Original source · versioned page text
2014-08-19 Infrastructure and Services Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 19 AUGUST 2014
COMMUNITY SERVICES DEPARTMENT
SECTION RECENT ACHIEVEMENTS CURRENT PRIORITIES LOOKING AHEAD
Waste • Completed Annual Kerbside Bulk Rubbish • Delivery of the Capital Works Program • Rectify issues raised by DHP in the
Collection April to June for 2014/15 environmental audit of the Eumundi Rd
• Trialling the recycling of mattresses at • Develop 5 and 10 year capital works landfill
Eumundi Rd landfill by Briteside instead of program • Approval conditions for provision of
Caloundra • Submit the NGER carbon assessment waste and recycling services at major
• Negotiations with Cleanaway completed for for Eumundi Rd landfill in consultation functions
extension of Portions A B and C of the with Jessica North and Corporate • Rebate on minimum waste charge for
current Waste Management Contract Services multi-unit development
• Finalisation of the landfill capping claim by • Review the valuations of Waste • Consideration of the process for
Cleanaway with a negotiated settlement Management assets consulting with the public prior to
• Prepared draft Capital expenditure program • Update the council web site to improve completion of the Waste Management
for 2014/15 the information available to the public Strategy
• Supported Clean Up Australia in consultation • Develop short term education program • Monitor the methane flaring and viability
with local supporters and contract for 14/15 of generation of electricity at the landfill
• Completed waste management strategy • Calling and letting of contract for • Review the methodology for delivery of
development with Lloyd Consulting recycling metals and batteries at the future annual kerbside collections
• In consultation with Corporate Services landfill and transfer stations • Management of Cell 2.2 until used for
developed long term financial model for • Development of an area at the landfill for waste disposal
Waste Management Budgeting the blending of soil and mulch to
• Renewed a range of contracts for waste produce a value added product for sale
management that expired 30 June 2014
• New contract let for Pump out of Holding
tanks
• Completed preparation of the 14/15 Waste
budget
• Let contract for the development of Noosa
Waste Strategy Options Development to
Golders Associates
• Finalisation of agreement with VISY
Recycling for processing kerbside collected
recyclables at the Nambour MRF
• Flaring of gas at the landfill is capturing
significant volumes of methane gas
converting to carbon dioxide to reduce
environmental impacts
Page 23 of 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.