Landscape Plans OPW Package - 41 Sunshine Beach Rd - 4 May 2021

From the archive 210430 OP WORKS package.zip, inside Op Works for Noosa Mode - 41 Sunshine Beach Road. File date in the archive: 2021-05-05 10:40.

of 11
General Notes
NOTE: This landscape plan must be read in conjunction with the appropriate
statutory approvals and Australian standards.

GENERAL                                                                                 REVEGETATION PLANTING
·  For more detail refer to the project architect's, and engineers drawings.            ·   Plant stock is to be approved by contractor and qualified arborist prior to
                                                                                            acceptance of delivery.
·   Planting shown reflects the design intent, exact numbers and locations will         ·   Mulch bed areas should not exceed a 1:3 grade. where slopes are greater than
    require confirmation on site by the superintendent. any changes to be made              1:3 install biodegradable mulch retaining netting.
                                                                                                                                                                                  SUNSHINE COAST
    to the landscape plan must be approved by the landscape architect and               ·   Where slopes are greater than 1:2 install jute mesh product to manufacturers
    superintendent.                                                                         specification.                                                                       Level 1, 24 Duporth Avenue
                                                                                        ·   Cultivate subgrade to a depth of 150mm and treat with 150mg/m2 of gypsum.            Maroochydore QLD 4558
·   All structures to be approved by the appropriate government departments             ·   Install ameliorated organic topsoil to a depth of 200mm.                             T + 61 7 5499 6188
    prior to any construction taking place.                                             ·   Install organic mulch to a depth of 100mm keeping 50mm clear of plant stems
                                                                                            and tree trunks.
·   All landscape plans presented assume that all base and survey information is        ·   No synthetic, granular blended fertilisers to be used on site. slow release           © Place Design Group Pty Ltd A.C.N. 082 370 063
    accurate and to scale. the contractor shall check landscape plans presented             organic tree tablets shall be used at establishment.
    for any discrepancies with the existing site conditions or other drawings           ·   All plantings shall incorporate the inclusion of a slow release native plant          All information displayed, transmitted or carried within this drawing is
                                                                                                                                                                                  protected by Copyright and Intellectual Property laws.
    presented prior to any construction work taking place. if discrepancies do              fertilizer (as per manufacturers specification) and the use of a soil moisture        The information contained in this document is confidential.
                                                                                                                                                                                  Recipients of this document are prohibited from disclosing the information
    occur these shall be highlighted at once to the superintendent prior to any             retention additive (as per manufacturers specification), placed adjacent the          herein to any person without the written consent of Place Design Group.
    construction work taking place.                                                         plant root ball at the time of planting.                                              Annotated dimensions take precedence over any measures of scale.
                                                                                                                                                                                  Verify all dimensions on site prior to construction.
                                                                                                                                                                                  This drawing may display with permission a combination of specialist and
THE CONTRACTOR SHALL:                                                                   TOPSOIL                                                                                   other consultant(s) input and linework.
                                                                                                                                                                                  Nominated specialist and consultant information contained within this
·   Install silt control fencing as required.                                           ·  Install approved imported topsoil (to comply with aC1419) to planting areas if         document is referenced from their supplied documentation and is
·   Remove all unwanted material from site.                                                ameliorated site topsoil is not available.                                             contained in this document as indicative only and not for construction or
                                                                                                                                                                                  certification purposes.
·   Confirm all dimensions on site prior to construction.                               ·  Where site soil is to be used as topsoil, ameliorate site soil as specified by the
·   Seek instruction from superintendent where level discrepancies, specification          soil testing laboratory. all soil stockpiles are to be maintained to control          PROJECT
    substitutions and poor soil structure occurs.                                          weeds routinely and guard against dispersion by wind or water. stockpiles
                                                                                           shall be limited to a max. height of 2m and may require covering or retaining.                 41 SUNSHINE BEACH
