Skip to the record
The gold standard in government transparency.

Original source · versioned page text

RFI - Attachment B - Lambert & Rehbein Traffic

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (17.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

6 June, 201                                -7-
Our File Ref: B18254TL001REVB
Contact: Mark Booth




Issue - Northern access
The submitted engineering report states that no roadworks are required while the
submitted site plan and traffic report indicate a new left turn lane. The realigned public
footpath adjacent to the new left turn lane stands within the property boundary.

Lambert & Rehbein response:
Proposed road works are as generally outlined in the attached Functional Layout.

Information Required
17. Provide an amended engineering report that includes the proposed left turn lane and
    the realigned path.
Lambert & Rehbein response:
Refer to MPN Consulting Civil Engineering Report.
18. Provide an amended site plan that indicates a realigned front boundary that includes
    the realigned footpath located wholly within road reserve.
Lambert & Rehbein response:
Refer to Architectural Plans.

Issue – Access easement
The proposed works at the northern access will impact on the existing access
easements that effect the subject sites. While it is acknowledged that the proposal
includes additional easement area Council has concerns with the proposed works
impacting on the rights of the adjoining lots benefitted by the easements.

Lambert & Rehbein response:
The proposed works at the northern access will not impact the existing access
easements. As aforementioned, it is understood that currently all service vehicles access
the site via the southern access on Rene Street and can exit Hofmann Drive via left turn
only. The proposed design will not alter these operational practises.
Log in to download the original file

RFI - Attachment B - Lambert & Rehbein Traffic.pdf · 17.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.