SECTION A - EAST WING
A 1 : 200
NGL +15m
SETABCK
SETABCK
BDY
BDY
10m
6m
RL 33000 - ROOF - UPPER
AC
RL 32000 - ROOF
R F I R E S P O N SE SU M M A RY
RL 29500 - LEVEL 03 - UPPER
VILLA TYPICAL ROOM BALC
RL 28500 - LEVEL 03 ENVIROMENTAL
MANAGEMENT &
CONSERVATION ZONE
BALC TYPICAL ROOM TYPICAL ROOM BALC
RL 26000 - LEVEL 02 - UPPER
CAR PARKING
RL 25000 - LEVEL 02
SERENITY
CLOSE BAR FUNCTION TYPICAL ROOM BALC
RL 21500 - LEVEL 01 LAWN KITCHEN
14. Additional parking level included to dramatically increase on-site parking numbers
NGL EXISTING TREES
DRIVEWAY /
CARPARK SETDOWN BIKES
RL 18000 - GROUND FLOOR RAMP
RL 17500 - GROUND FLOOR - PARKING
CARPARK CARPARK CARPARK
RAMP
RL 14500 - LOWER GROUND
CARPARK CARPARK
RL 11000 - BASEMENT
SECTION B - EAST WING
B 1 : 200
SETABCK
SETABCK
BDY
10m
6m
BDY
NGL +15m
RL 33000 - ROOF - UPPER
AC
RL 32000 - ROOF
RL 29500 - LEVEL 03 - UPPER
BALC TYPICAL ROOM C'DOR TYPICAL ROOM BALC
RL 28500 - LEVEL 03
ENVIROMENTAL
BALC TYPICAL ROOM C'DOR TYPICAL ROOM BALC MANAGEMENT &
RL 26000 - LEVEL 02 - UPPER
CONSERVATION ZONE F
RL 25000 - LEVEL 02
03-02
G
SERENITY
CLOSE GAZEBO RESTAURANT C'DOR
TYPICAL ROOM BALC 03-03
RL 21500 - LEVEL 01
NGL POOL EQUIP. POOL POOL EQUIP.
DRIVEWAY SETDOWN LOBBY BAR
EXISTING TREES
RL 18000 - GROUND FLOOR
RL 17500 - GROUND FLOOR - PARKING
CARPARK
RAMP
CARPARK CARPARK J1
RL 14500 - LOWER GROUND 03-03
CARPARK
RAMP
CARPARK 14 CARPARK
RL 11000 - BASEMENT H1
03-04
SECTION C - EAST WING
C 1 : 200
Keyplan Project
RICHARDS&SPENCE
Document Control Status
Rev Description By Date
CHECK ALL DIMENSIONS ON SITE BEFORE
A
B
DEVELOPMENT APPLICATION
DA ISSUE
GS
GS
06.10.22
07.10.22 DA ISSUE 3 - 7 SERE
FABRICATION OR SETOUT
Level 1, Shop AM5 Ada Lane © COPYRIGHT RICHARDS AND SPENCE PTY LTD
C DA RFI CONSULTANT REVIEW GS 06.05.23 NOOSA HE
D DA RFI PRELIMINARY ISSUE GS 16.05.23
46 James Street E FOR INFORMATION GS 22.05.23
Fortitude Valley ANY FORM OF REPRODUCTION OF THIS F FOR INFORMATION GS 29.05.23 Client:
Brisabane QLD 4006 DRAWING IN FULL OR PART WITHOUT THE
Tel: 617 3257 0077 WRITTEN PERMISSION OF RICHARDS AND
G
H
DA RFI ISSUE
DA RFI ISSUE
MP
GS
23.06.23
30.06.23
CALILE MA
[email protected]
[email protected]
SPENCE PTY LTD CONSTITUTES AN
INFRINGMENT OF COPYRIGHT
I DA RFI ISSUE GS 05.07.23 INVESTME
THE CALILE HOTEL - NOOSA | CALILE MALOUF INVESTMENTS | DA RFI RESPONSE 2100014 | REV C | RICHARDS & SPENCE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.