SERVICES                                                                                   stockpiles are not permitted within close proximity to residential properties.
·   The contractor shall confirm the location of all services with relevant             ·       generally soil to be used shall comply with the following specification:                   RD, NOOSA HEADS
    authorities prior to planting and excavation.                                       ·       (1) friable and free draining.
·   All trees must be planted a min. of 1000mm from underground services.               ·       (2) good texture and structure for selected use                                   CLIENT
                                                                                        ·       (3) acceptable conductivity and ph levels for intended plant species to be
SUBSOIL DRAINAGE                                                                           planted.
·    Install sub-soil drains as required and where garden abuts building and                                                                                                               BDH GROUP
     connect into storm water drainage system.                                          MULCH                                                                                         INVESTMENTS PTY LTD
·    Sub soil drains shall incorporate a trench with a geotextile lining, drainage      ·  All mulch proposed to be used on site shall be free of foreign matter including
     gravel backfill material and a 100mm slotted ag pipe to the following                 anthropogenic waste, rock, soil, sediment contamination, weeds and sticks.            NOTES
     specification.                                                                     ·  Planted areas shall be mulched to a minimum 100mm deep to ensure site
  ··      Geotextile material: Geotextile material shall be a non-woven type and           water conservation requirements are achieved.                                         ALL MEMBER SIZES, CONNECTIONS, FOOTINGS ETC
          shall have a strength rating (G) of greater than 900                                                                                                                   ARE TO BE CONFIRMED BY AN ENGINEER. SIZES
                                                                                        ·  Keep mulch 50mm clear of plant stem.                                                  NOMINATED ARE INDICATIVE OF FINAL APPEARANCE
  ··      Backfill material: 20mm drainage aggregate in accordance with AS 2758 -                                                                                                REQUIRED. CONTRACTOR IS TO PROVIDE SHOP
          1998.                                                                         GRADES                                                                                   DRAWINGS FOR APPROVAL BEFORE COMMENCING
  ··      Drainage Pipes: 100mm Ø Slotted ag pipes shall comply with AS 2439-Part       ·  Mulch garden bed areas should not exceed a 1:3 grade and turf areas should            CONSTRUCTION.
          1 "Perforated Drainage Pipe and Associated Fittings". Perforations shall         not exceed a 1:4 grade.
                                                                                                                                                                                 ALL WATER PROOF MEMBRANES, HYDRAULIC
          not exceed 0.7mm in diameter or width.                                                                                                                                 FITTINGS, ELECTRICAL / LIGHTING FITTINGS AND
·    Ensure drainage works correlate with adjacent land and specified finished          IRRIGATION                                                                               REINFORCED CONCRETE STRUCTURES ETC TO
     levels.                                                                            ·    These landscape plans assume all landscaped areas will be irrigated                 ENGINEERS, ARCHITECTS, HYDRAULIC ENGINEERS,
                                                                                             automatically with popup sprinklers and sprays, drip irrigation only to be used     ELECTRICAL ENGINEERS DETAILS AND
SURFACE DRAINAGE                                                                                                                                                                 SPECIFICATIONS.
                                                                                             in small raised planters and on podium in small planted areas. Irrigation           SIZES NOMINATED ARE INDICATIVE OF FINAL
·  Install field inlets to locations and levels as indicated on plans. Finish surface        system to be installed to appropriate standards and by a suitably qualified         APPEARANCE REQUIRED
   pit level flush with adjacent finished surface levels. Ensure positive overland           person and have a minimum 12 month warranty.
    drainage flow to all pits and that no ponding occurs around the pit. Align all      ·    Ensure a non-return valve is fitted to town water connections
   pits square with to paths, pavement patterns, kerbs, walls and alike.
·  Install continuous surface drainage system to locations and levels as indicated      WARRANTIES
    on plans. Finish surface pit level flush with adjacent finished surface levels.     ·  Warranties or guarantees specified shall name the Principal as warrantee.
   Ensure positive overland drainage flow to all continuos pits and that no                Register with manufacturers as necessary. Retain copies delivered with and
   ponding occurs around the pit. Align all pits square with to paths, pavement            compnents and equipment to the Principal.
   patterns, kerbs, walls and alike.                                                    ·  Warranties and/or guarantees to be submitted to the Superintendent for
·  Install pits to manufacturer's recommendations.                                         transmission to the Pricipal within fourteen (14) days after practical
                                                                                           competion.
TURF AREAS                                                                              ·  Commence Warranty periods at practical completion or at acceptance of                                        FOR APPROVAL
