Original source · versioned page text
RFI - Attachment B - Lambert & Rehbein Traffic
Very large file: it may take a few minutes
The original of this document is very large (17.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
LOADING ZONE LOADING ZONE
9271
21642
21642
SITE ACCESS SITE ACCESS
FOOTPATH FOOTPATH
OOF OVER O OF OVER
LINE OF R LINE OF R
FOR STORM WATER PROTECTION
FOR STORM WATER PROTECTION
1:100 SLOPE UP
1:100 SLOPE UP
UP UP
STAIRS STAIRS
WASH WASH
BIN STORE BAY BIN STORE BAY
8000
8000
WASTE - WASTE -
LOADING DOCK LOADING DOCK
159.03 m² 159.03 m²
1:8 SLOPE DOWN
1:8 SLOPE DOWN
TO BASEMENT
TO BASEMENT
EXISTING EXISTING
BUILDING BUILDING
LAMBERT & REHBEIN
ENGINEERS MANAGERS SCIENTISTS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.