consulting Engineers
23098/C20 F Stormwater Drainage Catchment Plan, prepared by Morgan 19.08.25
Consulting Engineers
23098/C21 F Stormwater Drainage Long Sections, prepared by Morgan 19.08.25
Consulting Engineers
23098/C22 F Stormwater Drainage Calculations, prepared by Morgan 19.08.25
Consulting Engineers
23098/C30 F External Roadworks Plan, prepared by Morgan Consulting 19.08.25
Engineers
23098/C60 B Pavement Jointing Plan, prepared by Morgan Consulting 07.08.25
Engineers
23098/C61 B Pavement Jointing Details, prepared by Morgan Consulting 08.08.25
Engineers
CURRENCY PERIOD
49. The Currency Period for this development approval lapses if the development has not
substantially started by 10 November 2027, unless an application to extend the currency
period is approved by Council.
SITE SPECIFIC CONDITIONS
50. Deleted.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
51. All necessary approvals from external service providers (e.g. Unitywater) and external parties
on which the development works are proposed have been obtained and a copy supplied to
Council.
52. Copies of the approved plans, duly signed by the consultant Registered Professional
Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer
Construction prior to the “pre start” meeting.
53. A condition report of the drainage system must be completed for agreement at the prestart
meeting. The condition report is to include a CCTV inspection of the existing stormwater pipe
and must include at least 20m upstream and 50m downstream (or to the next pit) of the
connection point of the proposed works.
54. A condition report including photographs of the frontage of the site as well as the verge area/s
adjacent the length of the proposed stormwater line, capturing in particular any existing
damage to infrastructure, must be completed and submitted to Council prior to the prestart
meeting / prior to any works commencing.
55. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
Page 10 of 31
Document Set ID: 24681870
Version: 7, Version Date: 17/04/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU21 0117 02 & OPW21 1099 02 (As Published).pdfRelated documentApplication case desk ↗
Minor Change Existing Approval MCU21 0117 02 & OPW21 1099 02 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 924 KB (small file)
- File type
No other editions are linked here.