·  Cultivate ground to a depth of 150mm and level/trim, treat with 150mg/m2 of             installation, if acceptance is not concurrent with practical completion.
   gypsum.                                                                              ·  If installation is not by manufacturer and product warranty is conditional on
                                                                                                                                                                                ISSUE CODE          ISSUE DESCRIPTION             BY CHK DATE
·  Install 100mm of approved topsoil as specified.                                         the manufacturer's approval of the installer, submit the manufacturer's
                                                                                                                                                                                 01       PRE     PRELIMINARY                     RY    JB    19/04/2021
·  Finished turf grades/contours to be generally smooth, coordinate on site with           written approval of the installing firm.
                                                                                                                                                                                 02       PRE     PRELIMINARY                     RY    JB    24/04/2021
   superintendent and ensure levels are approved prior to turfing.
                                                                                                                                                                                 CA01 CA          COUNCIL APPROVAL                RY    JB    4/05/2021
·  Supply and lay turf as indicated on the drawings.                                    MAINTENANCE TASKS
·  Water turf in well and refer to suppliers maintenance requirement for                Maintain whole of landscape works for establishment period of 13 weeks.
   establishment.                                                                       ·    Irrigation and watering
·  Apply water to maintain soil moisture until established.                               ··       Every 2-3 days during the establishment period.
                                                                                          ··       Once a week there after.
PLANTING LAYOUTS                                                                        ·    Weed removal and wick wiping
·   All planting layouts are to be approved by the landscape architect on site prior      ··        As required to reduce competition and seeding.
    to planting.                                                                        ·    Plant Replacement
                                                                                          ··       Immediately replace plants that die or fail to thrive, are damaged or
GENERAL PLANTING                                                                                   stolen, with plants of the same species and of similar size and quality
·  Plant stock is to be approved by contractor and qualified arborist prior to                     unless otherwise specified.
   acceptance of delivery.                                                              ·    Stakes and Guys
·  Mulch bed areas should not exceed a 1:3 grade. where slopes are greater than           ··       Adjust and/or replace stakes and ties where required. Remove staking
   1:3 install biodegradable mulch retaining netting.Where slopes are greater                      and guying when instructed by the superintedent.
   than 1:2 install jute mesh product to manufacturers specification.                   ·    Remulching
·  For mass planting in mulch bed areas excavate to a depth of 300mm.                     ··       As required to maintain a consistent depth until plants are established.
·  Cultivate subgrade to a depth of 150mm and treat with 150mg/m2 of gypsum.            ·    Monitoring
·  Install specified topsoil and crown bed at centre with mulch as specified.             ··       Provide a monthly report on completed tasks.                                 PRE - Preliminary | CA - Council Approval | T - Tender | CON - Construction

·  No synthetic, granular blended fertilisers to be used on site. slow release                                                                                                   DRAWING TITLE
   organic tree tablets shall be used at establishment.
·  All plantings shall incorporate the inclusion of a slow release native plant                                                                                                   SPECIFICATION
   fertilizer (as per manufacturers specification) and the use of a soil moisture
   retention additive (as per manufacturers specification), placed adjacent the
   plant root ball at the time of planting.
·  Trees are to be certified by a qualified arborist as natspec compliant prior to
   delivery to site. Qualified arborist to select natspec compliant trees at nursery                                                                                             DESIGN   : JB
   and check on delivery to site.
                                                                                                                                                                                 DOCUMENT : RY
                                                                                                                                                                                 PROJECT : 2020069




                                                                                                                                                                                  SCALE AS SHOWN @ A1
                                                                                                                                                                                 DRAWING NUMBER                                REVISION
                                                                                                                                                                                  2020069-001                                  CA01

Log in to download the original (Landscape Plans OPW Package - 41 Sunshine Beach Rd - 4 May 2021.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.