Skip to the record
Accept no substitutions.

Original source · versioned page text

BBNE00529_0002_0001-REP-001-1-73 Eumundi-Noosa Rd SMP

of 55

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 17, section 1. The text section number identifies this passage in the reader.

TABLE 4.1:WBNM SUB-CATCHMENT FRACTION IMPERVIOUS VALUES – EXISTING SCENARIO

 WBNM Sub-Catchment                            Area (ha)                                      Impervious (%)

 SUBA                                          1.43                                           50

 SUBB                                          4.29                                           10

 Total                                         5.71


The catchment lag parameter adopted was 1.6, which is within the accepted range of values provided in the WBNM technical reference
manual. Rainfall loss rates adopted are consistent with those from the Noosa River Flood Study (2017) and are an initial and continuing loss
of 15 mm and 2.5 mm/h for pervious surfaces respectively, and 0 mm and 0 mm for impervious surfaces. Modelling has been completed for
a range of standard design storm events ranging from the 63.2% AEP to the 1% AEP event, with durations ranging from 10 minutes to 3
hours. Peak flows tabulated in this report represent the peak values extracted from this range of storm events.

TABLE 4.2: EXISTING SCENARIO PEAK FLOWS

                             63% AEP         50% AEP          20% AEP         10% AEP         5% AEP           2% AEP          1% AEP

 WBNM (m3/s)                 0.60            0.72             1.11            1.41            1.68             1.99            2.23


  4.1.2       Developed Scenario (unmitigated)
For the Developed Scenario (unmitigated) the approved development was represented along with the new townhouse area proposed in the
south-west corner of the development. The development was represented within the WBNM model by adjusting the site sub-catchments
and the fractions impervious values. The catchment parameters applied in the Developed Scenario are provided in Table 4.4, with the
approved development represented as low density residential (50% imp), townhouse site (90% imp) and park area (0% imp).

The Developed Scenario catchment plan is shown in Figure 2.2

TABLE 4.3: WBNM SUB-CATCHMENT FRACTION IMPERVIOUS VALUES – DEVELOPED SCENARIO

 WBNM Sub-Catchment                            Area (ha)                                      Impervious (%)

 SUBA                                          1.430                                          50

 SUBB                                          4.408                                          50.7

 SUBC                                          0.140                                          50

 Total                                         5.978                                          -




73 EUMUNDI - NOOSA ROAD, NOOSAVILLE I BBNE00529_0002_0001-REP-001-1                                                                      13
Log in to download the original file

BBNE00529_0002_0001-REP-001-1-73 Eumundi-Noosa Rd SMP.pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.